EVENT LOG FOR SITE 1_GRJ Most recent activity to be listed first. First line of each entry lists date, time & who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What -------- ----- -------- ----------------------------------------------- 12/16/99 15:56 carters GRJ-6, DIVERSION 2: Annunciator warnings acknowledged 12/16/99 15:55 carters GRJ-7, SUBSAMPLE: Annunciator warnings acknowledged 12/16/99 15:54 carters GRJ-5, DIVERSION 1: Annunciator warnings acknowledged 12/16/99 15:53 carters GRJ-3, RACEWAY WEST/EXIT: Annunciator warnings acknowledged 12/16/99 15:49 carters GRJ-2, B-SEPARATOR GATE: Annunciator warnings acknowledged 12/15/99 13:15 carters GRJ-1, A-SEPARATOR GATE: Annunciator warnings acknowledged 11/12/99 10:00 davem SMP personnel report that GRJ switched to primary bypass at 0700 on 11/10/99. The juvenile facility has been dewatered for the winter. Juvenile collection activities will resume during the latter part of March, 2000. 09/01/99 12:00 davem The PIT tag interrogation equipment was shut down at or after 7:00AM PDT and has been taken out of service. This is part of the scheduled conversion from the 400 kHz PIT tag to the new 134.2 kHz ISO compatible tag. Facility interrogations will resume (at the new frequency) when the collection site waters up in Spring of 2000. 08/23/99 09:43 scott_li T-1 connection at granite still not repaired. Called SMP to verify status of data collection computers. SMP inserted time stamp at 0832. Will follow up with Pete Peterson on status of repair. 08/19/99 08:16 scott_li I talked to Pete Peterson this morning and he informed me that the T-1 line at grj went down at approx. 0900 Aug 18th. Pete is waiting for a part to repair the problem and gave no ECD on when the problem will be fixed. 08/04/99 11:54 darren scott and noticed on monday afternoon that the controller that I repaired on friday had locked up again.We were unable to look at reports until Monday afternoon.We also noticed that the exciter for coils 2c,2e was dead.We repla exciters on coils 2c,2e and 18,1A.We also replaced controller 12 because it was continuously running self tests and then locking up.Checked all other exciters and performed stick tests.Everythhing checked out fine. 08/04/99 11:47 darren Friday 7/30/99 went up to check on raceway/exit monitor because of low effec and found that the controller 12 had locked up.I had replaced the exciter on coils 1c,1e because I thought that was the problem.I checked the exciter on coils 18,1a and found nothing out of the ordinary I checked all the connectors and the connections to the loop tuner.I could not get coil 1a to respond.I ran sticks and everything seemed to be working with the exception of coil 1A. 08/02/99 15:02 scottl Due to loss of T-communications in gladstone, PTOC Maint. personell called site and asked SMP to verify data collection platform was operational. Inserted marker in file for clarification. 07/14/99 davem The PIT tag bypass system was set to override the sample beginning at 0700 on July 14. 07/07/99 11:19 scottl Rebooted Sun computer at 0823 DST. Per Todd, The Cron jobs are not running properly on the sun. Todd manually ran the send mail script process to pull the data that has not been previously sent GRJ99185.004 07/04/99 18:00 07/05/99 00:00 to GRJ99188.001 07/07/99 00:00 07/07/99 06:00. Todd is investigating as why the process is not operating correctly... 06/17/99 09:56 scottl 6/16/99 Replaced corroded connector and power filter box on Sub-Sample coil 20,22. Tested good. 06/04/99 18:54 dlwarf Replaced exciter for coils 2C and 2E due to low efficiency. Stick tested monitor at 15 for 15 on both coils. 06/01/99 11:02 scottl Replaced exciter on B-separator coil 2e due to low efficiency. This work was done Saturday May 30th. Stick tested monitor at 100 percent eff. 05/28/99 12:00 davem Smolt Monitoring Program personnel report that the facility bypassed 70,409 smolts because the barge trip for May 28 was cancelled. These fish were collected into raceways and the sample tank between 7 a.m. May 27 and 7 a.m. May 28. The raceways contained PIT-tagged fish purposely diverted for the Comparative Survival Study (CSS), as well as tagged fish incidentally diverted from the normal river exit route. 