Site Type

Site Name

 

ACB - Asotin Cr. at Cloverland Brdg.

ACB is a permanent instream PIT tag interrogation site located near Cloverland Bridge (RKM 4.5) on Asotin Creek, a tributary of the Snake River. As of 10/23/2018 all previous components present at ACB have been replaced and upgraded. The site consists of 2 rows of antennas with each row containing one 20-foot and one 10-foot HDPE antenna, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MTS master controller. The antennas were built and installed by WDFW. The site is connected to grid power to charge the battery bank powering the detection system. A cellular modem is installed on site to provide remote communication and allow for automated data collection, however, only manual data collection from the IS1001-MTS will occur at ACB until further notice. Prior to the upgrade, the site consisted of three antennas powered by an FS1001M.

Operated by:

SRSRB

First year:

2009

Last year:

2018

RKM:

522.234.005

Site Contacts

Steward

Steve Bennett
bennett.ecological@gmail.com
(435) 757-5668

POC

Ethan Crawford
Ethan.Crawford@dfw.wa.gov
(509) 751-0823

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2014 1/1/2014 1/1/2015 Antenna 3 became operational January 30. Antenna 4 no longer in place.
2010 1/1/2010 1/1/2011 Data up to Dec 19 originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.
2015 1/1/2015 1/1/2016
2016 1/1/2016 1/1/2017
2017 1/1/2017 1/1/2018 SIte down from April 2 - September 15
2011 1/1/2011 1/1/2012 First year of interrogations.
2012 1/1/2012 1/1/2013 Antenna 2 stopped working on April 17. Antenna 1 stopped working on April 23. Both antennas were replaced on August 30.
2013 1/1/2013 1/1/2014 Antennas 3 and 4 down December 10.
2009 7/30/2009 1/1/2010 Data from this year of operations originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.
2018 1/1/2018

Current and Historic Site Configurations

Config Seq: 120

Start Date: 10/23/2018

End Date:

Config Seq: 110

Start Date: 9/15/2017

End Date: 10/23/2018

Config Seq: 100

Start Date: 7/30/2009

End Date: 9/15/2017

Event Logs

ARCHIVED EVENT LOGS