Site Type

Site Name

 

DRP - Dryden Acc. Pond

DRP is a PIT tag detection system that monitors releases from the Dryden Acclimation Pond. The system was originally installed in 1994 and monitored releases until 1996. The system was reinstalled in 2017 with three 30-inch diameter antennas in series constructed around the outfall pipe which extends into the Wenatchee River. In 2018, two additional antennas were installed on the outfall pipe. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MC (MTS). The antennas were built and installed by WDFW. The site is tied to grid power.

Operated by:

WDFW

First year:

1994

Last year:

2018

RKM:

754.026

Site Contacts

Steward

Jay Deason
jay.deason@dfw.wa.gov
(509) 664-3148 x22

POC

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
(509) 664-3148

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
1994 4/21/1994 5/24/1994 The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1995 4/20/1995 5/17/1995 The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1996 4/18/1996 6/4/1996 The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
2018
2017 4/11/2017 4/27/2017

Current and Historic Site Configurations

Config Seq: 120

Start Date: 4/10/2018

End Date:

Config Seq: 110

Start Date: 4/11/2017

End Date: 4/10/2018

Config Seq: 100

Start Date: 1/1/1994

End Date: 12/31/1996

Event Logs

ARCHIVED EVENT LOGS