ACB - Asotin Cr. at Cloverland Brdg.
ACB is a permanent instream PIT tag interrogation site located near Cloverland Bridge (RKM 4.5) on Asotin Creek, a tributary of the Snake River. As of 10/23/2018 all previous components present at ACB have been replaced and upgraded. The site consists of 2 rows of antennas with each row containing one 20-foot and one 10-foot HDPE antenna, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MTS master controller. The antennas were built and installed by WDFW. The site is connected to grid power to charge the battery bank powering the detection system. A cellular modem is installed on site to provide remote communication and allow for automated data collection, however, only manual data collection from the IS1001-MTS will occur at ACB until further notice. Prior to the upgrade, the site consisted of three antennas powered by an FS1001M.
Operated by:
SRSRB
First year:
2009
Last year:
2018
RKM:
522.234.005
Steward
Steve Bennett
bennett.ecological@gmail.com
(435) 757-5668
POC
Ethan Crawford
Ethan.Crawford@dfw.wa.gov
(509) 751-0823
|