Site Type

Site Name

 

PEU - Upper Peshastin Creek

This is a permanent instream PIT tag interrogation site at rkm 17 on Peshastin Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of two 10-foot PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE ACN controller. The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes are installed on site to monitor environmental conditions.

Operated by:

WDFW

First year:

2016

Last year:

2017

RKM:

754.029.017

Site Contacts

Steward

Jay Deason
jay.deason@dfw.wa.gov
(509) 664-3148 x22

POC

Matthew Stilwater
Matthew.Stilwater@dfw.wa.gov
(509) 664-3148

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2016
2017

Current and Historic Site Configurations

Config Seq: 100

Start Date: 3/22/2016

End Date:

Event Logs

ARCHIVED EVENT LOGS