EVENT LOG FOR SITE 8_B2J Most recent activity to be listed first. First line of each entry lists date, time & who is reporting. Subsequent lines of each entry aligned under Time column. Date Time Who What -------- ----- -------- ----------------------------------------------- 10/06/98 14:06 scottl This site has been shut down for the season. Data collection ended at approx. 1230 on Monday, Oct. 5, 98. 09/20/98 00:00 davem SMP personnel report that 24-hour PIT-tag operations ended at midnight on September 19. Subsequent to this date, the detector is operating eight hours/day, from 1600h-2400h. 09/15/98 16:23 dlwarf Ed Nunnallee called to say that the loop tuner for coil 06 has been removed for use at B2A. The coil will be down for the rest of the season. 08/21/98 15:02 carters I visited Bonneville today. It seems that the new firewall that was installe I couldn't ping, telnet or ftp using the dial-up network configuration there, changed the DNS address and those things worked, but the mailer didn't. I was asked to leave the project because of heightened security due to the Afganistan and Sudan missell retaliations yesterday, so couldn't finish troubleshooting. When I got back, Todd had relaxed certain security policies on the firewall, and the mail from BVA made it, but rather than being encapsulated as SMTP packets, the connection made a bunch of telnet type packets to encapsulate the mail. This may have incorrectly encoded packets were rejected by the firewall. 07/27/98 08:49 scottl Upgraded the mailer software from ver. 1.3 to 1.3b. 07/17/98 08:55 scottl Called Dean B. at the DSM1 and asked check on the computer at DSM1. He called back and indicated that it took several manual attempts to upload the data to PTAGIS. He also indicated that the phone line had alot of static which would explain the problems with the process. 06/02/98 11:04 sandyd 1June98. Replaced water damaged timer-tag on coil 8. No change in tag code (Nunnallee) 05/13/98 15:14 sandyd 12MAY98 Replaced clock card in controller 05/08/98 16:25 scottl Called SMP to verify operation of collection platform. Informed them to follow procedures outline in the windows 95' troubleshooting guide. Will follow up for status. 04/02/98 10:05 carters Rick Martinson reports that 24 hour monitoring of the four coil monitor in DSM2 began at 08:00 April 1, 1998.