EVENT LOG FOR SITE CFF Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 01/01/2012 08:39 rclark@b 01:VTTFailed: Noted. 12/29/2011 07:10 Rclark@b 01:VTTFailed: Noted. 12/21/2011 08:06 scottl@b 01:VTTFailed: Noted 12/20/2011 07:43 alan@bay 01:VTTFailed: Noted 12/19/2011 07:10 scottl@b 01:VTTFailed: Noted 12/18/2011 08:42 alan@bay 01:VTTFailed: Noted. 12/17/2011 09:45 alan@bay 01:VTTFailed: Noted. 12/16/2011 07:24 darren@b 01:VTTFailed: PSMFC is aware of this alarm. The site has some issues with noise elevation but the system will detect PIT tags with a high degree of efficiency. We will monitor this situation but the site may not be accessible until spring. 12/15/2011 07:41 Troy@bay 01:VTTFailed: Noted 12/14/2011 07:55 alan@bay 01:VTTFailed: This will be investigated during the next site visit. 12/13/2011 08:22 alan@bay 01:VTTFailed: This will be investigated during the next site visit. 12/12/2011 08:02 alan@bay 01:VTTFailed: This will be investigated during the next site visit. 12/11/2011 08:35 darren@b 01:VTTFailed: Alarm will be investigated if possible. The site has some noise issues with one of the cameras still but we should be able to detect PITtags when present with high efficiency. 12/08/2011 10:56 Troy Changed the transaction timeout time for Network 2 from 3000 ms to 3100 ms to see if this helps reduce the number of time the Redlion DSP looses comm's with the PLC. 12/08/2011 07:10 darren@b 01:VTTFailed: Clearing TASS 12/07/2011 07:44 darren@b 01:VTTFailed: clearing TASS. 11/27/2011 12:56 scottl@b 01:VTTFailed: Noted 11/23/2011 16:32 scottl The satellite feed, NW1 amd 2 are extremely slow and almost unusable. Managed to push the delinquent files but any other remote administration required is not possible. Will monitor 11/23/2011 13:33 scottl@b 01:NoSync,01:RdrToMaster,02:NoSync,02:RdrToMaster: Noted, also had re reboot PC1 in order to clear the processes for successful upload cycle 11/21/2011 08:46 Scott_Li The site PC was found to be building one large file rather than changing files at the scheduled intervals. Manually pushed the 324.E1 files to PTAGIS. This issue has been previously noted and is believed to be somewhat related to the satellite data feed. 11/18/2011 07:32 darren@b 01:NoSync,01:RdrToMaster,02:NoSync,02:RdrToMaster: Alarms were generated by PSMFC staff during site installations.PSMFC was on site yesterday 11- 17-11 to install some AC line filters for transceivers. 11/17/2011 07:10 scottl@b 01:NoSync,01:RdrToMaster,01:VTTFailed,02:NoSync,02:RdrToMaster,02:VTTFaile d,03:AntCurrentLow,03:NoAntenna,03:TunCapHigh,03:TunRangeOut,03:TuningFail ed,03:VTTFailed: Alarms were generated by PTOC 11/16/2011 07:04 scottl@b 01:AntCurrentLow,01:NoAntenna,01:NoSync,01:RdrToMaster,01:TunCapHigh,01:Tu nCapLow,01:TunRangeOut,01:TuningFailed,01:VTTFailed,02:NoSync,02:RdrToMast er,02:VTTFailed,03:VTTFailed: Alarms were generated by PTOC 11/15/2011 07:09 scottl@b 01:NoSync,01:RdrToMaster,01:VTTFailed,02:NoSync,02:RdrToMaster,02:VTTFaile d,03:NoSync,03:RdrToMaster,03:VTTFailed: Issue will be addressed today 11/13/2011 08:15 Troy@bay 01:NoSync,01:RdrToMaster,01:VTTFailed,02:NoSync,02:RdrToMaster,02:VTTFaile d,03:VTTFailed: These alarms will be investigate 11/14/2011. 11/12/2011 07:10 Troy@bay 01:NoSync,01:RdrToMaster,01:VTTFailed,02:NoSync,02:RdrToMaster,02:VTTFaile d,03:VTTFailed: PSMFC is looking into this issue. A trip to the site is required, weather permitting. 