EVENT LOG FOR SITE ESJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 06/21/2007 10:42 Dave Per Charlie Strom, the Easton acc ponds were completely dewatered on June 20, 2007. The last PIT tag detection occurred on May 17, following the forced release on May 15. 05/14/2007 09:10 Darren I spoke with Vernon Bogar and Charlie Strom (YIN Cle Elum Hatchery) this morning and they informed me that on Tuesday May 15th the remaining fish at all three (3) acclamation sites will be pushed out of the raceways. They will begin clean up of all sites and will keep us informed as to the status of the facility at Jack Creek with regards to power. 03/19/2007 08:53 Don_Warf Manually pushed files 077.E1 to 078.B1 03/15/2007 16:44 Dave Numerous detections indicate that volitional release began today. 03/02/2007 16:42 Dave Updated Timer Tag list to reflect current tag codes. 03/02/2007 08:46 dlwarf@r A2:TestTagFailure,B1:TestTagFailure: Clearing post-GMC alarms. 03/01/2007 09:11 Troy A site visit was made on 2/28/2007-03/01/2007 to prepare for the upcoming season. Previous year's data was moved to a "2006 Data" subfolder in the MiniMon folder. The monitors were opened and water was removed, ~10" from the A monitor and ~12" from the B monitor. The transceivers were tuned. The timer tag for transceiver A2 was replaced, the code is now 3D9.0EEEEEE225. The timer tag for transceiver B1 was replaced, the code is now 3D9.0EEEEEE365. 20 test sticks were thrown into each monitor, results following: A1 - 20/20 A2 - 20/20 B1 - 20/20 B2 - 20/20 The clocks on both PCs were set to within one second of atomic time, no other problems found. The buffers from the transceivers were erased. 02/28/2007 07:26 darren@r A2:TestTagFailure,B1:TestTagFailure: PSMFC will be on site today for Pre- Season maintenance. 02/27/2007 07:19 alan@ree A2:TestTagFailure,B1:TestTagFailure: These will be addressed during a site visit this week. 02/26/2007 07:41 darren@r A2:TestTagFailure,B1:TestTagFailure: Alarms will be addressed this week during the maintenance visit for the upcoming season. 02/22/2007 08:44 darren@r A2:TestTagFailure,B1:TestTagFailure: PSMFC is aware of these tag failures. The detection systems are running and are capable of PIT tag detection. PSMFC will be on site next week to address any issues prior to screen removal. 02/11/2007 11:39 scottl@r A2:TestTagFailure,B1:TestTagFailure: Problems will be corrected on the next GMC 02/08/2007 07:04 scottl@r A2:TestTagFailure,B1:TestTagFailure: Problems will be corrected during the next site visit. 02/03/2007 08:03 darren@r A2:TestTagFailure,B1:TestTagFailure: Problems will be addressed on the next site visit. 01/28/2007 09:19 troy@ree A2:TestTagFailure,B1:TestTagFailure: The TT may have fallen off or failed. PSMFC will address as soon as possible. 01/27/2007 10:45 troy@ree A2:TestTagFailure,B1:TestTagFailure: These transcievers are alive, the TT may have fallen off. PSMFC will investigate. 01/24/2007 13:36 Dave I updated the obs_site_dates table to reflect a 2007 start date of Jan. 23. 01/24/2007 13:17 Darren_C I received the following information from Charlie Strom of the YIN. Six ponds were transferred to Easton starting January 23 and finishing on January 24. Thanks Charlie The exact times were not relinquished but it sounds like it was a two day process. 01/12/2007 07:49 Darren_C I spoke with Charlie Strom this morning 1-11-07 and he stated that there were no fish delivered this week because of weather conditions and freezing intake pumps. There plans are to fire up ESJ and CFJ next week without fish and let them run. Fish will then be delivered starting the week of 1-22-07. If this schedule changes Charlie will notify this office and we will post the information. 01/01/2007 00:00 PTOC_Bot Annual log file initiation for ESJ #### End of Event Log for ESJ ###