Site Type

Site Name

 

RRJ - Rocky Reach Dam Juvenile

This site was operated between 1996 and 2000 using 400 kHz and, later, 134.2 kHz non-ISO detection systems. It operated between 2000 and 2002 using a combination of 134.2 kHz ISO and non-ISO detectors. The site was revived in 2010, with four MUXed 134.2 kHz ISO antennas incorporated into the flowspreaders of the Juvenile Fish Bypass Surface Collector.

Operated by:

CPUD

First year:

1996

Last year:

2017

RKM:

763

Site Contacts

Steward

Thad Mosey
thad.mosey@chelanpud.org
(509) 661-4451

POC

Brett Turley
brett.turley@biomark.com
(208) 955-6771

Map

Operational Dates

Year Start Date End Date Notes
2014 3/12/2014 10/29/2014
2016
2015 3/17/2015 9/1/2015
2017
1996 4/25/1996 7/19/1996 The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1997 4/7/1997 8/15/1997 The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1998 4/16/1998 5/14/1998 Dates and times based on first/last reported detections.
1999 3/31/1999 7/30/1999 Dates and times based on first/last reported detections.
2000 4/5/2000 6/1/2000 Dates and times based on first/last reported detections.
2001 4/6/2001 8/6/2001 Dates and times based on first/last reported detections.
2002 4/1/2002 9/24/2002 Contact CPUD/BioMark for the actual dates of operation.
2010 4/1/2010 9/1/2010 During the installation and testing period at the newly-configured DSM surface bypass collector, the bypass was operated and PIT-tagged fish released by others were detected (March 5, 16, and 17). Test fish were released into the system on March 16th. The detection system was operated the morning of the 17th and then operation was suspended until April 1, 2010. Monitoring was continuous between April 1 and August 31, 2010.
2011 3/22/2011 9/1/2011 Dewatered and shut down September 1.
2012 3/28/2012 9/1/2012 Detection equipment began operations on March 28 and planned water up for April 1.
2013 3/6/2013 9/1/2013 Water up scheduled for April 1. Site dewatered on September 1.

Current and Historic Site Configurations

Config Seq: 160

Start Date: 3/18/2015

End Date:

Config Seq: 150

Start Date: 3/1/2010

End Date: 3/18/2015

Config Seq: 140

Start Date: 2/25/2000

End Date: 9/24/2002

Config Seq: 130

Start Date: 4/26/1999

End Date: 2/25/2000

Config Seq: 120

Start Date: 3/11/1998

End Date: 4/26/1999

Config Seq: 110

Start Date: 4/4/1997

End Date: 3/11/1998

Config Seq: 100

Start Date: 4/10/1996

End Date: 4/4/1997

Event Logs