EVENT LOG FOR SITE 9_GRA Most recent activity to be listed first. First line of each entry lists date, time & who is reporting. Subsequent lines of each entry aligned under Time column. Date Time Who What -------- ----- -------- ----------------------------------------------- 12/08/97 13:09 dlwarf Site personnel report the site was shut down for the winter on 12/3/97 at 1:00pm. 12/01/97 15:05 dlwarf GRA-2, WEST: Annunciator warnings acknowledged. Replaced exciter for coils 12 and 14 on 11/26. Coil 14 had low current. 11/13/97 12:53 dlwarf GRA-2, WEST: Annunciator warnings acknowledged 09/02/97 09:02 scottl The data base tag file gra97241.db for the department of fish and wildlife was loaded on the interrogation platform 8/29/97 at 1330 with the assistance of carter stein. 08/12/97 08:41 dlwarf Visited for a general maintenance check and found no problems. 06/06/97 10:29 dlwarf Replaced cooling fans in both controllers. 05/22/97 07:54 dlwarf Visited for a general maint. check and found no problems. Site personnel report the by-code system working well. 05/20/97 10:58 dlwarf By-code function was turned on by site personnel on 5/19/97 at 4:30pm. 05/15/97 09:04 dlwarf Replaced network hub on 5/13. 05/08/97 07:57 scottl The Diversion by code system was completed 5/7/97 and is now operational. Gates are enabled. 05/05/97 11:42 scottl This mssg is in reference to problems encountered during the installation of the diversion by code system on 4/30/97. A bad Eprom was found to be the cause of no communication from the Binary hi speed controller during the initial installation. The grj spare eprom was used but has a controller I.D of 14 . The previous address was 00. This I.D. can only be changed by reprogramming the eprom. Per Carter S, This is not a problem. 05/05/97 09:22 carters PPP on grasun dialing out continuously so it was disabled yesterday. Data collection is continuing on a normal basis. 05/01/97 08:05 scottl Diversion by code platform was completed on 4/30. Pittag fish are not being diverted as NMFS is waiting on permits. When the proper permits are aquired PSMFC will activate the process. 04/28/97 08:18 scottl Installed Unix/Multimon collection platform and is operational as of 4/24. Visited site on 4/25 due to a failure to Close all When Close all command was issued. The cause of this was due to a Typo in the command path in multimon. 03/07/97 11:17 jen granite adult facility watered up on wednesday March 5th at 10a.m. ####End of Event Log for 9_GRA###