EVENT LOG FOR SITE BGM The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/12/2010 14:51 Courtney 10/6/10 - BGM main & Canal bypass - Prior to this message the MUX and computer times were following Pacific Daylight Time. Clocks were "reset" to Pacific Standard Time on 10/6/10. 10/6/10 - Canal bypass (FB) - Changed hex id to FB. Updated Minimon to 1.5.4. Updated country code registry to read and store 384 prefix tag codes. 10/2/10 at 8:00 - Canal bypass (F1, F2 and FB antennas) - Canal opened, water running through. 09/14/2010 14:04 Courtney 9/14/10 - BGM main - Prior to this message the MUX and computer times were following Pacific Daylight Time . Clocks were "reset" to Pacific Standard Time on 9/14/10. 09/08/2010 14:43 Courtney 8/31/10 - Updated MUX firmware 2.1; Minimon to 1.5.3; Ran patch to fix Minimon country code/registry to correctly report PITtags with 384 prefix. 07/22/2010 16:29 Courtney 7/9/10 at 12:00 - BGM main (Antenna # 1 and # 2) and Fish Bypass (FB). The canal gates were closed and Ant 1, 2 and FB are no longer collecting data. Ant 1 & 2 were left sequenced in but water no longer flows through the antennas. The FB antenna computer/fs1001a was shut off. The canal will remain dewatered until October. Antennas 03 and 04 in the main channel are still active and have water flowing through them. 07/08/2010 13:42 Courtney 6/3/10 at 04:15AM to 6/29/10 at at 1:00PM - Burlingame Dam (Ant # 5 slot antenna) was unplugged. No data were collected at this time. 6/9/10 at 00:00 to 6/15/10 at 17:13 - Fish bypass Canal site - Power problems permitted the computer from creating interrogation files. The buffer was downloaded and there were no detections during this time period. BGM10166.ALL was submitted to account for this file gap. 04/23/2010 14:45 Courtney 4/13/10 at 00:01 to 4/19/10 at 09:14 - BGM Fish bypass site Computer shut down at site. Buffer was checked and detections were reported in Interrogation file BGM10111.ALL. There was no time or date stamp with the detections due to the transceiver type so the middle date/time was chosen as the detection time. 04/09/2010 15:37 Courtney 4/6/10 at 00:01 to 4/7/10 at 10:37 - BGM Canal / Fish bypass site- Computer shut down at site. Buffer was checked and detections were reported in Interrogation file BGM10098.ALL. There was no time or date stamp with the detections due to the transceiver type so the middle date/time was chosen as the detection time. 04/09/2010 15:22 Courtney 4/6/10 at 00:01 to 4/7/10 at 10:17 - BGM mainsite - Computer shut down at site. Buffer was checked and detections were reported in Interrogation file BGM10097.ALL. File was submitted to account for data file gap. 04/05/2010 08:27 Courtney 3/1/10 at 12:50 to 3/8/10 at 18:05 - Canal reopened. Computer turned on at the canal exit but the fs1001a transceiver was not, so no detection data were collected. The interrogation files for the canal exit are emtpy for this time period. 01/19/2010 12:56 Courtney 1/9/2010 - Computer shut down for bypass antenna (FB); no water in the canal. F1 and F2 left sequenced in. 12/7/09 - Canal was shut down to 4% flow. Canal closed on 12/20 and fish salvaged on 12/21/09. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for BGM #### End of Event Log for BGM ###