EVENT LOG FOR SITE B2J The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/05/2013 11:20 scottl Per Site Bio, the Full flow system watered up on Nov.1st, at 0700 and will remain that way until mid December. 10/24/2013 12:24 thumphre The switch over from dual platforms to M4 is complete. All of the MM related items were removed, PC's, Line Driver and Rocket Port Expansion Chassis. The M4 Device Masters were installed in the HSIP. Two larger UPSs were installed on the DCP. M4 was moved to the DCP. The HSIP devices, modem nests and DM's were powered by UPS. The Primary UPS also powers the PLC, all communication devices (2 switches, DSL modem and the Sonicwall). The DSL modem and Sonicwall were moved into the Pittag Room's Communication cabinet. 10/24/2013 07:35 Alan Platform maintenance caused some file gaps on 10/22 and 10/23 2013. The gaps are inconsequential as the site is dewatered. The expected water-up date is 11/12/2013. 10/17/2013 08:14 dlwarf Correction to last entry: Should have read "being remodeled". The remodel should be complete by the week of 10/28/13. The Full Flow system will water up again in mid November. 10/17/2013 07:53 dlwarf The PIT tag room is remodeled to eliminate the Multimon platform, add larger UPSs and add DeviceMasters to the HSIP. 10/17/2013 07:07 thumphre Rather than change all the transceiver in-active times from 65 to 0 I shut off email alerts from both Primary and Secondary machines. This was done to eliminated the email alerts that are the result of removing the 4 way cables yesterday. 10/17/2013 06:11 thumphre The 4 way splitter cables for all transceivers except for 01 and 02 were removed for modification while the facility is de-watered. 10/15/2013 06:23 thumphre User: thumphrey. Site: B2J. Comments: Received email from HMI that the FF De-watered at 3:45 pm on 10/12/2013 and Primary Bypass was activated at 7:05 AM. Event date: 10/12/2013 7:05:00 AM. Site activity: down 10/15/2013 06:22 thumphre User: thumphrey. Site: B2J. Comments: Received email from HMI that the FF De-watered at 3:45 pm on 10/12/2013. Event date: 10/12/2013 3:45:00 PM. Site activity: down 10/06/2013 06:37 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 01: Noise Level High. 09/19/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/19 06:10:46 09/19/2013 06:04 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: B2J: Noise Level High. 09/19/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/19 05:44:55 09/18/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/18 06:04:05 09/18/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/18 06:02:24 09/18/2013 06:33 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: 02: Noise Level High. 09/17/2013 09:04 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/17 06:02:25 09/17/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/17 05:11:47 09/16/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/16 06:04:07 09/16/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/16 06:02:27 09/15/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/15 06:02:28 09/15/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/15 05:14:29 09/14/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/14 06:04:56 09/14/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/14 06:02:29 09/13/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/13 06:04:07 09/13/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/13 05:47:17 09/12/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/12 06:09:40 09/12/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/12 06:06:21 09/12/2013 07:11 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: A GMC was performed 09/11. Clearing TASS.. Error: 02: Noise Level High. 01: Noise Level High. 09/12/2013 07:10 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: A GMC was performed 09/11. Clearing TASS.. Error: B2J: Noise Level High. 09/11/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/11 06:02:32 09/11/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/11 05:19:16 09/10/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/10 06:04:07 09/10/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/10 06:02:33 09/09/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/09 06:09:46 09/09/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/09 05:15:56 09/08/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/08 06:04:14 09/08/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/08 06:02:35 09/08/2013 07:42 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing TASS. Alarm will be investigated during the next site visit.. Error: 02: Noise Level High. 09/07/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/07 06:02:37 09/07/2013 08:15 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing TASS. Error: 02: Noise Level High. 09/07/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/07 05:22:37 09/06/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/06 06:05:26 09/06/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/06 06:02:50 09/05/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/05 06:03:15 09/05/2013 06:48 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing all errors. Error: B2J: Noise Level High. B2J: Virtual Tag Test Failed. B2J: Test Tag Failed. B2J: Reader Set To Master. B2J: Sync. Input Not Present. B2J: Tuning Capacitance Low. B2J: Tuning Out Of Range. B2J: Warning: the difference in system time between the two M4 cluster machines is 30.00 seconds.. 09/05/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/05 05:50:13 09/04/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/04 06:05:01 09/04/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/04 06:02:40 09/03/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/03 06:02:41 09/03/2013 06:49 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing TASS.. Error: 02: Noise Level High. 09/03/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/03 05:11:16 09/02/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/09/02 06:04:15 09/02/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/09/02 06:02:42 09/01/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/09/01 06:02:43 09/01/2013 07:03 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: Noted. Error: 02: Noise Level High. 09/01/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/09/01 05:16:14 08/31/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/31 06:06:23 08/31/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/31 06:04:55 08/31/2013 06:43 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: Noted. Error: 02: Noise Level High. 08/30/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/30 06:06:36 08/30/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/30 05:32:01 08/29/2013 11:25 rclark Performed site GMC on 8/29/2013. All transceivers were checked for tune and adjusted as needed. Multmon PC1 was 49 seconds and PC2 was 91 seconds behind atomic time. Adjusted clocks to within 1 second of atomic time. B2J13241.206 was submitted as a gap file. Files on PC2 were archived. There are no problems to report. 