Site Type

Site Name

 

COP - Lower Coppei Instream Array

COP is a permanent instream PIT tag interrogation site at RKM 0.8 on Coppei Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of one 20-foot PVC antenna, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE ACN controller. The antennas were built and installed by WDFW. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes are installed on site to monitor environmental conditions.

Operated by:

WDFW

First year:

2015

Last year:

2019

RKM:

509.035.082.001

Site Contacts

Steward

Todd Miller
Todd.Miller@dfw.wa.gov
(509) 382-4755

POC

Lance Ross
Lance.Ross@dfw.wa.gov
(509) 382-4755

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2015 12/11/2015 1/1/2016 Start and end dates based on file open and close dates.
2016 1/1/2016 1/1/2017 Start and end dates based on file open and close dates.
2017 1/1/2017 1/1/2018 Start and end dates based on file open and close dates. File gap June 17 - December 29.
2018 1/1/2018 1/1/2019 Start and end dates based on file open and close dates. File gap June 1-10. File gap June 14 - December 23.
2019

Current and Historic Site Configurations

Config Seq: 100

Start Date: 10/15/2015

End Date:

Event Logs

ARCHIVED EVENT LOGS