EVENT LOG FOR SITE JCJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 09/21/2012 07:31 Darren On Tuesday 7-24-12, PSMFC was on site to de-commission one of the satellite feeds. ERN 60004605 was removed and the sonicwall that accompanied that system was also removed. PC1 was connected to the sonicwall that provides service to the utility and PC2. 05/18/2012 07:29 Alan Charlie Strom reports that power for the season was cut to the facility at ~12:30 5-17-2012. 05/15/2012 06:33 Darren This message was sent from Charlie Strom hatchery manager for Cle Elum. Fish at all three acclimation sites were forced out of raceways. We will start cleaning and shutting down sites this week. 04/17/2012 11:43 Roger Performed site GMC 0n 4/17/2012. All transceivers were checked for tune and adjusted as needed. The UPS's were checked for battery status. They checked OK. Cleaned the PIT tag cart and left cleaning supplies in the locker. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 04/06/2012 11:04 Roger Performed site GMC on 4/6/2012. All transceivers were checked for tune and asdjusted as needed. 10 sticks were thrown on the A and B coils. All tags were read on all transceivers. Files on PC2 were archived. PC1 and PC2 are within 1 second of atomic time and each other. No problems to report. 03/29/2012 08:18 scottl Fish delivered as of 3-19-2012. Awaiting information as to when boards will be pulled. 03/07/2012 07:48 Alan On 3-7-2012, files JCJ12062.J2, K2 & L9 were tailored and uploaded to PTAGIS from PC2 - to fill a gap in data on 3-2-2012. 02/24/2012 07:34 alan@bay A1:TestTagFailure,A2:TestTagFailure,B1:TestTagFailure: These alarms were addressed yesterday during a site visit. 02/23/2012 15:04 darren A pre-season maintenance gmc was performed today. Thew timer tags were replaced. The new codes are as follows: A1: 3D9.0EEEEEE35E A2: 3D9.0EEEEEE4F7 B1: 3D9.0EEEEEE189 B2: 3D9.0EEEEEE280 Y these will need to be changed in the timer tag report. The 2011 files were archived on PC1. 5 test sticks were passed through each monitor with 100% detection. No other problems were disocvered. 02/16/2012 13:15 Scott_Li PC1 will not come back online and cannot be remotely accessed. Verified PC2 is collecting data. A site visit is scheduled for the week of 2/20. Also, xcvrs A2 and B2 are non-responsive. The UPS for these units is probably either bad or off. 01/01/2012 00:00 PTOC_Bot Annual log file initiation for JCJ #### End of Event Log for JCJ ###