EVENT LOG FOR SITE IR1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/13/2011 09:43 Cameron During the late winter of 2011, Imnaha River PIT tag array (IR1) experienced high noise levels. Biomark staff made several trips to the site and found a faulty circuit board in the thermo electric generator (TEG). Site diagnostics and repairs from January 11 through March 10, 2011 resulted in approximately 44 hours of downtime and lost diagnostic report send (DRS) and Tag observation data. 01/24/2011 10:54 Rick IR1 became operational on December 3, 2010. The in-stream detection system consists of a single array located in the lower Imnaha River.The array (IR1) is located at river km 7 (N 45.761162, W -116.750658) and consists of four 20 foot Biomark flat panel antennas that span the entire river at base flow.IR1 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe and Quantitative Consultants, Inc. and was installed for continuous monitoring on December 3, 2010. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level.Electrical power is provided by a solar/propane hybrid thermal electric generator and remote communication provided by a satellite modem. The satellite modem communication system that allows two-way data transfer. Data (system diagnostic information, PIT tag observations, and site environmental conditions) are uploaded automatically every two hours from the sites to the ISEMP PIT ARRAY server in Boise, ID. Daily interrogation files are sent automatically to PTAGIS following PTAGIS file standards. -- ----------------------------------------------------------------------- - Rick Orme Nez Perce Tribe Dept. Fisheries Resources 125 S. Mission St. PO Box 1942 McCall, ID 83638 Phn. 208.634.5290 Fax 208.634.4097 ----------------------------------------------------------------------- - 01/01/2011 00:00 PTOC_Bot Annual log file initiation for IR1 #### End of Event Log for IR1 ###