EVENT LOG FOR SITE ESJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/01/2011 05:56 Alan Exited MiniMon briefly to delete a zip file that was preventing uploads. The site is currently down, all outstanding files were archived except the most recent file which was uploaded as a test. 07/07/2011 07:06 Alan Blueback was rebooted for maintenance at ~16:20 PDT 7-6-2011. The following files were not loaded and were submitted manually the morning of 7-7-2011: BO211187.E1, BO411187.E1, ESJ11187.E1, GOJ11187.105, GRA11187.105, GRJ11187.105, LMJ11187.108, ROZ11187.E1. No further issues exist. 06/01/2011 09:17 Darren PSMFC was informed that the boards were pulled and fish were evacuated from the raceways and into the volitional channel on 5-16-11. The channel was walked and all remaining fish were pushed through the monitors on 5-17-11. The facilities were then cleaned and shut down for the season. 05/24/2011 08:00 alan@bay B2:TestTagFailure: No apparent reason for this alarm. The site is most likely done for the year, we are awaiting confirmation on that. 05/21/2011 06:51 Troy@bay B2:TestTagFailure: Noted 05/16/2011 09:11 Darren The remaining fish in the raceways for both sites are being pushed out into the creek today. This was confirmed by PSMFC personnel with Charlie Strom (Cle Elum Hatchery Manager) this morning. The facilities will continue to run for another week and then be shut down for the season. The fish can remain the creek above the detectors until they flush the creeks. We will post that information when it provided. 05/06/2011 10:07 scottl Performed site GMC, all transceivers were retuned and calibrated as necessary, The A-side monitor appears to have water in the shield. Noise levels are at 13 to 20 percent, phase shifted by 4 percent, transceiver cannot be tuned any better. Timer tags are still firing consistently and the PIT tag detection levels are 100 percent. Per the site operator, fish are scheduled to be pushed from the raceway's on May 16th. Given the season is almost at the end and detection efficiencies have not suffered, the shield was not pumped dry. The A-side monitor should be repaired in the of season. No other issues to report. 04/10/2011 10:59 scottl Site had problems loading, deleted .zip file and manually submitted data files. No problems to report. 04/05/2011 13:24 Darren A site GMC was performed today (4-5-2011). All transceivers were checked for tuning, noise, and detectability. 10 sticks were passed through both monitors with 100% detection. No problems were discovered. 04/01/2011 14:59 alan@bay B2:TestTagFailure: Noted 03/16/2011 11:31 Darren Charlie Strom confirmed that the screens were pulled around 11:00 yesterday (3-15-11) at all three locations. 03/16/2011 07:23 Troy Pushed the delinquent file. 03/14/2011 11:59 scottl Performed site GMC for season start up. Pumped water out of both monitors and current on the B-monitors returned to 2 amps, low noise. Timer tags are all firing, no problems to report. Archive all previous years data, sync'd pc clocks. Added Roger to the PCA hosts lists for remote access. 03/01/2011 09:58 Darren With the assistance of site personnel we were able to reestablish satellite communications to the platform. The area is experiencing a very high volume of snow and it was removed from the dish. The outstanding files were submitted to PTAGIS. 03/01/2011 07:19 darren@b B2:TestTagFailure: Alarm will be addressed during the next site GMC. 02/28/2011 07:29 Troy@bay B2:TestTagFailure: This alarm will be addressed on the next site visit. 02/24/2011 07:25 Troy@bay B2:TestTagFailure: Noted 02/23/2011 07:13 darren@b B2:TestTagFailure: This alarm will be addressed during the next site visit. 02/21/2011 08:08 darren@b B2:TestTagFailure: This alarm will be addressed during the next site visit. 02/20/2011 07:53 darren@b B2:TestTagFailure: This will be addressed during the next site visit. 02/19/2011 07:35 darren@b B2:TestTagFailure: This alarm will be addressed during the next site visit. 02/15/2011 07:25 darren@b B2:TestTagFailure: This alarm will be addressed during the next site visit. 02/13/2011 11:32 scottl@b B2:TestTagFailure: noted 02/09/2011 07:58 darren@b B2:TestTagFailure: Alarm will be addressed during the next site visit. 01/29/2011 09:18 Troy@bay B2:TestTagFailure: This alarm will be addressed on the next site visit. 01/24/2011 07:30 Troy@bay B1:LowExcCurrent,B2:LowExcCurrent,B2:TestTagFailure: These alarms will be addressed on the next site visit. 01/19/2011 07:57 Darren Charlie Strom of the YN informed me today that fish have been delivered to the Easton acclamation ponds (ESJ). They were delivered on 1-13 thru -1-14-11. They are purposing to have the fish delivered to the Clark Flat acclamation site (CFJ) on 1-20 thru 1-21-11. 01/01/2011 00:00 PTOC_Bot Annual log file initiation for ESJ #### End of Event Log for ESJ ###