Site Type

Site Name

 

RRF - Rocky Reach Fishway

Rocky Reach Dam Adult Fishway

Operated by:

CPUD

First year:

2006

Last year:

2017

RKM:

763

Site Contacts

Steward

Thad Mosey
thad.mosey@chelanpud.org
(509) 661-4451

POC

Brett Turley
brett.turley@biomark.com
(208) 955-6771

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2014 1/1/2014 1/1/2015 Ladder dewatered January 2-March 12. Detection equipment activated March 17. New antenna added at entrance to trap on April 23.
2016
2015 1/1/2015 1/1/2016 Ladder dewatered January 6-February 26.
2017
2006 3/1/2006 12/4/2006 First year of operation.
2007 3/20/2007 12/3/2007 The Rocky Reach adult fishway watered up on March 1, 2007. The PIT tag transceivers were enabled on March 20. The ladder was dewatered on December 3, 2007, and will remain dewatered until late winter, 2008.
2008 3/3/2008 12/2/2008 The Rocky Reach Dam fishway watered-up on March 3, 2008. The ladder was dewatered for the winter on December 2, 2008.
2009 3/9/2009 12/1/2009 The fishway at Rocky Reach Dam was dewatered between December 2, 2008 and March 9, 2009. The fishway dewatered for the year on Dec. 1, 2009.
2010 3/1/2010 11/30/2010 The single adult fishway at Rocky Reach Dam watered up on March 1, 2010, and operated continuously until it was dewatered on November 30.
2011 3/3/2011 12/5/2011 The adult fishway, watered up on February 27. However, the PIT tag detectors were not activated until March 3. The ladder was dewatered for the season and transceivers put into standby on December 5.
2012 3/1/2012 12/17/2012 The fishway was watered up and transceivers activated on March 1. The fishway was dewatered on December 17.
2013 1/1/2013 1/1/2014

Current and Historic Site Configurations

Config Seq: 110

Start Date: 4/22/2014

End Date:

Config Seq: 100

Start Date: 3/1/2006

End Date: 4/22/2014