Site Type

Site Name

 

CLE - Cle Elum Dam Interim Bypass

The experimental juvenile fish bypass flume is located in the second bay of the Cle Elum Dam spillway.

Operated by:

YINN

First year:

2006

Last year:

2010

RKM:

539.299.013

Site Contacts

Steward

David Lind
lind@ykfp.org
(509) 965-6270

POC

Brett Turley
brett.turley@biomark.com
(208) 955-6771

Map

Operational Dates

Year Start Date End Date Notes
2006 First year of operation.
2007 4/3/2007 7/10/2007 The Cle Elum Spillway Bypass watered up at noon (PDT) on April 3, 2007. The bypass was dewatered on July 10, 2007.
2008 5/29/2008 7/13/2008 The Point of Contact this year is Patrick Monk (PMonk@pn.usbr.gov).
2009 5/4/2009 6/25/2009 The spillway flume was initially watered up on April 30, but was immediately shut down to repair a leak. The repaired flume was watered up on May 4. Tags detected between 5/9/09 12:01 and 5/12/09 08:21 are reported with an averaged timestamp of 5/10/09 00:00:00. The spillway flume detection system was deactivated for the year on June 25.
2010 6/7/2010 6/29/2010

Current and Historic Site Configurations

Config Seq: 100

Start Date: 6/1/2006

End Date: 6/30/2010