Site Type

Site Name

 

JPT - Juvenile Pond Touchet

JPT is a permanent instream PIT tag interrogation site at RKM 102 on the Touchet River. The site consists of two rows of antennas, with each row nearly spanning the wetted width of the channel during base flows. Each row consists of two 20-foot HDPE antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MC (MTS).The antennas were built and installed by WDFW. The electrical power at the site is provided by Washington Department of Fish and Wildlife with a 110 electrical outlet located at the Touchet Adult Trap upstream. JPT has remote communication abilities provided by a cellular modem. The original configuration of this site included three antennas per row where were powered by a Biomark FS1001M multiplexor. The original antennas and transceiver were replaced in June/July 2018.

Operated by:

WDFW

First year:

2016

Last year:

2018

RKM:

509.035.102

Site Contacts

Steward

Todd Miller
Todd.Miller@dfw.wa.gov
(509) 382-4755

POC

Jerry Dedloff
Jerry.Dedloff@dfw.wa.gov
(509) 382-4755

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2016 7/12/2016 1/1/2017
2017 1/1/2017 2/13/2017 Site damaged by high ice flows in February and no data receieved after that.
2018 7/3/2018 Site reinstalled June 27-July 3 with four new 20ft antennas and IS1001-MTS.

Current and Historic Site Configurations

Config Seq: 110

Start Date: 7/3/2018

End Date:

Config Seq: 100

Start Date: 7/12/2016

End Date: 7/3/2018

Event Logs

ARCHIVED EVENT LOGS