11/11/2011 08:31 Troy@bay 01:VTTFailed,02:VTTFailed,03:VTTFailed: Attempts have been made to clear this up but it looks like a power cycle will be required. 11/11/2011 08:29 Troy All transceivers are in a state of high noise. PSMFC switched the sync order earlier this week as we are trying to pin point where the problem is. Today the transceivers were remotely put into standby then scan in an attempt to clear the noise that appears to be related to the sync. This was unsuccessful. PSMFC will continue to tackle this problem until it is resolved. 11/10/2011 08:08 Troy@bay 01:NoSync,01:RdrToMaster,01:VTTFailed,02:NoSync,02:RdrToMaster,02:VTTFaile d,03:NoSync,03:RdrToMaster,03:VTTFailed: This site is still under construction and a majority of these alarms were caused by PSMFC personnel searching for noise problems. 11/09/2011 07:45 Troy@bay 01:VTTFailed,02:VTTFailed: See previous ack 11/09/2011 07:17 Troy@bay 01:VTTFailed,02:VTTFailed: This will be investigated today weather permitting. 11/08/2011 07:21 Troy@bay 01:VTTFailed,02:VTTFailed,03:VTTFailed: This site is still in the construction stage. 11/07/2011 07:26 Troy@bay 01:VTTFailed,02:VTTFailed,03:NoSync,03:RdrToMaster,03:VTTFailed: PSMFC will be on site today to investigate what is causing the high noise. 11/06/2011 08:30 alan@bay 01:VTTFailed,02:VTTFailed: Noted 11/04/2011 07:01 Alan No data exist to fill the 01:59:00 gap on 11/3/2011. The platform was down for electrical work onsite. 11/04/2011 06:12 darren@b 01:VTTFailed,03:NoSync,03:RdrToMaster: Alarms were generated by PSMFC personnel while performing grounding and filtering test for the VFD noise. 11/03/2011 07:38 alan@bay 02:MemFull,02:MemLow,02:VTTFailed,03:NoSync,03:RdrToMaster: Known issue, under investigation. 10/31/2011 07:01 alan@bay 01:VTTFailed,02:TunCapLow,02:TunRangeOut,02:TuningFailed,02:VTTFailed,03:N oSync,03:RdrToMaster,03:VTTFailed: Project is still not complete. 10/24/2011 06:34 darren@b 01:VTTFailed,02:VTTFailed: Site is reporting files but the project is still not complete. There is still work being performed on the electrical for the building. 10/23/2011 06:42 rclark@b 01:VTTFailed,02:VTTFailed,03:VTTFailed: This is caused by VFD noise. PSMFC is working with the electrical contractor to resolve this issue. 10/22/2011 07:33 rclark@b 01:VTTFailed,02:VTTFailed,03:VTTFailed: Caused by VFD noise. 10/21/2011 06:15 Rclark@b 01:VTTFailed,02:VTTFailed,03:VTTFailed: High noise level due to unresolved issues with VFDs. 10/21/2011 06:14 Rclark@b 01:NoSync,01:RdrToMaster: Reader 01 was in secondary master mode. 10/19/2011 08:41 Troy The patch file CFF11292.F2 was manualy pushed to cover the gap created while PC1 was off line for PIT Tag room construction. 10/18/2011 12:49 scottl The site data collection platform configuration has been completed and is recieving information from the transceivers. Site data submission to the PTAGIS database has commenced starting with data file CFF11291.E1. The PIT tag room still has some work left to be done but should be completed by weeks end. 09/05/2011 13:04 doug@bay TASS has been configured to process FS2020 messages from CFF. Awating arrival of first actual interrogation file. 09/05/2011 13:02 doug@bay 03:TunCapHigh,03:TunRangeOut,03:TuningFailed,03:VTTFailed: This is a test, using mock data in TASS CFF.archive. -Doug- 09/05/2011 12:59 doug@bay 03:TunCapHigh,03:TunRangeOut,03:TuningFailed,03:VTTFailed: This is a test. 09/05/2011 12:58 doug@bay 03:TunCapHigh,03:TunRangeOut,03:TuningFailed,03:VTTFailed: This is a test. ####End of Event Log for CFF###