12/18/2013 12:00 AM |
MWF site installed and operational |
|
graceara |
02/20/2014 11:09 AM |
Registered new site MWF - Whitefish SC in Methow River. |
|
NTancreto@psmfc.org |
04/07/2014 10:33 AM |
The USGS will no longer be responsible for this site, please contact Michael Newsom (MNewsom@usbr.gov) if you have any questions about this site. |
|
kmartens |
06/06/2014 11:21 AM |
The downstream system F1-F6 was down due to a faulty outlet and switch board from 5/20/14 @ 08:25 to 5/28/14 @ 18:25 and from 6/1/14 @ 22:00 to 6/5/14 @ 11:30 |
|
graceara |
08/30/2014 02:31 PM |
MWF lower mux system (F0) down from 8/30/14. Equipment stolen from site. Hope to replace spring 2015. |
|
graceara |
11/07/2014 12:31 PM |
F0 lower site equipment replaced, up and running again |
|
graceara |
05/20/2015 05:00 PM |
Site down on 5/20/15 @ 17:00 due to stolen battery charger |
|
graceara |
06/21/2015 09:09 PM |
Antenna 4 from upstream system (E0) down from 5/19/15 to 6/21/15 |
|
graceara |
07/15/2015 05:00 PM |
Lower site F0 was down due to stolen battery charger. Charger replaced, site up and running again. |
|
graceara |
08/29/2015 05:00 PM |
Side channel disconnected at top of crib structure. Top and bottom of side channel still connected to mainstem. |
|
graceara |
09/20/2015 12:00 AM |
Lower crib pool disconnected from mainstem at bottom end |
|
graceara |
10/02/2015 12:00 AM |
Lower crib pool connected at bottom end, still disconnected at top end from rest of side channel |
|
graceara |
10/08/2015 12:00 AM |
Side channel fully connected again |
|
graceara |
10/25/2015 12:00 AM |
Upper site MWFE0 antenna 4 down from 8/18/15 to 10/25/15 - broken cable |
|
graceara |
02/11/2016 12:00 AM |
Lower site MWFF0 down from 9/14/15 to 2/11/16 - stolen charger, damaged power cable, battery replacement |
|
graceara |
04/11/2016 12:00 AM |
Upper site MWFE0 antenna 4 down - cable pulled out in high flows |
|
graceara |
04/20/2016 12:00 AM |
Lower site MWFF0 antenna 6 down from 4/20/16 |
|
graceara |
05/08/2016 10:28 AM |
MWFF0 antenna 3 down |
|
graceara |
06/20/2016 12:00 AM |
MWFE6 back up |
|
graceara |
06/28/2016 10:40 AM |
MWFE0 upper site: antenna 3 dry, taken out of sequence.
MWFE0 upper site: antenna 4 up and running |
|
graceara |
06/28/2016 02:53 PM |
MWF F0 lower site antenna 2 was down 4/20/16 to 6/27/16 at 12:40. Previous event refers to antenna 6 down but cables were found to be swapped to these two antennas. |
|
graceara |
06/28/2016 02:53 PM |
MWF F0 lower site cables to antennas 2 and 6 were accidentally swapped from 11/7/14 to 6/28/16. |
|
graceara |
07/09/2016 03:03 AM |
Cable for antenna 1 accidentally attached to antenna 5 after new mux install 11/7/14 to 6/28/16 at 13:10.
Cable for antenna 5 accidentally attached to antenna 1 after new mux install 11/7/14 to 6/28/16 at 13:10.
Cable for antenna 3 attached to antenna 5 from 6/28/16 at 13:10 to 7/1/16 at 10:56.