05/24/99 13:01 scottl The previous entry is information for LMJ only 05/13/99 08:50 scottl Installed Multimon ver. 6.04 to prevent loss of system redundantcy if the file server is not accessable to the PC's. COE personnel noticed that the B-Side Slide gate was not opening around 1030am on 5/11/99. Responded to the problem at 1330 hrs. Problem with the gate was due to a dry plunger in the primary gate solenoid and a bad relief valve. Gate was grought back online at approx. 2000 hrs 5/11/99. 05/12/99 09:24 carters GRJ-6, DIVERSION 2: Annunciator warnings acknowledged 05/12/99 09:23 carters GRJ-5, DIVERSION 1: Annunciator warnings acknowledged 05/12/99 09:23 carters GRJ-1, A-SEPARATOR GATE: Annunciator warnings acknowledged 05/08/99 08:52 scottl Used telnet session to verify file content of current files being built. Also verified that the preceding files closed cleanly with the correct footer information. 05/05/99 12:18 carters On Friday, April 30, the grj server ran out of disk space. Data continued to be collected on the master and slave computers. Disk space was made available by removing files from 1997 and 1998.On May 5, files grj99119.* and grj99120.00[1-3] were copied from the slave pc to the pc1/logfiles directory on the server for normal processing. 04/27/99 11:43 carters GRJ-6, DIVERSION 2: Annunciator warnings acknowledged 04/27/99 11:42 carters GRJ-5, DIVERSION 1: Annunciator warnings acknowledged 04/27/99 11:37 carters GRJ-2, B-SEPARATOR GATE: Annunciator warnings acknowledged 04/27/99 11:37 carters GRJ-1, A-SEPARATOR GATE: Annunciator warnings acknowledged 04/27/99 10:54 dlwarf Replaced solenoids for the B-side slide gate due to sticking. Site personnel reported a power failure on 4/25/99 that lasted from 4:00 pm to 5:00 pm. 04/19/99 13:53 scottl Changed Physical Com port settings back to factory defaults (Com2,IRQ3) to avoid any Conflicts with the master/slave link and PLC controls. 04/13/99 16:23 dlwarf Replaced both solenoids for slide gate A on 4/12/99. 04/12/99 13:02 carters GRJ-3, RACEWAY WEST/EXIT: Annunciator warnings acknowledged 04/06/99 10:03 dlwarf Work completed on 4/5/99: Retuned coils 2C and 2E and replaced exciter on B-Separator. Ran 35 sticks and read 35 on both coils. Set timeouts and retrys to 2 and 2 on both PCs. Filled oilers on slide gates and reset timing. 04/02/99 12:00 davem Updated by-code database with 388 records to complete CSS database with the full complement of 1999 DWOR releases. 03/26/99 12:00 davem LGR JFF was placed in secondary bypass for collection of fish at 0700h 3/25/99. By-Code diversion of 1999 Comparative Survival Study (CSS) groups was implemented at 1500h. 03/26/99 11:42 scottl Pre season tuning has been completed. Slide gates have been thoughly tested and timed. stick test results for separator coils below: A-sep. coils 28,2a detected 40 of 40 stick tags, all tags where diverted B-sep. coils 2c,2e detected 40 of 40 stick tags, all tags where diverted Replaced loop tuner on b-sep. coil 2e. Replaced exciter on w. raceway coil 18 1a. Stick test results for W. raceway. All coils detected 40 of 40 stick tags. Replaced exciter on E. raceway coils 14,16. Stick test results for E. raceway. All coils detected 40 of 40 stick tags. Replaced exciter on diversion-1 coils 36,38 Stick test not possible. All timer tags fired successfully. Sub-sample monitor, Stick test not possable.All timer tags fired successfully. When arriving at the site, Collection computer pc1 was not recieving data from the controllers via the rocket port interface. Further diagnostics concluded that the serial cable interface between the R.P and the expansion chassis was the problem. Sandy and Dave M are to replace the cables and relay the final dispostion of the platform to kennewick O&M. 03/26/99 11:16 scottl Interrogation equipment was powered up on 3/15/99 to begin collecting Timer tag data. 03/10/99 12:19 scottl Upgraded high speed firmware in both h.s controllers. 02/22/99 14:32 carters Initial log creation for 1_GRJ ####End of Event Log for 1_GRJ###