EVENT LOG FOR SITE GRP The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 04/14/2010 10:31 Mike Fish were ponded in Raceways 1-4 on March 23, 2010 for the second group through the acclimation facility. The detectors for ponds 1-4 were activated at 12:00pm (pst) 30 March (begin volitional release). The fish were forced from these raceways on 13 April after 10:00 Am (pst). 03/29/2010 14:13 Mike All of the fish were forced from all of the ponds by 3:00pm 22 March. The time stamp for this group of fish was in PDT. 03/29/2010 13:46 Mike Fish were ponded in Raceways 1-4 on 8 and 9 March 2010. The detectors for ponds 1-4 were activated at 12:00pm 15 March (begin volitional release). The fish were forced from these raceways on 22 March after 12:00 pm. Mike McLean CTUIR 62415-A Hwy 82 La Grande, OR 97850 541-663-1794 541-663-8058 fax 01/01/2010 00:00 PTOC_Bot Annual log file initiation for GRP #### End of Event Log for GRP ###