Site Type

Site Name

 

AB3 - Lower Abernathy Creek

The PIT tag interrogation antennas are installed in parallel as a passover array located in the thalweg of the floodplain at Abernathy Creek (WA.) rkm 1. Coverage of the creek is 100% at baseflow but will decrease during floods or large freshets.

Operated by:

USFWS

First year:

2009

Last year:

2017

RKM:

087.001

Site Contacts

Steward

Doug Peterson
doug_peterson@fws.gov
(360) 425-6072

POC

Benjamen Kennedy
benjamen_kennedy@fws.gov
(360) 425-6072

Map

Operational Dates

Year Start Date End Date Notes
2014 4/11/2014 6/20/2014
2015 3/10/2015
2016
2017
2009 4/21/2009 6/3/2009 First year of operation. Antennae 01 and 02 operated continously throughout the season; Antenna 03 (right bank looking downstream) was not installed this year, leaving ~1 meter of stream not interrogated.
2010 4/8/2010 6/29/2010 AB3 coil 01 started interrogating for the 2010 year at 8:30 am pacific standard time. Coils 02 and 03 have not been installed due to high flow conditions.
2011 4/12/2011 6/28/2011 Installed one additional antenna and started operations for the year.
2012 4/10/2012 6/27/2012 Operations began on April 10.
2013 4/17/2013 7/1/2013

Current and Historic Site Configurations

Config Seq: 110

Start Date: 4/12/2011

End Date:

Config Seq: 100

Start Date: 4/1/2009

End Date: 4/12/2011