08/29/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/29 06:15:04 08/29/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/29 06:07:50 08/28/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/28 06:01:59 08/28/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/28 05:17:58 08/27/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/27 06:04:09 08/27/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/27 06:02:00 08/27/2013 06:04 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: Unknown cause for the increased noise level on 8/26. Will continue to monitor.. Error: 02: Noise Level High. 08/26/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/26 06:02:01 08/26/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/26 05:07:24 08/25/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/25 06:04:13 08/25/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/25 06:02:03 08/24/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/24 06:02:03 08/24/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/24 05:11:19 08/23/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/23 06:05:05 08/23/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/23 06:02:18 08/22/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/22 06:01:11 08/22/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/22 05:56:07 08/21/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/21 06:04:18 08/21/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/21 06:02:31 08/21/2013 06:53 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: They will be investigated during the next site visit. This transceiver is reading PIT tags and timer tags well.. Error: 02: Virtual Tag Test Failed. 02: Noise Level High. 08/20/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/20 06:02:08 08/20/2013 06:45 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be investigated during the next site visit.. Error: 02: Noise Level High. 08/20/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/20 05:23:48 08/19/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/19 06:03:43 08/19/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/19 06:02:09 08/19/2013 08:53 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be addressed during the next site visit. Error: 02: Noise Level High. 02: Virtual Tag Test Failed. 08/18/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/18 06:02:10 08/18/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/18 05:23:44 08/17/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/17 06:04:32 08/17/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/17 06:02:11 08/16/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/16 06:02:12 08/16/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/16 05:22:27 08/15/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/15 06:04:48 08/15/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/15 06:02:15 08/14/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/14 06:02:14 08/14/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/14 05:17:37 08/13/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/13 06:04:37 08/13/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/13 06:02:16 08/12/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/12 06:05:04 08/12/2013 06:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/12 05:22:23 08/11/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/11 06:04:02 08/11/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/11 06:02:18 08/11/2013 09:03 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/08/11 06:01:12 08/10/2013 09:04 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/10 06:02:19 08/10/2013 07:28 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing TASS.. Error: 02: Virtual Tag Test Failed. 04: Virtual Tag Test Failed. 08/10/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/10 05:12:06 08/09/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/09 06:39:30 08/09/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/09 06:04:35 08/08/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/08/08 11:44:17 08/08/2013 12:02 rclark Performed site GMC on 8/8/2013. All transceivers were checked for tune and adjusted as needed. 20 sticks were thrown at the separator gate. All sticks were read on all coils and diverted properly. PC1 is 20 seconds and PC2 is 34 seconds behind atomic time. Files on PC2 were archived. There are no problems to report. 08/08/2013 06:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/08 05:59:25 08/08/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/08 05:47:41 08/07/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/07 06:03:53 08/07/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/07 06:02:22 08/06/2013 09:04 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/06 06:03:36 08/06/2013 06:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/06 05:20:38 08/05/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/05 06:03:54 08/05/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/05 06:02:25 08/05/2013 06:27 darren@b A4:InputSyncDetect,A4:ReaderReset: Alarms caused by a reader reset. 08/04/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/04 06:02:37 08/04/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/04 05:17:16 08/03/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/03 06:03:57 08/03/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/03 06:02:27 08/02/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/08/02 06:00:58 08/02/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/08/02 05:53:53 08/01/2013 12:25 Dean_Bal As of 0700 on Thursday, 1 August, B2J returned to "Modified Sampling Mode" due to river temperatures reaching 70.0F. The upstream switchgate was placed in bypass at that time. Sampling will take place every other day as per the Fish Passage Plan operation protocols until the daily average drops to 69.5 F. Sample and bypass mode will occur on alternating 24 hours periods (0700-0700). This means the upstream switchgate will be moved (change state) at 0700 daily. 