EVENT LOG FOR SITE JCJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 09/08/2011 15:16 Alan The old PCA accounts were deleted and the new account was added. 04/15/2011 09:23 Darren I was informed this morning by site Personnel Charlie Strom that the facility will be without power from today until Monday. The power will be restored on Monday but only for the final clean up of the site and then power will be terminated for the rest of the year. 04/08/2011 12:17 Dave I updated the obs_site_dates table to note the completion of release activity on April 7. 04/08/2011 09:17 Darren I was able to confirm with Charlie Strom (YN fisheries) all the fish were released on 3-31-2011 due to the flooding of the river and surrounding areas. The fish were released into the channel outside of the raceways and allowed to volitionaly travel to the Teanaway river. The channel was walked on 4-7-2011 and all remaining fish were pushed out through the detection monitors. 04/01/2011 10:36 scottl Due to the recent flooding event at this facility, the detection efficiencies of the the 2 PIT tag antenna arrays are less than desirable. Facility personnel physically crowded the fish from the raceways, causing a massive amount of fish to enter the PIT tag arrays and, due to probable tag collisions, dropping the detection efficiencies. Additionally, some unknown portion of the evacuated fish were routed directly to the river, bypassing the PIT tag antenna groups in the exit channels. 04/01/2011 07:35 Darren Due to severe flooding, the juveniles were pushed out of the facility yesterday according to site personnel. 03/30/2011 10:44 Darren A site GMC was performed (3-30-11). All transceivers were checked for tuning, and noise. 10 diversion sticks were passed through both monitors with 100% detection and diversion. No problems were discovered. 03/16/2011 11:31 Darren Charlie Strom confirmed that the screens were pulled around 11:00 yesterday (3-15-11) at all three locations. 02/28/2011 07:58 Darren I was able to confirm with YN Fisheries Biologist that the first batch of fish were delivered to Jack Creek acclamation ponds on 2-17-11 and concluding on 2-18-11. 02/27/2011 11:13 scottl@b A2:TestTagFailure: Noted 02/24/2011 08:26 Troy The satellite for PC1 appears to be down. I was able to PCA into PC2 and verify data collection on that pc. PMSFC will continue to monitor. 02/18/2011 08:11 Alan An apparent power outage caused a file gap of 01:06:00 on 2/18/2011. No data exist on either PC to fill this gap. 02/15/2011 07:55 Alan MiniMon was exited briefly on both PCs to update the registry so as to detect the 384 country code. This was the last site to have this done, all other PTAGIS maintained sites were done in Aug 2010. No activity was seen on PC2 during PC1's downtime. 02/09/2011 14:03 Darren PSMFC was informed today that power was restored to the Jack Creek facility on Monday and the computer platform UPS's were powered on today around 11:15. I verified that all detection systems are operating. YN fisheries will delivering fish to the site on Thursday/Friday of next week. PSMFC will turn on the Network notifications and file submission check. 01/01/2011 00:00 PTOC_Bot Annual log file initiation for JCJ #### End of Event Log for JCJ ###