EVENT LOG FOR SITE ESJ Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 12/30/2003 22:59 Darren Both sites Data Collection Platforms and transceivers have been powered up and will be visited during the next week. This will be done to setup the DCP and the transceivers for the upcoming 2004 season. They are sending files into Portland at the standard 8 files per day. 06/05/2003 10:50 DChase Yesterday all three sites were visited for the purpose of shutting down the Data Collection Platforms as well as the transceivers. I coordinated with Dave Marvin and collected all missing files for these sites. these sites will not be ready to come on line until January 1, 2004. 05/01/2003 13:33 Dave I disabled site checking. 04/29/2003 12:41 Darren_C This site has not loaded, Don will be up there either tomorrow or Thursday and he would like to see what is on the screen so we have PCA'd into the site. There are no fish at this facility they were released all at once. They are working on inlet pumps this summer. 04/22/2003 15:54 scott Finally got Easton to upload files. After several attempts trying to manually send them, I restarted PC1 via PCA. Although there is no activity at this site, we would still like to see data from it so that PTOC can be kept abreast of what the state of the platform and transceivers are. 03/31/2003 08:26 Darren_C I received a message from Jason Rau on Friday. He is the one that was running a study at this facility. After checking past event logs for ESJ I realized that after they pulled the boards on Friday and all fish were released at once. There may be some fish left in the creek but they have pump repair scheduled fri mid-april. I will post any follow up information after talking to Charlie or Jason from the hatchery. 03/25/2003 13:51 Darren_C I PCA'd into the site to find out why files had not been downloaded. I found that PC1 was displaying a Dial-up connection box asking to connect. I closed this box and then I was seeing a message displayed that stated" no file path to host for ack file". I had to Stop and start minimon to break this string. I then discovered that the file was created at 06:00 on 3/24/03, so minimon had not created any files since the connection box was displayed but was collecting data into one big file. I then started the upload process and manually sent the files into Gladstone. I will check load at 15:00 to ensure there are no problems. 03/21/2003 14:04 Darren All three sites were visited for maintenance checks. The file generation and submission was changed at all site to reflect this years protocol of 8 files per day uploading 8 times per day with and offset of 120 seconds on the upload. No problems were found outside of what was reported earlier today from JCJ. 03/20/2003 13:35 Dave Enabled site polling in etc/sites file. 03/07/2003 11:16 Darren_C Date: Fri, 7 Mar 2003 10:00:36 -0600 From: "Charles Strom" Gentlemen, Ray Brunson and Don Larson will conduct their pre-release sampling at all acclimation sites next week starting March 11 and are schedule to complete the job on March 12. I am recommending that we pull screens at the Clark Flat and Jack Cr. sites on the 3/14/03 which is a Friday. Normally we shoot for the 3/15 but since this falls on the weekend we will pull screens one day earlier. Easton screens will remain until 3/31/03 when all of Jason's PAT fish will be released at once. Repairs to Easton pumps could start in mid-April which should allow fish enough time to leave outlet channel. 03/07/2003 10:06 Dave I explicitly added missing coil_id values to the ptagis3.test_tags table to address missing elements in the Timer Tag report for this site. 02/13/2003 23:54 D._Chase From: "Charles Strom" To: "Darren Chase" Sent: Thursday, February 13, 2003 8:37 AM Subject: Re: CFJ,ESJ,JCJ Darren, Here is a closer estimated number for fish located at each acclimation site. We will start releasing fish at Clark Flat and Jack Creek on March 14, 2003. One board from each raceway will be removed every two weeks after March 14 to lower pond levels and aid in fish movement. Fish located at Easton will not be released until March 31 and at that time all fish will be forced out of raceways as Jason's predator avoidance study will be completed. 02/13/2003 08:53 Darren_C Yesterday I visited JCJ to pump out the water from the flood that was caused when the creek flodded last week. When I arrived the Hatchery personnel was just delivering the last load of fish completing their delivery. The site was stick tested.The totals for all three sites and when they had fish delivered are as follows: CFJ - Delivered fish on January 13 and 14th. They are populating 2 raceways with 45,000 in each raceway. Total pittag fish is 9,000. ESJ - Delivered fish on February 5 and 6th. They are populating 6 raceways with 6,000 in each raceway. Total pittag fish 3,600. JCJ - Delivered fish February 11, 12, and 13th. They are populating 6 raceways with 45,000 in each raceway. Total pittag fish 27,000. I spoke with Vernon Bogar from the hatchery and it sounds like they will be pulling boards sometyime around the 2nd week of March. I will post the exact Date when I am notified by Cle Elum Hatchery. 01/01/2003 12:12 Dave Initialized new event log for 2003. 2002 event log has been archived. ####End of Event Log for ESJ###