08/01/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/08/01 06:15:21 08/01/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/08/01 06:10:26 07/31/2013 06:17 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 02: Noise Level High. 07/30/2013 11:43 Dean_Bal As of 0700 on 30 July, normal sampling was restored at B2J as river temperatures dropped at or below 69.5°F. The system will stay in ‘Sample’ until river temps reach 70°F. 07/30/2013 09:05 Dean_Bal As of 0700 on 30 July, normal sampling was restored at B2J as river temperatures dropped at or below 69.5°F. The system will stay in ‘Sample’ until river temps reach 70°F. 07/30/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/07/30 06:02:31 07/30/2013 07:16 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: noted. Error: 02: Noise Level High. 02: Virtual Tag Test Failed. 07/30/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/07/30 05:25:53 07/29/2013 09:04 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/07/29 06:05:14 07/29/2013 09:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/07/29 06:03:02 07/28/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/07/28 06:02:33 07/28/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/07/28 05:10:03 07/27/2013 09:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/07/27 06:04:05 07/27/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/07/27 06:02:36 07/26/2013 06:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/07/26 05:53:09 07/26/2013 06:03 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/07/26 05:35:13 07/25/2013 10:20 rclark Performed site GMC on 7/25/2013. All transceivers were checked for tune and adjusted as needed. Multimon PC1 was 31 seconds ahead of and PC2 was 90 seconds behind atomic time. Adjusted clocks to within 1 second of atomic time. B2J13206.206 was submitted as a gap file. Files on PC2 were archived. There are no problems to report. 07/25/2013 10:18 thumphre In regards to the the 3-way not rotating right alarm. The facility is in bypass (fish going to the river) and the air is turned off to the 3-way gate as SbyC is done for the year. It appears a group was touring the facility and pushed the test button enough times to trigger the alarm. The site bio is verifying that the gate functions properly. 07/25/2013 10:16 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/07/25 10:08:24 07/25/2013 10:16 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/07/25 10:08:18 07/25/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/07/25 06:09:26 07/25/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/07/25 06:06:58 07/25/2013 08:51 Dean_Bal As of 0700 on Thursday, 25 July, B2J is in "Modified Sampling Mode" due to river temperatures reaching 70.0F. Sampling will take place every other day as per the Fish Passage Plan operation protocols until the daily average drops to 69.5 F. Sample and bypass mode will occur on alternating 24 hours periods (0700-0700). This means the upstream switchgate will be moved (change state) at 0700 daily. Schedule for "Modified Sampling Mode" for the next fourteen days: 0700 25 July-0700 26 July: Bypass Mode 0700 26 July-0700 27 July: Sample Mode 0700 27 July-0700 28 July: Bypass Mode 0700 28 July-0700 29 July: Sample Mode 0700 29 July-0700 30 July: Bypass Mode 0700 30 July-0700 31 July: Sample Mode 0700 31 July-0700 1 Aug: Bypass Mode 0700 1 Aug-0700 2 Aug: Sample Mode 0700 2 Aug-0700 3 Aug: Bypass Mode 0700 3 Aug-0700 4 Aug: Sample Mode 0700 4 Aug-0700 5 Aug: Bypass Mode 0700 5 Aug-0700 6 Aug: Sample Mode 0700 6 Aug-0700 7 Aug: Bypass Mode 0700 7 Aug-0700 8 Aug: Sample Mode Again, Modified Sampling Mode would return to Normal Sample mode when daily average river temperatures drop to 69.5F so the above schedule could change if a return-to-normal sampling is achieved. Full flow PIT tag interrogation remains unaffected. 07/23/2013 06:47 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Alarms will be investigated during the next site GMC.. Error: 02: Noise Level High. 02: Virtual Tag Test Failed. 07/22/2013 06:09 scottl User: scottl. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: Alarms will be addressed on the next site visit scheduled for this week. Error: 02: Noise Level High 07/20/2013 09:28 scottl User: scottl. Site: B2J. Antenna: 02. Comments: No comments. Message: show errors 07/19/2013 06:12 scottl User: scottl. Site: B2J. Antenna: 02. Comments: Noted. Message: show errors 07/15/2013 06:13 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted, not of concern at this time. Error: 02: Noise Level High. 07/14/2013 07:35 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be investigated during the next site visit.. Error: 02: Noise Level High. 07/09/2013 08:00 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms were caused by PTAGIS personnel during a site visit.. Error: 03: Noise Level High. 03: Reader Set To Master. 04: Reader Set To Master. 03: Sync. Input Not Present. 04: Sync. Input Not Present. 04: Tuning Capacitance Low. 04: Tuning Out Of Range. 07/08/2013 11:22 sdudek@p User: sdudek@psmfc.org. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: test test test Sebastian. Error: 02: Noise Level High. 07/08/2013 11:09 dchase PSMFC was on site to perform a GMC. The transceiver was replaced on the full flow antenna 02 as a test to see if the transceiver was causing the noise spiking that has been seen over the past few days. The system was quiet when I arrived but after discussions it was decided to replace the transceiver. No other problems were discovered during this visit. 07/08/2013 07:43 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be addressed during the next site visit.. Error: 02: Virtual Tag Test Failed. 02: Noise Level High. 07/07/2013 06:20 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: 02: Virtual Tag Test Failed. 07/07/2013 06:19 rclark User: rclark. Site: B2J. Antenna: 02. Comments: No comments. Message: show errors 07/07/2013 06:18 rclark User: rclark. Site: B2J. Antenna: 02. Comments: This will be addressed during the next site visit.. Message: show errors 07/06/2013 06:51 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: This will be checked during the next site visit.. Error: 02: Virtual Tag Test Failed 07/05/2013 06:32 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: No comments. Error: 02: Virtual Tag Test Failed. 