EVENT LOG FOR SITE AB3 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 06/30/2011 14:29 Jerone AB3 discontinued operations for the 2011 season on June 28th 2011. The last file uploaded to PTAGIS includes data through 6AM on this date. 04/22/2011 07:59 Nicole Updated site configuration to include a fourth antenna. Updated obs_site_dates. 04/18/2011 12:52 Kurt AB3 was reinstalled approximately 50m West of its original site, to accomodate the change in the location of the bed of the creek which occurred over the Winter. A fourth antenna was added to accomodate the increased width of the stream bed. The MUX firmware was upgraded to Version 2.1, so the coils MUX ID is now F0, and the antennas are now F1, F2, F3 and F4 (left to right facing downstream). The system was put into operation for the season at approximately 4:30 PM Pacific Standard Time April 12. Kurt Steinke Electronics Engineer US Fish & Wildlife Service Abernathy Fish Technology Center 1440 Abernathy Creek Road Longview, WA 98632 Phone 360-425-6072 ext 330 FAX 360-636-1855 01/01/2011 00:00 PTOC_Bot Annual log file initiation for AB3 #### End of Event Log for AB3 ###