1994 Event Log BVJ -- Bonneville Juvenile Sub-sample ==================================================== 05/20/94 carter and i went to bonneville in june to check the detection facility and to pick up observation files. we noticed at that time that the laptop running the tunnel program was unreliable: rebooting it meant that the settings were lost and trying to reset them was hard. the date was not properly set and the detection files all got stamped with the wrong dates: i went through each file and reset them by hand (with a few errors i need to fix). the nmfs people called us to say that the machine was down (July 11) we lost data from june 25 through july 12. i went out there on july 12 with a new machine but was unable to set it up for the modem to work. i returned on july 15 with karl ross from biomark. karl loaded additional software and reconfigured the plug-in. now we can call in for our observation files from here. the laptop appears to running fine and the downloads are going well. we don't anticipate any further complications in the near future for bonneville. jen 6/24/94 13:54 Rick Martinson called from Bonneville. The BVJ computer time stamp is 2/2/88 12:54 as of this time (this is the correct pacific standard time). Rick will attempt to reset the date. -- Stein -- 04/18/94 PIT Tag equipment turned on 4/8/94 ===============------ EOF BVJ ---===================