07/05/2013 06:32 rclark User: rclark. Site: B2J. Antenna: 02. Comments: This will be checked during the next site visit.. Message: show errors 07/04/2013 06:20 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: This will be checked during the next site visit.. Error: 02: Virtual Tag Test Failed 07/03/2013 13:22 NTancret Updated M4 SbyC configurations to disable all collection protocols. SbyC is done at B2J for the season. Updated Multimon machines to use the generic map and database files. Submitted B2J13184.207 as multimon gap file. 07/03/2013 12:03 DGE_Robo DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2013/07/03 09:35:17 07/03/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/07/03 09:35:15 07/02/2013 06:08 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: Transceiver had higher than normal noise for part of the day. Will continue to monitor.. Error: 02: Virtual Tag Test Failed. 07/01/2013 11:16 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/06/30 10:42:39 07/01/2013 11:16 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/06/30 10:41:06 07/01/2013 11:16 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/06/30 10:36:57 07/01/2013 11:16 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/06/30 10:36:52 07/01/2013 06:37 rclark@b 51:ReaderReset,52:InputSyncDetect,52:ReaderReset,81:ReaderReset,82:InputSy ncDetect,82:ReaderReset,91:ReaderReset,92:InputSyncDetect,92:ReaderReset,9 3:InputSyncDetect,93:ReaderReset,A1:ReaderReset,A2:InputSyncDetect,A2:Read erReset,A3:InputSyncDetect,A3:ReaderReset,A4:InputSyncDetect,A4:ReaderRese t,E1:ReaderReset,E2:InputSyncDetect,E2:ReaderReset,F1:ReaderReset,F2:Input SyncDetect,F2:ReaderReset: power outage AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/06/30 14:57:29 AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/06/30 15:00:23 07/01/2013 06:08 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Unknown cause for this one time error. Will continue to monitor.. Error: 02: Virtual Tag Test Failed. 07/01/2013 00:04 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/06/30 15:00:23 06/30/2013 17:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/06/30 14:58:49 06/30/2013 17:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/06/30 14:57:33 06/30/2013 17:02 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/06/30 14:57:29 06/30/2013 07:11 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be investigated during the next site visit. This transceiver is reading PIT tags with high efficiency.. Error: 02: Virtual Tag Test Failed. 06/29/2013 05:59 Alan User: Alan. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be investigated during the next site visit. This transceiver is reading PIT tags with high efficiency.. Error: 02: Noise Level High. 02: Virtual Tag Test Failed. 06/27/2013 11:59 rclark Performed site GMC on 6/27/2013. All transceiver were checked for tune and adjusted as needed. Multimon PC1 is 30 seconds and PC2 is 19 seconds behind atomic time. Files on PC2 were archived. There are no problems to report. 06/27/2013 07:17 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms were the result of a tag test.. Error: 01: Noise Level High. 02: Noise Level High. 03: Noise Level High. 04: Noise Level High. 06/26/2013 07:18 Alan This morning's CEA report shows decreased efficiency in the full flow monitor as well as about twice as many detections as in the separator monitor. This due to a USACE/NOAA study to investigate shed tags. In a one-time event, 100 tags were put into the stick tags access point just upstream from the full flow at ~1500 PDT 6-25-2013. No further problems to report. 06/23/2013 07:54 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 02: Noise Level High. 06/21/2013 18:17 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: TT Replaced. Error: 52: Test Tag Failed. 06/21/2013 18:12 troy@bay 52:TestTagFailure: TT replaced yesterday during a GMC. 06/20/2013 12:47 rclark Performed site GMC on 6/20/2013. All transceivers were checked for tune and adjusted as needed. The timer tag was replaced on coil 52. The ignor.dat file on the Multimon PCs and the corresponding file on the M4 platform was updated and uploaded to the server. B2J13171 was submitted as a gap file. Files on Multimon PC2 were archived. Multimon PC1 is 20 seconds behind and PC2 is within 1 second of atomic time. There are no problems to report. 06/20/2013 06:29 Troy@bay 52:TestTagFailure: This should be addressed today during a GMC. 06/19/2013 06:52 thumphre User: thumphrey. Site: B2J. Antenna Group Name: SAMPLE ROOM. Antenna: 52. Comments: See previous. Error: 52: Test Tag Failed. 06/19/2013 06:51 thumphre User: thumphrey. Site: B2J. Antenna: 52. Comments: It appears the TT has failed on this transceiver and will be replaced on the next site visit.. Message: show errors 06/19/2013 06:51 Troy@bay 52:TestTagFailure: Cleared on new TASS. 06/19/2013 06:50 thumphre User: thumphrey. Site: B2J. Antenna: 52. Comments: It appears the TT has failed on this transceiver and will be replaced on the next site visit.. Message: show errors 06/18/2013 07:58 alan@bay 52:TestTagFailure: It appears as though the TT has failed. The transceiver is in tune and reading PIT tags well. The TT will be replaced during the next site visit. 06/18/2013 07:57 NTancret Updated M4 and Multimon machines to use B2J13169.DB as SbyC lookup file. Submitted B2J13169.206 as Multimon gap file. 06/17/2013 06:51 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: 02: Noise Level High. 02: Virtual Tag Test Failed. 06/16/2013 08:03 dchase User: dchase. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: clearing TASS.. Error: 02: Noise Level High. 06/13/2013 12:16 rclark Performed site GMC on 6/13/2013. All transceivers were checked for tune and adjusted as needed. Multimon PC1 is 10 seconds and PC2 is 19 seconds behind atomic time. Files on PC2 were archived. There are no problems to report. 06/07/2013 03:05 DGE_Robo DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2013/06/07 01:11:54 06/07/2013 03:05 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/06/07 01:11:54 06/07/2013 03:05 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/06/07 01:11:54 06/07/2013 03:05 DGE_Robo DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2013/06/07 01:11:54 06/07/2013 03:05 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/06/07 01:11:54 06/07/2013 03:05 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/06/07 01:11:54 06/06/2013 11:43 rclark Performed site GMC on 6/6/2013. All transceivers were checked for tune and adjusted as needed. 