EVENT LOG FOR SITE CHU The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/16/2011 15:27 Ben The thermoelectric generator shut off resulting in a loss of power to CHU from 10/13/11 at 07:56:04 to 10/21/11 at 14:15:51. Plywood sheeting was installed inside the TEG cage to protect the TEG and prevent power outages from water and snow coming off the roadway. Ben Truscott Fish and Wildlife Biologist 06/24/2011 07:15 Todd failure of the thermal electric limiter converter, that caused power to stop being produced and led subsequently to the batteries being drained and the mux losing power. Data was not recorded between 5-24-11 at 07:54:57 to 6-14-11 at 15:18:01. Todd Miller Fish and Wildlife Biologist Washington Department of Fish and Wildlife 3515 Chelan HWY. Wenatchee, WA 98801 Voice(509)664-3148 X24 Cell(509)630-3797 Fax(509)662-6606 Todd.Miller@dfw.wa.gov 04/11/2011 08:20 Todd The reader was down from 4-2-11 at 17:22:10 to 4-5-11 at 17:57:26. The site is currently running as of 4-5-11 at 17:57:26. Todd Miller Fish and Wildlife Biologist Washington Department of Fish and Wildlife 3515 Chelan HWY. Wenatchee, WA 98801 Voice(509)664-3148 X24 Cell(509)630-3797 Fax(509)662-6606 Todd.Miller@dfw.wa.gov 01/01/2011 00:00 PTOC_Bot Annual log file initiation for CHU #### End of Event Log for CHU ###