EVENT LOG FOR SITE HYC The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/27/2010 10:06 Mike Site operations at HYC are normal with no interruptions in interrogation activity to report. PIT tag detections have declined since the seasonal removal of the IDFG/ISEMP rotary screw trap on 11/21/2010, which is located just upstream of HYC. 10/03/2010 13:56 Mike Site operations are normal at HYC. The screw trap located just upstream of the array has been busy lately and capture rates of juvenile salmon and steelhead will likely peak over the next two weeks. 09/15/2010 08:04 Mike Site operations are currently normal, but interrogation activity at HYC was interrupted between 8/31/2010 at 20:12:27 PST and 9/3/2010 17:34:27 PST. Also, the HYC modem was briefly swapped with another modem at Kenney Creek between 8/19/10-8/23/10 to investigate communication issues at Kenney Creek. 08/01/2010 17:03 Mike Site operations are normal. 07/11/2010 13:22 Mike Site operations are normal. 06/18/2010 14:16 Mike Site operations are normal. Interrogation activity at HYC is slow and the Hayden Creek screw trap was removed on 6/03/2010 due to high flows and debris. 06/02/2010 07:56 Mike Just a follow up on the last event log, HYC interrogation activity was interrupted between 00:21 PST on 5/16/10 to 1000 PST on 5/20/10. Site operations are normal and we are continuing to pursue a longer-term power supply at HYC. 05/26/2010 13:36 Mike Interrogation activity at HYC was interrupted for a few days, but the site is up and running. HYC is currently running off a single set of batteries for now, with batteries being swapped out every day until a longer-term power source is established. 05/18/2010 15:22 Mike Interrogation activity was interrupted on 5/16/2010 at 00:21:11 PST due to power issues. We are working to resolve these issues ASAP. 05/06/2010 11:04 Mike Site operations are normal. Cold weather has dropped flows in Hayden Creek and the screw trap above the array is capturing only a few fish per day. 04/28/2010 09:05 Dave Jody White (Quantitative Consultants) has replaced Jeff Lutch (IDFG) as the Data Steward. 04/16/2010 10:36 Mike Site operations are normal. Stream flow has slightly increased in the past few days. 03/06/2010 09:32 Mike Site operations are normal. HYC interrogation activity will increase due to the installation of the Hayden Creek rotary screw trap on 3/3/2010. This trap is located approximately 50 meters upstream of the array site. 02/05/2010 09:24 Mike Site operations are normal. 01/21/2010 09:22 Mike Site operations are normal at HYC. Recent warmer weather has reduced the ice along the banks of Hayden Creek and the stream channel remains open. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for HYC #### End of Event Log for HYC ###