20 sticks were thrown at the separator. All sticks were read on all coils and diverted properly. Multimon PC1 was 47 seconds and PC2 was 54 seconds behind atomic time. Adjusted clocks to within 1 second of atomic time. Submitted B2J13157.206 as a patch file. Files on PC2 were archived. There are no problems to report. 05/31/2013 11:23 rclark Performed site GMC on 5/31/2013. All transceivers were checked for tune and adjusted as needed. Multimon PC1 is 39 seconds and PC2 was 59 seconds behind atomic time. Adjusted PC2 to within 1 second of PC1. Files on PC2 were archived. There are no problems to report. 05/30/2013 15:03 NTancret Updated M4 and Multimon lookup files to include additional tag code for AC-70. Uploaded B2J13150.207 as Multimon gap file. 05/30/2013 07:26 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: B2J: Noise Level High. 05/28/2013 09:56 meagain User: meagain. Site: B2J. Antenna: 01. Comments: No comments. Message: show errors 05/28/2013 09:56 meagain User: meagain. Site: B2J. Antenna: 01. Comments: No comments. Message: do not show errors 05/28/2013 09:52 NTancret Updated M4 and Multimon machines to use B2J13148.DB as the lookup file. This file contains additional tag codes for AC-70. Submitted B2J13148.205 as Multimon gap file. 05/28/2013 09:48 meagain User: meagain. Site: B2J. Antenna: 02. Comments: No comments. Message: show errors 05/28/2013 09:46 meagain User: meagain. Site: B2J. Antenna: 01. Comments: No comments. Message: show errors 05/28/2013 09:45 meagain User: meagain. Site: B2J. Antenna: 02. Comments: test. Message: do not show errors 05/28/2013 09:44 meagain User: meagain. Site: B2J. Antenna: 01. Comments: test. Message: do not show errors 05/28/2013 09:43 meagain User: meagain. Site: B2J. Antenna: 01. Comments: test. Message: show errors 05/27/2013 08:26 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 03: Noise Level High. 05/23/2013 12:08 Roger Performed site GMC on 5/23/2013. All transceivers were checked for tune and adjusted as needed. Threw 20 stick at the separator gate. All stick were read on all coils except for A2, which read 16 of 20. All sticks were diverted properly. Multimon PC1 is 26 seconds behind and PC2 was 51 seconds behind atomic time. Adjusted PC2 to within 1 second of PC1. Files on PC2 were archived. There are no problems to report. 05/20/2013 11:08 thumphre At the site to check the SbyC gate. It was test fired several times while I watch to make sure the flapper below the gate was working properly. The gate appears to be operating smoothly. 20 sticks were thrown on the gate, 10 left and 10 right. All were read properly and diverted properly. Discovered that TT's show up in the M4 stick tag report as sticks as there were 21 sticks on A1 but only 20 on the rest of the transceivers. Verified the extra stick was actually the TT. Inspected the FF level switch, there are spider webs but nothing directly below the sensor so I did not remove the webs. No problems to report. 05/18/2013 06:33 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Transceiver was retuned on 5/17/2013.. Error: 03: Virtual Tag Test Failed. 05/17/2013 15:11 NTancret Updated M4 and Multimon machine to use B2J13137.DB as lookup file. This file contains additional tag codes for AC-70. Uploaded B2J13137.208 as gap file for Multimon. 05/17/2013 13:34 sdudek@p User: sdudek@psmfc.org. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: test. Error: B2J: Virtual Tag Test Failed. B2J: Noise Level High. 05/17/2013 11:10 Roger Performed site GMC on 5/17/2013. All transceivers were checked for tune and adjusted as needed. Multimon PC1 is 20 seconds and PC2 is 37 seconds behind atomic time. Files on PC2 were archived. There are no problems to report. 05/17/2013 06:46 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This alarm will be addressed today during a site GMC.. Error: 03: Virtual Tag Test Failed. 05/16/2013 06:25 rclark@b 93:InputSyncDetect,93:ReaderReset: Random reader reset. Clearing TASS. 05/16/2013 06:05 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: This will be checked during the next site visit.. Error: 03: Virtual Tag Test Failed. 05/15/2013 06:04 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms will be addressed during the next site visit.. Error: 02: Virtual Tag Test Failed. 03: Virtual Tag Test Failed. 03: Noise Level High. 05/14/2013 06:02 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: An adult Steelhead was in the antenna field. Error: 03: Noise Level High. 03: Virtual Tag Test Failed. 05/13/2013 09:20 NTancret Updated M4 and Multimon configurations to remove AC 64 and alter collection schedule for ACs 55, 56 and 70. New M4 configuration files are: B2J-2013-133-P-0934585611 and B2J-2013-133-S-0933464372. New Multimon map file is B2J13133.MAP. The lookup file is now B2J13133.DB. Uploaded B2J13133.205 as gap file for Multimon. 05/13/2013 06:03 rclark User: rclark. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: The noise level high will be addressed during the next site visit.. Error: 03: Memory Low. 04: Memory Low. 03: Noise Level High. 03: Virtual Tag Test Failed. 05/11/2013 09:49 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: 01: Memory Low. 02: Memory Low. 04: Memory Low. 03: Memory Low. 05/10/2013 14:05 NTancret Updated M4 and Multimon machines to use B2J13130.DB as the lookup file. This file contains additional tag codes for AC-70. 05/09/2013 06:18 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: No comments. Error: 03: Noise Level High. 01: Virtual Tag Test Failed. 01: Noise Level High. 01: Memory Low. 02: Memory Low. 05/07/2013 12:14 Troy At the site to check on the 3-way gate. Fired in each direction and watched the gate. It appears to be operating smoothly. Threw sticks on the gate, all were read and diverted properly. No problems to report. 05/07/2013 06:51 Alan Century tel reports a 20 state outage that is affecting Bonneville, John Day and Prosser. Their service rep says they have no estimated time of return to service- 05/04/2013 07:25 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing TASS. A site GMC was performed yesterday.. Error: 03: Virtual Tag Test Failed. 