EVENT LOG FOR SITE JD1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/18/2013 13:33 gabrielb CANbus cable for antennas 07 - 0C was moved down stream and anchored away from the antennas to reduce the apparent ground loop, thus raising antenna current. 10/18/2013 13:32 gabrielb Antennas 01-05 were disconnected. An apparent ground loop was causing low antenna current. Antenna 06 is the only active upstream antenna. Antennas 07 - 0C are the downstream array which spans from bank to bank at lower water levels. 10/18/2013 13:31 gabrielb FS1001M was replaced by an IS1001-MTS. Twelve antennas were installed and active (01 - 0C). Antennas 01-06 upstream, 07-0C downstream). 04/09/2013 10:33 TriciaL This is a Tricia Test 01/02/2013 00:00 PTOC_Bot Annual log file initiation for JD1 #### End of Event Log for JD1 ###