Site Type

Site Name

 

CBL - Clear Branch below the Dam

The interrogation site is an instream array in lower Clear Branch located approximately 500m downstream of the Clear Branch Dam. The site uses a single 15 ft PVC cased antenna installed in a pass-over configuration in the tailout of a pool where Middle Fork Irrigation District has a stream gauge. The interrogation site may be operated seasonally or year round depending on winter access and specific needs for monitoring projects or passage studies occurring at Clear Branch Dam. The antenna is controlled by a Biomark IS1001 ACN reader. Power is provided by solar panel(s) charging a deep cycle battery bank. Interrogation data is manually downloaded periodically.

Operated by:

CTWSR

First year:

2016

Last year:

2017

RKM:

273.023.015.001

Site Contacts

Steward

Ryan Gerstenberger
rgerstenberger@hrecn.net
(541) 352-9326

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2016
2017

Current and Historic Site Configurations

Config Seq: 100

Start Date: 5/3/2016

End Date:

Event Logs

ARCHIVED EVENT LOGS