03: Noise Level High. 05/03/2013 15:54 NTancret Updated M4 configuration and Multimon map file to include AC-70 (D. Marsh's survival group). Both platforms are using B2J13123.DB as the lookup file. Submitted B2J13123.211 as gap file for Multimon machines. 05/03/2013 11:10 Roger Performed site GMC on 5/3/2013. All transceivers were checked for tune and adjusted as needed. Multimon PC1 was 42 seconds and PC2 was 46 seconds behind atomic time. Adjusted clocks to within 1 second of atomic time. B2J13123.206 was submitted as a gap file. Files on PC2 were archived. Site Bio didn't want stick test performed during this visit. There are no problems to report. 05/02/2013 06:34 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms will be addressed during the next site GMC.. Error: 03: Noise Level High. 03: Virtual Tag Test Failed. 05/01/2013 06:30 dchase User: dchase. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 01. Comments: Alarm will be investigated during the next site GMC.. Error: 01: Noise Level High. 05/01/2013 06:28 dchase User: dchase. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: These alarms were being generated by a PITtagged fish that was hanging out in the pipe by this antenna. THe fish in question has since moved on.. Error: 03: Noise Level High. 03: Virtual Tag Test Failed. 04/30/2013 06:11 dchase User: dchase. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: THis alarm will be investigated during this weeks site GMC.. Error: 03: Noise Level High. 04/29/2013 10:44 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: Cleared in old TASS.. Error: 03: Noise Level High. 04/26/2013 08:10 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Cleared on old TASS. Error: 03: Noise Level High. 04/26/2013 07:15 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 03: Noise Level High. 04: Virtual Tag Test Failed. 04/25/2013 11:41 Roger Performed site GMC on 4/25/2013. All transceivers were checked for tune and adjusted as needed. Ten 254 and ten 255 stcks were thrown at the sepeartor gate. All sticks were read on all coils and diverted properly. PC1 is 32 seconds and PC2 is 27 seconds behind atomic time. Files on PC2 were archived. There are no problems to report. 04/25/2013 08:04 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This will be investigated on the next site visit.. Error: 03: Noise Level High. 04/18/2013 10:55 Darren A site GMC was performed today 4-18-13. All transceivers were checked and adjusted for tuning, noise, and detectability. No problems were found. 04/13/2013 07:08 darren@b 04:InputSyncLost: Alarm caused by PSMFC personnel while installing 2020 transceivers. 04/11/2013 15:16 Alan No PIT tag detections occurred during the M4 upgrade on 4/11/2013. 04/11/2013 11:25 Roger Performed site GMC on 4/11/2013. All traansceivers were checked for tune and adjusted as needed. 20 sticks were thrown at the separator. All sticks were read on all coils and diverted properly. PC1 is 12 seconds and PC2 was 29 seconds behind atomic time. Adjusted PC2 within 1 second of PC1. Archived files on PC2. There are no problems to report. 04/11/2013 10:46 Troy Installed 2020's in the FF, replacing the FS1001As on 03 and 04. Updated the site configuration on both PC1 and PC2. Upgraded M4 to version 1.5.4.0. The brief data gap could be filled with with the 013 file from the S machine. 04/08/2013 06:51 PTOC_Bot The former DST rules caused the Multimon file creation intervals to be off by one hour. At 0745 PDT 4-8-2013, data collection was exited and restarted on both PCs to re-establish proper file creation intervals. Files B2J13098.102 &.202 were the last files created prior to this procedure and were submitted manually. Outstanding files on PC2 were archived. 04/05/2013 09:40 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: Antenna retune on 4/4/2013. Error: 03: Test Tag Failed. 04/05/2013 05:56 rclark@b 03:TestTagFailure: Transceiver was retuned on 4/4/2013. 04/04/2013 10:28 Roger Performed site GMC on 4/4/2013. All transceivers were checked for tune and adjusted as needed. PC1 is 3 seconds and PC2 is 6 seconds behind atomic time. Files on PC2 were archived. The site bio didn't want stick tests performed during this visit. There are no problems to report. 04/03/2013 06:23 rclark@b 03:TestTagFailure: This will be addressed during the next site visit. Transceiver is detecting tags with high efficiency. 04/02/2013 08:54 NTancret Updated M4 machines to use site configurations B2J-2013-092-P-0905319898 and B2J-2013-092-S-0904095923 and B2J13091.DB as the lookup file. Updated Multimon machines to use B2J13091.MAP and B2J13091.DB. PC1 and PC2 clocks were 36 and 33 seconds behind atomic time; they were reset to be within 1 second of each other and atomic time. Submitted B2J13092.205 as gap file. 04/02/2013 06:20 rclark@b 03:TestTagFailure: This will be checked during the next site visit. 04/02/2013 06:07 rclark User: rclark. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 03. Comments: This will be addressed during the next site visit.. Error: 03: Test Tag Failed. 04/01/2013 06:04 rclark@b 03:TestTagFailure: This transceiver is slightly out of tune. This will be addressed during the next site visit. 03/31/2013 09:58 scottl@b 03:TestTagFailure: Noted, detection efficiencies are not effected 03/30/2013 06:50 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Site GMC's will perfromed next week. Any issues will be corrected at that time.. Error: 01: Noise Level High. 01: Virtual Tag Test Failed. 02: Virtual Tag Test Failed. 03: Test Tag Failed. 03/28/2013 11:26 Roger Performed site GMC on 3/28/2013. All transceivers were checked for tune and adjusted as needed. Ten 254 and 10 255 sticks were thrown. All sticks were read on all colis and diverted properly. PC1 is 29 seconds and PC2 is 20 seconds behind atomic time. There are no problems to report. 03/28/2013 06:21 Alan Yesterday's power outage lasted from `0730 PST to ~1115 PST. The outage did not affect B2J. Data from TMP files on the BO3 (Multimon) and BO4 (MiniMon) were retrieved, given closing timestamps, and submitted to PTAGIS. Recovery of M4 data is ongoing, a separate pitevent will describe that effort. 03/27/2013 08:20 Troy Site Bio confirmed there is a power outage in progress at the AFF. The exact times it went down and comes back up will be reported tomorrow. They expect power to return later today. This power outage may affect the SMF(B2J) as far as water level is concerned. 