EVENT LOG FOR SITE ESJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/18/2010 07:34 Alan Briefly exited MiniMon to delete a zip file and manually pushed the tardy files. Any file gap is inconsequential as the site is de-watered. 09/09/2010 08:37 Alan MiniMon was exited to delete a zip file and re-establish automated uploading. The outstanding files were archived. The file gap is inconsequential as the facility is dewatered. 08/25/2010 14:52 Alan Remotely added the Biomark 23 MM tag to the country code list in both PC1 and PC2 registries. 08/10/2010 08:12 Alan MiniMon was exited briefly on PC1 to delete a zip file. The outstanding files on PC1 were archived. The data gap is inconsequential as the site is dewatered. 07/23/2010 08:31 Darren I was able to PCA into the site and delete the .ZIP file in the temp directory. The outstanding files were uploaded to PTAGIS. 06/09/2010 09:35 Darren This information was sent to me yesterday from Charlie Strom. These are the end dates for all three acclimation sites. The site shut down periods were as follows: Jack Creek- shut down May 18 Clark Flat- shut down May 25 Easton- shut down June 1 05/24/2010 11:20 Darren Site personnel informed us that CFJ site is in the process of being shut down for the season, the remaining fish in the volitional creek are being evacuated and raceways being cleaned. ESJ will be completed by the end of the week. 05/12/2010 08:12 Darren This message was received yesterday from Charlie Strom, Cle Elum Hatchery Manager. We will be pushing out the remaining fish left at the three sites today 5/11/10. Thanks Charlie. 04/29/2010 12:25 Alan A GMC was performed 4/29/2010. All transceivers were checked and tuned as necessary. 10 sticks were thrown into each monitor with 100% detection. The clocks on both PCs were set to within one second of atomic time. The temp folders were cleared on both PCs. Outstanding files on PC2 were archived. No problems found. 04/09/2010 08:38 Troy The delinquent files were manually pushed to PTAGIS. Minimon had to be exited for a brief moment in order to delete a ZIP file. Nothing transpired on PC2 during this operation so no gap file was submitted. 03/25/2010 11:16 Darren A site GMC was performed today (3-25-10). The transceivers were checked for tuning and noise. 10 test sticks were passed through each monitor with 100% on the east monitor and 100% on the first coil of the west monitor and 90%. The test sticks tend to group in the pipe even when there is time between each stick. There has been an abundance of fish exiting the creek over the last 24hrs and the efficiencies are very high on each monitor. No problems were discovered during this visit. 03/15/2010 09:22 Darren The Screens at all three acclamation ponds are being pulled today, this was confirmed with Charlie Strom YN biologist. 03/14/2010 14:27 Dave I manually modified the FILE CLOSED time from "03:00" to "04:00" to circumvent a processing error associated with the shift from PST to PDT. 03/02/2010 10:24 Alan MiniMon was briefly exited at ~1020 3-2-2010 in order to delete a zip file. No activity was observed on PC2 during PC1's downtime. Files ESJ10060.C1 - ESJ10061.C1 were manually pushed tp PTAGIS. 03/01/2010 07:36 Troy Manually pushed the delinquent files. 02/18/2010 07:20 troy@bay A1:TestTagFailure,A2:TestTagFailure: These TT were replaced, clearing TASS. 02/17/2010 13:16 Dave I revised the Timer Tag list for ESJ per Darren's previous message. 02/17/2010 12:54 Darren The site was visited for the Pre-Season tune up of the systems. The timer tags that had failed on antennas A1 and A2 were replaced and the antenna shield boxes were checked for water and drained if necessary. The PC clocks were adjusted to within 1 second of atomic time and each other. 10 test sticks were passed through both monitors with 100% detection. The timer tag changes are as follows: ID Old New A1 3D9.0EEEEEE36E 3D9.0EEEEEE359 A2 3D9.0EEEEEE225 3D9.0EEEEEE360 The timer tag report will need to be changed to reflect these new codes. 02/17/2010 07:01 darren@b A1:TestTagFailure,A2:TestTagFailure: These alarms will be addressed today during pre-season site maintenance. 02/16/2010 07:31 darren@b A1:TestTagFailure,A2:TestTagFailure: These alarms will be addressed during the site visits this week. 02/01/2010 07:47 alan@bay A1:TestTagFailure: The timer tags will be addressed on the next site visit. The transceivers are optimized for detection. 01/31/2010 08:33 darren@b A1:TestTagFailure,A2:TestTagFailure: The timer tags will be addressed on the next site visit. The transceivers are optimized for detection. 01/30/2010 08:07 darren@b A1:TestTagFailure,A2:TestTagFailure: Timer tags will be addressed during the next visit. 01/28/2010 07:09 darren@b A1:TestTagFailure,A2:TestTagFailure: Transceivers checked for operation. Timer tags to be addressed on next site visit. 01/27/2010 07:19 darren@b A1:TestTagFailure,A2:TestTagFailure: The timer tags on these systems have failed. The transceivers are running and reporting to the data collection platform. PSMFC will address the timer tags during the next site visit. 01/20/2010 13:55 alan@bay A1:TestTagFailure,A2:TestTagFailure: Site down, clearing TASS. 01/14/2010 13:27 Dave I updated the obs_site_dates table to indicate that ESJ is 'Active' as of January 11, and expanded alert notifications to include Portland staff. 01/14/2010 10:18 Darren Charlie Strom (YN) site Biologist contacted PSMFC yesterday with information on the delivery of fish to this site. He stated that delivery began on Monday 1-11-10 and was completed on Tuesday 1-12-10 with all raceways being populated. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for ESJ #### End of Event Log for ESJ ###