Site Type

Site Name

 

SHP - Swift Hydroelectric Project

Fish enter the facility via a floating surface collector where they are sorted by size. Juvenile fish are either shunted directly to a holding tank to await transport downstream of Merwin Dam or they are sent to a sampling table where they are examined, possibly tagged, and sorted to either upstream of the Swift reservoir or downstream of Merwin Dam. All fish diverted to either tank pass through a PIT tag detector. There are two identical holding and sampling areas on the collector in which fish can travel. These areas are referred to the Port Side and Starboard Side. The port antenna was identified as 01 and the starboard antenna was 02. In February 2018 a third antenna was installed just above the sorting rack with an antenna ID of 01, and the port and starboard antennas were changed to 03 and 02, respectively.

Operated by:

PCE

First year:

2016

Last year:

2017

RKM:

140.070

Site Contacts

Steward

Mark Ferraiolo
mark.ferraiolo@pacificorp.com
(360) 225-4446

POC

Kyle Meier
kyle.meier@biomark.com
(360) 561-0263

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2016 10/21/2016
2017

Current and Historic Site Configurations

Config Seq: 110

Start Date: 2/8/2018

End Date:

Config Seq: 100

Start Date: 10/21/2016

End Date: 2/8/2018

Event Logs

ARCHIVED EVENT LOGS