03/26/2013 14:27 sdudek@p User: sdudek@psmfc.org. Site: B2J. Comments: . Event date: 3/26/2013 3:27:45 PM. Site activity: up 03/26/2013 14:27 sdudek@p User: sdudek@psmfc.org. Site: B2J. Comments: . Event date: 3/26/2013 3:27:13 PM. Site activity: down 03/26/2013 07:11 scottl User: scottl. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These errors have been corrected.. Error: 01: Noise Level High. 03: Test Tag Failed. 03/22/2013 09:02 DGE_Robo DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2013/03/22 06:39:52 03/22/2013 09:02 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/03/22 06:39:50 03/21/2013 10:10 Scott_Li Re-directed the Network Time Protocol to synchronize to Pool.NTP.org Set task scheduler to trigger the time synchronization process every day and re-occur every hour indefinitely. Also turned on the history logging within task scheduler. This should keep the two M4 PC's in perfect time with each other and the atomic clock. 03/21/2013 06:07 rclark@b 03:TestTagFailure: Transceiver was retuned on 3/20/2013. 03/19/2013 18:02 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/03/19 15:15:40 03/19/2013 15:02 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/03/19 13:29:29 03/17/2013 07:56 troy@bay 03:TestTagFailure: Cleared using new TASS 03/17/2013 07:56 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This alarm will be addressed on the next site visit.. Error: 03: Test Tag Failed. 03/16/2013 07:56 troy@bay 03:TestTagFailure: See previous posting. 03/15/2013 13:26 Troy Lab testing was conducted on the a copy of the site PLC and HMI programs. I forgot to remove the mail recipents on the lab copies so some bogus emails have been sent out. JDJ is not watered up and the PriBypass ect at B2J did not change state. Sorry for the confusion 03/15/2013 07:58 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: TT pot may need adjustment.. Error: 03: Test Tag Failed. 01: Noise Level High. 03/15/2013 06:37 Troy@bay 03:TestTagFailure: The TT pot may need to be adjusted, transceiver is reading fish at a high efficiency. 03/14/2013 07:01 Troy@bay 03:TestTagFailure: Cleared using new TASS. 03/14/2013 07:01 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms were addressed yesterday during a GMC. Error: 01: Antenna Current Low. 03: Test Tag Failed. 04: Test Tag Failed. 03/13/2013 15:08 rclark@b 03:TestTagFailure,04:TestTagFailure: Transceivers were retuned on 3/13/2013. 03/13/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/03/13 11:31:59 03/13/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/03/13 11:26:04 03/13/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'ON' to 'OFF' at 2013/03/13 11:26:02 03/13/2013 12:03 DGE_Robo SByC_Enable (SBC) changed from 'OFF' to 'ON' at 2013/03/13 11:25:58 03/13/2013 11:40 Roger Performed site GMC on 3/13/2013. All transceivers were checked for tune and adjusted as needed. PC1 is 9 seconds and PC2 is 19 seconds behind atomic time. Files on PC2 were archived. Threw 10 254 and 10 255 sticks. All sticks were read on all transceivers and diverted properly. There are no problems to report. 03/13/2013 06:35 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms will be addressed during the next site visit.. Error: 04: Test Tag Failed. 01: Antenna Current Low. 03: Test Tag Failed. 03/12/2013 13:18 Dean_Bal B2J Smolt monitoring activities for the 2013 season, including 24 hour sample collections and PIT tag interrogation (to sample flumes) began at 1000 on Tuesday, 12 March. 03/12/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/03/12 08:52:21 03/12/2013 09:03 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/03/12 08:00:00 03/12/2013 09:02 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/03/12 07:59:37 03/12/2013 09:02 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/03/12 07:44:35 03/12/2013 08:50 Troy Site put watere over the separator at 0900 today. 03/12/2013 08:49 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Site is now watered up, clearing TASS.. Error: F2: Test Tag Failed. 03/12/2013 08:49 thumphre User: thumphrey. Site: B2J. Comments: Water is now over the seperator.. Event date: 3/12/2013 9:00:00 AM. 03/12/2013 06:38 Troy@bay 03:TestTagFailure,04:TestTagFailure: Cleared using new TASS 03/12/2013 06:37 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Something has caused the phase to shift slightly(possibly water level). PSMFC will investigate on the next site visit.. Error: 04: Test Tag Failed. 01: Antenna Current Low. 03: Test Tag Failed. 03/11/2013 06:45 Troy@bay 04:TestTagFailure: Cleared using new TASS. 03/11/2013 06:45 thumphre User: thumphrey. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: These alarms will be addressed on the next site visit.. Error: 03: Test Tag Failed. 04: Test Tag Failed. 03/10/2013 07:24 darren@b 03:TestTagFailure: Alarm will be addressed during the next site visit. 03/09/2013 08:44 darren@b 03:TestTagFailure,04:TestTagFailure: Alarms cleared thru the new web based TASS. 03/09/2013 08:39 dchase User: dchase. Site: B2J. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: All alarms will be addressed during the next site visit.. Error: 03: Excessive noise level. 03: Test Tag Failed. 04: Test Tag Failed. 01: Noise Level High. 03/08/2013 08:07 rclark User: rclark. Site: B2J. Comments: Full flow watered up 03/08/2013 07:48 rclark@b 51:ReaderReset,52:InputSyncDetect,52:ReaderReset,81:ReaderReset,82:InputSy ncDetect,82:ReaderReset,91:ReaderReset,92:InputSyncDetect,92:ReaderReset,9 3:InputSyncDetect,93:ReaderReset,A1:ReaderReset,A2:InputSyncDetect,A2:Read erReset,A3:InputSyncDetect,A3:ReaderReset,A4:InputSyncDetect,A4:ReaderRese t,E1:ReaderReset,E2:InputSyncDetect,E2:ReaderReset,F1:ReaderReset,F2:Input SyncDetect,F2:ReaderReset,F2:TestTagFailure: AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/03/07 13:41:25 AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/03/07 13:43:40 03/08/2013 07:45 rclark@b 03:TestTagFailure: Transceiver is out of tune. This will be addressed during the next site visit. 03/07/2013 15:05 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/03/07 13:43:40 03/07/2013 15:04 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/03/07 13:41:25 03/07/2013 15:04 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/03/07 12:10:53 03/07/2013 15:04 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/03/07 12:04:02 03/07/2013 15:04 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/03/07 12:00:02 03/07/2013 13:30 Troy A flag was mounted to the drum of the 3 way gate. This flag engages sensor so that it can be determined that a gate is stuck or not operating. Several tests were conducted, indicator lights were installed. No problems to report at this time. Any gate trouble alarms from here on out should be investigated as real alarms, testing is complete. 