EVENT LOG FOR SITE BGM The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 01/11/2013 16:25 Nicole Ryan sends the following information: Canal operations are as follows: Canal is watered in early March, dewatered when flows drop below 18 cfs (usually in July/August), and rewatered again around October 1st. The canal is shut down for the winter after irrigation requirements have been met or cold weather causes canal to freeze. During times of shutdown, and after fish salvages have been completed, tags should not be detected on coils F1 and F2 (headgate antennas). The bypass antenna (coil FB) is located downstream of the fish bypass screen area and there is potential for tags to be interrogated when fish wander up the bypass channel during canal shutdown. 03/26/2012 18:45 Sequenced out antenna F1 due to rogue PIT tag shed near antenna; causing buffer to fill up (3D9.1C2CE7E4C2) 11/14/2012 00:00 to 11/28/12 14:09 No data collected. By pass (coil FB) down because someone or something turned battery backup off. 01/01/2012 00:00 PTOC_Bot Annual log file initiation for BGM #### End of Event Log for BGM ###