In-stream detection system consisting of two antennas deployed serially about 30 meters apart in Wimpey Creek and is approximately 70 meters upstream of the confluence with the Lemhi River. WPC is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. The initial configuration consisting of three arrays of three antennas each was replaced in August of 2017 to two 20 foot ABS antennas. Site electricity comes from the adjacent electrical service lines and remote communication is provided by a cellular telephone modem. Environmental conditions are monitored by air temperature. Site was removed in April 2018

Operated by:

BIOMRK

First year:

2013

Last year:

2018

RKM:

522.303.416.020.001

Site Contacts

Steward

Kevin Peterson
Kevin.Peterson@biomark.com
(208) 275-0011

POC

Braden Lott
braden.lott@biomark.com
(208) 310-9149

Map

Photo Gallery

Operational Dates

Year Start Date End Date Notes
2013 10/9/2013 1/1/2014 Start date based on first file loaded.
2014 1/1/2014 1/1/2015 No operational information received, but files submitted regularly throughout the year. Some gaps between files do exist.
2016 1/1/2016 1/1/2017 No operational information received, but files submitted regularly throughout the year. Some gaps between files do exist.
2015 1/1/2015 1/1/2016 No operational information received, but files submitted regularly throughout the year. Some gaps between files do exist.
2017 1/1/2017 1/1/2018 No operational information received, but gap in data from February 10 - September 14.
2018 1/1/2018 4/25/2018 End date based on last file loaded. Site permanently removed April 26.

Current and Historic Site Configurations

Config Seq: 110

Start Date: 9/1/2017

End Date: 4/26/2018

Config Seq: 100

Start Date: 10/9/2013

End Date: 9/1/2017