03/07/2013 12:05 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/03/07 11:59:47 03/07/2013 12:05 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/03/07 11:58:29 03/07/2013 12:05 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/03/07 11:58:29 03/07/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/03/07 11:58:28 03/07/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/03/07 11:58:28 03/07/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/03/07 11:58:26 03/07/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/03/07 11:58:26 03/07/2013 11:16 sdudek@p User: sdudek@psmfc.org. Site: B2J. Comments: going down 03/07/2013 07:32 darren@b 03:TestTagFailure,04:TestTagFailure: Clearing TASS. The Full flow pipe watered up yesterday and these systems have since retuned themselves. 03/06/2013 16:23 sdudek@p User: sdudek@psmfc.org. Site: B2J. Antenna Group Name: FULL FLOW BYPASS. Antenna: 02. Comments: testing Sebastian. Error: 02: Antenna Current Low 03/06/2013 16:12 sdudek@p testing legacy system for Sub site: B2J-FF Antenna group name: FULL FLOW BYPASS Antenna: 02 TASS event 03/06/2013 15:07 Scott_Li On all M4 SByC PC's, set the time Sync process to run every 1 hrs rather than the default of 1 time per week. This is an attempt to keep the M4 clustering as synchronized as possible. 03/05/2013 07:13 darren@b 03:TestTagFailure,04:TestTagFailure: Clearing TASS. Site is currently de- watered. 03/01/2013 07:13 scottl@b 03:TestTagFailure,04:TestTagFailure,51:ReaderReset,52:InputSyncDetect,52:R eaderReset,81:ReaderReset,82:InputSyncDetect,82:ReaderReset,91:ReaderReset ,92:InputSyncDetect,92:ReaderReset,93:InputSyncDetect,93:ReaderReset,A1:Re aderReset,A2:InputSyncDetect,A2:ReaderReset,A3:InputSyncDetect,A3:ReaderRe set,A4:InputSyncDetect,A4:ReaderReset,E1:ReaderReset,E2:InputSyncDetect,E2 :ReaderReset,F1:ReaderReset,F2:InputSyncDetect,F2:ReaderReset: Power outage 2013/02/28 09:41:14 --> set to 'ON' 2013/02/28 09:38:49 --> set to 'OFF' 02/28/2013 12:04 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/02/28 09:41:14 02/28/2013 12:04 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/02/28 09:38:49 02/22/2013 07:17 rclark@b 03:TestTagFailure,04:TestTagFailure,51:ReaderReset,52:InputSyncDetect,52:R eaderReset,81:ReaderReset,82:InputSyncDetect,82:ReaderReset,91:ReaderReset ,92:InputSyncDetect,92:ReaderReset,93:InputSyncDetect,93:ReaderReset,A1:Re aderReset,A2:InputSyncDetect,A2:ReaderReset,A3:InputSyncDetect,A3:ReaderRe set,A4:InputSyncDetect,A4:ReaderReset,E1:ReaderReset,E2:InputSyncDetect,E2 :ReaderReset,F1:ReaderReset,F2:InputSyncDetect,F2:ReaderReset: Caused by power outage. AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/02/21 12:08:51 AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/02/21 12:11:13 02/21/2013 15:04 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/02/21 12:11:13 02/21/2013 15:04 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/02/21 12:08:51 02/15/2013 08:27 Troy@bay 03:TestTagFailure,04:TestTagFailure: FF is de-watered, clearing TASS. 02/13/2013 03:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/02/13 01:34:49 02/06/2013 12:04 DGE_Robo SampleGateBypass (SBypass) changed from 'OFF' to 'ON' at 2013/02/06 11:44:25 02/06/2013 12:04 DGE_Robo SampleGateBypass (SBypass) changed from 'ON' to 'OFF' at 2013/02/06 11:36:24 02/06/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/02/06 11:36:24 02/06/2013 12:04 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/02/06 10:40:21 02/06/2013 12:04 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/02/06 10:38:21 02/06/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/02/06 10:19:36 02/06/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/02/06 10:19:35 02/06/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at 2013/02/06 10:19:27 02/06/2013 12:04 DGE_Robo PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at 2013/02/06 10:19:26 02/05/2013 08:06 Troy@bay 03:TestTagFailure,04:TestTagFailure: FF is de-watered, clearing TASS. 02/03/2013 07:37 troy@bay 03:TestTagFailure,04:TestTagFailure: Site down, clearing TASS. 02/02/2013 06:34 troy@bay 03:TestTagFailure,04:TestTagFailure: FF down,clearing TASS. 02/01/2013 07:33 Troy@bay 03:TestTagFailure,04:TestTagFailure,52:InputSyncDetect,52:ReaderReset: Site de-watered, clearing TASS. 01/31/2013 07:34 Troy@bay 03:TestTagFailure,04:TestTagFailure: FF is de-watered, clearing TASS. 01/29/2013 07:19 Troy@bay 03:TestTagFailure: FF is de-watered, clearing TASS. 01/28/2013 07:16 Troy@bay 03:TestTagFailure,A1:ReaderReset,A2:InputSyncDetect,A2:InputSyncLost,F2:Te stTagFailure: Site down, clearing TASS. 01/12/2013 08:21 rclark@b 04:TestTagFailure: The full flow is dewatered. 01/11/2013 07:13 rclark@b 04:TestTagFailure: The full flow is dewaterd. 01/10/2013 07:20 rclark@b 03:TestTagFailure,04:TestTagFailure: The full flow is dewatered. 01/09/2013 07:02 rclark@b 03:TestTagFailure,04:TestTagFailure,51:ReaderReset,52:InputSyncDetect,52:R eaderReset,81:ReaderReset,82:InputSyncDetect,82:ReaderReset,91:ReaderReset ,92:InputSyncDetect,92:ReaderReset,93:InputSyncDetect,93:ReaderReset,A1:Re aderReset,A2:InputSyncDetect,A2:ReaderReset,A3:InputSyncDetect,A3:ReaderRe set,A4:InputSyncDetect,A4:ReaderReset,E1:ReaderReset,E2:InputSyncDetect,E2 :ReaderReset,F1:ReaderReset,F2:InputSyncDetect,F2:ReaderReset: Caused by short power outage. AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/01/08 09:57:47 AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/01/08 10:06:19 01/08/2013 12:03 DGE_Robo AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2013/01/08 10:06:19 01/08/2013 12:03 DGE_Robo AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2013/01/08 09:57:47 01/08/2013 07:24 rclark@b 03:TestTagFailure,04:TestTagFailure: The full flow is dewatered. 01/06/2013 07:38 troy@bay 03:InputSyncDetect,03:InputSyncLost,04:InputSyncDetect,04:InputSyncLost: FF is de-watered,clearing TASS. 01/03/2013 08:41 Scott_Li Sites were upgraded to M4 ver. 1.5.1.0 per instructions listed on Basecamp. 01/02/2013 00:00 PTOC_Bot Annual log file initiation for B2J #### End of Event Log for B2J ###