ICU - Upper Icicle Instream Array
ICU is a permanent instream PIT tag interrogation site at RKM 10 on Icicle Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of three 20-foot PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE ACN controller. The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes are installed on site to monitor environmental conditions.
Operated by:
WDFW
First year:
2014
Last year:
2019
RKM:
754.041.010
Steward
Jay Deason
jay.deason@dfw.wa.gov
(509) 664-3148 x22
POC
Matthew Stilwater
matthew.stilwater@dfw.wa.gov
(509) 664-3148
|