Cable for antenna 5 attached to antenna 5 beginning 7/1/16 at 10:56
Antenna 1 taken out of sequence - dry and out of water 6/28/16 @ 13:10
Antenna 3 down from 5/8/16 to 7/1/16 at 17:56
Antenna 3 down from 7/9/16 at 03:03 – damaged
|
|
graceara |
08/17/2016 09:18 AM |
Lower crib pool disconnected at top from the rest of the side channel. Still a connection at bottom to mainstem. |
|
graceara |
10/13/2016 11:00 AM |
MWFF0 antenna 3 repaired and put back instream. |
|
graceara |
01/26/2017 01:00 AM |
MWF F0 lower system antenna 3 up and down from 1-11-17 01:00 to 1-26-17 |
|
graceara |
03/11/2017 12:00 AM |
WFI pools connected |
|
graceara |
05/05/2017 12:00 AM |
MWFF6 down |
|
graceara |
05/22/2017 12:00 AM |
MWFE3 down |
|
graceara |
05/23/2017 12:00 AM |
MWFE2 down |
|
graceara |
05/25/2017 12:00 AM |
MWFE1 down |
|
graceara |
05/31/2017 12:00 AM |
MWFE6 down |
|
graceara |
05/31/2017 12:00 AM |
MWFF5 down |
|
graceara |
06/01/2017 12:00 AM |
MWFF2 down |
|
graceara |
06/21/2017 12:00 AM |
MWFE4 back up |
|
graceara |
06/21/2017 12:00 AM |
MWFE4 down |
|
graceara |
06/29/2017 12:00 AM |
MWFE4 and E3 back up |
|
graceara |
07/06/2017 12:00 AM |
MWFF2 back up |
|
graceara |
07/06/2017 12:00 AM |
MWFF5 back up |
|
graceara |
07/07/2017 12:00 AM |
MWFF5 down |
|
graceara |
07/12/2017 12:00 AM |
MWFE0 antennas 1 and 2 replaced, up and running again |
|
graceara |
07/12/2017 12:00 AM |
MWFF0 Antenna 6 up |
|
graceara |
07/19/2017 12:00 AM |
MWFF0 Antenna 5 up |
|
graceara |
08/10/2017 12:00 AM |
Pools 1-4 disconnected but connection at bottom of crib pool remains |
|
graceara |
09/03/2017 12:00 AM |
Connection to pool below upper antenna. All pools below disconnected. Crib pool still connected at bottom. |
|
graceara |
11/15/2017 09:00 AM |
MWFF0 Antenna 5 down from 8/11/17 17:00 to 11/15/17 |
|
graceara |
11/23/2017 12:00 AM |
Side channel fully connected |
|
graceara |
11/29/2017 08:00 PM |
F0 site down from 11/15/17 at 0600 to 11/21/17 1400
F0 site down from 11/23/17 at 0700 to 11/24/17 at 1600
F0 site down from 11/27/ at 0600 to 11/27/17 at 1100
F0 site down from 11/29/17 at 1300 to 11/29/17 at 2000
|
|
graceara |
12/04/2017 09:00 AM |
Site up every four hours, down every 4 hours, from 11/30/17 at 0200 to 12/4/17 at 0900 (broken fuse in switcher)
|
|
graceara |
02/05/2018 09:00 AM |
12/24/17 side channel disconnected above crib
2/5/18 side channel fully connected |
|
graceara |
02/09/2018 09:00 AM |
MWFE0
1/23/18 at 08:00 to 2/2/18 antenna 1 down
2/7/18 at 18:00 to 2/9/18 at 18:00 antenna 1 down
|
|
graceara |
02/27/2018 03:33 PM |
MWFF0 antenna 3 down from 2/23/18 at 0500 to 2/27/18 at 1200. Antenna replaced. |
|
graceara |
03/15/2018 12:00 AM |
Side channel disconnected above crib from 3/9/18 to 3/15/18 |
|
graceara |
05/06/2018 12:00 AM |
MWFF0 antenna 3 down |
|
graceara |
05/08/2018 12:00 AM |
MWFE0 site down: removed onshore equipment due to high flows |
|
graceara |
05/09/2018 12:00 AM |
MWFF0 antennas 1 and 2 down |
|
graceara |
05/31/2018 11:08 AM |
MWFE0 mux system reinstalled. Antennas 1, 2, and 3 are down. |
|
graceara |
06/05/2018 11:08 AM |
MWFE0 antennas 2 and 3 back up. |
|
graceara |
07/11/2018 11:04 AM |
MWFF0 antenna 1 up |
|
graceara |
07/11/2018 11:30 PM |
MWFE0 upper site: Antenna 1 up from 7-11 to 7-12-18. |
|
graceara |
07/13/2018 11:04 AM |
MWFF0 antenna 2 up |
|
graceara |
07/26/2018 03:30 PM |
MWFF0 lower site: Installed new antenna at antenna 3 to replace one lost in flood. Site now fully operational. |
|
graceara |
07/26/2018 11:30 PM |
MWFE0 upper site: Antenna 5 down from 7-24-18 to 7-26-18 |
|
graceara |
08/01/2018 11:30 PM |
MWFE0 upper site: Antenna 1 up and running.
Took antennas 3 and 6 out of sequence, they are dry as flows have receded. |
|
graceara |
08/02/2018 11:30 PM |
MWFF0 lower site: Took antennas 1 and 4 out of sequence, they are dry as flows have receded. |
|
graceara |
08/09/2018 10:28 AM |
320 cfs at Winthrop. Crib pool disconnected at top end, pools 2, 3 disconnected. Shallow connection between pool 4 and crib. |
|
graceara |
09/06/2018 10:28 AM |
205 cfs at Winthrop. All pools disconnected from bottom up to pool just below top antenna. Crib pool still connected at bottom to mainstem. |
|
graceara |
09/07/2018 04:00 PM |
MWFF0 antenna 2 down from 8/26/18 to 9/7/18 |
|
graceara |
10/02/2018 04:00 PM |
MWFE0 Shut down system and removed antennas and all equipment permanently |
|
graceara |
10/08/2018 04:00 PM |
MWFF0 Shut down system and removed antennas and all equipment permanently |
|
graceara |