EVENT LOG FOR SITE CHP The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 01/11/2013 15:56 Nicole Ben sends the following information: CHP was installed and tested on 4/16/12. The system consisted of two, 3' diameter antennas affixed to a rolled sheet of polycarbonate extending out from the hatchery outfall into the Chiwawa River. The antennas were powered by Allflex OEM 310 reader boards. Data from each antenna was stored on an Acumen DataBridge. A 6 VDC battery bank powered the detection system. The volitional release began on 4/17/12 at 13:00, and any tags detected prior are run of river as the antenna is in the Chiwawa river. The volitional release ended on 5/01/12. The detection system was fully operational for the duration of the volitional release. All tags detected during the volitional release are contained in the file CHP12122.ALL The forced release began on 5/01/12 at 10:30 and the ponds were cleared by the end of the day. The detection system, located at the outfall of the facility, continued to detect tags until 11:29 on 5/02/12. The detection system was fully operational for the duration of the forced release, although it is likely that the detection system operated at a lower efficiency during the forced release due to numerous tags passing through the antenna fields simultaneously. All tags detected during the forced release are contained in the file CHP12123.ALL 01/01/2012 00:00 PTOC_Bot Annual log file initiation for CHP #### End of Event Log for CHP ###