JOHN DAY DAM JUVENILE FISH SAMPLE FACILITY EVENTS Date Event 6/22/93 Data since 6/10/93 downloaded from JDJ today installed in database. -- pcs 6/14/93 Data from Bonneville and John Day Dams through 10 June 1993 will be available as of tomorrow morning (15 June 1993). 05/13/93 Data loaded manually from diskette. Replaced phone cord. Reports from site personnel: 1. Pipe broke this morning about 0330, spilling approx. 500 fish onto top of dam; most of these died. 2. Unit three (where sampling is done) shut down about 0700 today, until during the day tomorrow. 3. On restart, sampling will be done from one gatewell instead of two (as before). (R Buchanan) 04/30/93 Visited site; found a splice in phone cord came apart. Will replace cord. Copied data to diskette, returned to Portland and loaded manually. (R Buchanan) 04/19/93 Attempted to call; modem did not answer. (R Buchanan) 03/29/93 Turned on; operating normally (R Buchanan)