ACB - Asotin Cr. at Cloverland Brdg.

An instream interrogation site in the mainstem of Asotin Creek above the George Creek confluence, underneath the Cloverland Bridge. Site started operations in 2009 with a single row of 5 antennas spanning the width of the creek. The first two years of data were originally reported as Passive Recaptures. The site was officially registered as an interrogation site in PTAGIS December 2010. The site was damaged during high flows in the spring of 2017 and was reconfigured in September 2017 with 3 antennas in a single row. In December 2017, the original passive recapture records were removed and the detection records were submitted as interrogation data.

Operated by:

SRSRB

First year:

2009

Last year:

2017

RKM:

522.234.005

Site Contacts

Steward

Steve Bennett
bennett.ecological@gmail.com
(435) 757-5668

POC

Ethan Crawford
Ethan.Crawford@dfw.wa.gov
(509) 751-0823

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2014 1/1/2014 1/1/2015 Antenna 3 became operational January 30. Antenna 4 no longer in place.
2010 1/1/2010 1/1/2011 Data up to Dec 19 originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.
2015 1/1/2015 1/1/2016
2016
2017
2011 1/1/2011 1/1/2012 First year of interrogations.
2012 1/1/2012 1/1/2013 Antenna 2 stopped working on April 17. Antenna 1 stopped working on April 23. Both antennas were replaced on August 30.
2013 1/1/2013 1/1/2014 Antennas 3 and 4 down December 10.
2009 7/30/2009 1/1/2010 Data from this year of operations originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.

Current and Historic Site Configurations

Config Seq: 110

Start Date: 9/15/2017

End Date:

Config Seq: 100

Start Date: 7/30/2009

End Date: 9/15/2017

Event Logs