EVENT LOG FOR SITE AB1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 08/13/2007 12:46 Jim Site computer was shutdown from 0600 to 1200 on 8/13/07. There are no minimon files to fill the data gap. Mux buffer was checked and there were no fish detections during this time period. 04/06/2007 10:48 Jim The computer at the AB1 site was not running from 4/5/07 at 12:00 to 4/6/07 at 07:18. The buffer on the Mux has been checked ant there were no fish detections during this time period. 01/30/2007 16:11 Jim Antenna 2 installed at 4 PM on 1/30/07. Site is now fully operational. 01/29/2007 13:43 Jim Antennas 1 and 3 installed at 4 PM on 1/25/07. Antenna 2 will be installed at a later date. 01/01/2007 00:00 PTOC_Bot Annual log file initiation for AB1 #### End of Event Log for AB1 ###