EVENT LOG FOR SITE IR1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/22/2013 15:06 Cameron The site is running continuously without disruption through 10/22/13. Angle aluminum shields (3" X 2") were bolted on the upstream edge of antenna 1,2, and 3 to alleviate wear on the fiberglass channel and decking on 8/14/13. 05/17/2013 09:58 Cameron The site is functioning properly without disruption through May 17, 2013. 01/02/2013 00:00 PTOC_Bot Annual log file initiation for IR1 #### End of Event Log for IR1 ###