EVENT LOG FOR SITE HYC The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/28/2012 15:34 Cameron A DC-DC power regulator was installed in August 2012. In addition, gland fittings were made for the enclosure to accommodate the PVC antenna cables. 01/01/2012 00:00 PTOC_Bot Annual log file initiation for HYC #### End of Event Log for HYC ###