CDP - Cushman Dam Project

The Cushman Hydroelectric Project consists of two high-head dams on the North Fork Skokomish River. Cushman Dam #1 is the upstream most dam and impounds Lake Cushman. Cushman Dam #2 is about two miles downstream and impounds Lake Kokanee. Initial configuration included 2 sets of PIT tag readers: one associated with a juvenile fish passage floating surface collector at Cushman Dam #1 and one in the Cushman Dam fish facility at Cushman Dam #2 following fish handling. In 2017, two antennas were installed in the net transition structure upstream of the floating surface collector. Out migrating smolts are collected at the floating surface collector and transported to the fish facilities from where they are released downstream of Cushman Dam #2. There is no fish passage between the two dams other than through the floating surface collector at Cushman Dam #1. Returning adults are also scanned at the fish facility at Cushman Dam #2.

Operated by:

TPU

First year:

2015

Last year:

2017

RKM:

***

Site Contacts

Steward

Matt Bleich
mbleich@cityoftacoma.org
(253) 502-8794

POC

Matt Peter
mpeter@cityoftacoma.org
(253) 502-8726

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2016 4/11/2016 8/3/2016
2017
2015 5/14/2015 7/8/2015

Current and Historic Site Configurations

Config Seq: 110

Start Date: 3/22/2017

End Date:

Config Seq: 100

Start Date: 5/4/2015

End Date: 3/22/2017

Event Logs

ARCHIVED EVENT LOGS