12/20/2005 18:03 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/12/20
15:15:58
12/20/2005 18:03 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/12/20 15:15:58
12/20/2005 18:03 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/12/20
15:15:58
12/20/2005 18:03 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/12/20
15:15:56
12/20/2005 18:03 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/12/20
15:15:56
12/20/2005 18:03 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/12/20 15:15:55
11/23/2005 14:57 Alan_Bro
No data exists to fill the 44-minute file gap on 10/12/2005. No pertinent
data were lost as the facility was dewatered at the time.
11/07/2005 08:53 troy@ree
11:ReaderReset,12:InputSyncDetect,12:InputSyncLost: Random Reader Reset
11/02/2005 08:04 scottl@r
01:ReaderReset,02:InputSyncDetect,02:ReaderReset,41:ReaderReset,42:InputSy
ncDetect,42:ReaderReset,43:InputSyncDetect,43:InputSyncLost,91:ReaderReset
,92:InputSyncDetect,92:ReaderReset,93:InputSyncDetect,93:InputSyncLost,B1:
ReaderReset,B2:InputSyncDetect,B2:ReaderReset,B4:InputSyncDetect,B4:InputS
yncLost: Problems will persist until the adult monitor construction is
completed
11/01/2005 08:25 scottl@r
01:ReaderReset,02:InputSyncDetect,02:ReaderReset,41:ReaderReset,42:InputSy
ncDetect,42:ReaderReset,43:InputSyncDetect,43:InputSyncLost,91:ReaderReset
,92:InputSyncDetect,92:ReaderReset,93:BadOscFreq,93:LowExcCurrent,B1:Reade
rReset,B2:InputSyncDetect,B2:ReaderReset,B3:InputSyncDetect,B3:InputSyncLo
st,B4:InputSyncDetect,B4:InputSyncLost: Alarms were caused by breakers in
the main AC panel being cycled. Various alarms may still be present in
day's to come . This is all due to the construction and installation of
the Adult fall back monitor.
10/31/2005 15:00 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/10/31
14:13:22
10/31/2005 15:00 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/10/31
14:13:21
10/31/2005 15:00 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/10/31
14:13:20
10/31/2005 15:00 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/10/31
14:13:19
10/31/2005 08:51 Scott_Li
Manually PCA'd into each of the multimon sites and stopped and started the
MM application due to the daylight savings time Phenom.
10/24/2005 08:17 Troy
Manually pushed LMJ05295.103.
10/13/2005 08:21 darren@r
93:InputSyncLost: The facility is currently de-watered and this alarm
will be addressed as needed.
10/12/2005 11:59 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/10/12 08:04:06
10/12/2005 11:59 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/10/12
08:04:06
10/12/2005 11:59 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/10/12 08:04:06
10/12/2005 11:59 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/10/12
08:04:06
10/12/2005 11:59 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/10/12 08:04:06
10/12/2005 11:59 DGE_Robo
AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2005/10/12 08:04:06
10/12/2005 11:59 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/10/12 07:09:44
10/12/2005 11:59 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/10/12
07:09:44
10/12/2005 11:59 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/10/12 07:09:44
10/12/2005 11:59 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/10/12
07:09:44
10/12/2005 11:59 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/10/12 07:09:44
10/12/2005 11:59 DGE_Robo
AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2005/10/12 07:09:44
10/07/2005 08:16 Alan_Bro
PC1 was rebooted to re-establish automated uploading at 12:51 PST
10/6/2005.
The resultant six minute file gap is not of concern as the facility is out
of operation for the season.
10/05/2005 08:13 Scott_Li
The connection the LMJ is extremely slow, site is down for the year.. PTOC
will be onsite today for other reasons and will check on status of PC,
possible reboot.
10/04/2005 14:09 Dave
I disabled site-checking in etc/sites, and updated the
ptagis3.obs_site_dates table to reflect the end of facility operations on
Oct. 1.
10/04/2005 14:00 Scott_Li
Manually submitted delinquent files from PC1 via remote access. Will
monitor
data submission from this site for reoccurring problems.
10/04/2005 12:54 Don_Warf
Site Bio's announcement of season shutdown at LMJ:
Don,
We ended collection on October 1 at 0700 and then chased fish from the
separator to the sample holding tanks for final processing. Water was
shut
off and the facility was drained on Monday October 3rd and all areas other
than the bypass proper are now dewatered.
As I understand it your group will be here tomorrow to begin the PIT
detection via adult release pipe project. Looking forward to your
arrival.
See you then.
Bill
10/01/2005 11:36 scottl@r
41:ReaderReset,42:InputSyncDetect,42:InputSyncLost: will monitor for re-
ocurrence
10/01/2005 07:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/10/01 05:58:32
09/30/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/30 05:58:55
09/30/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/30 05:58:55
09/30/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/30
05:58:55
09/30/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/30
05:58:55
09/30/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/30
05:48:53
09/30/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/30
05:48:53
09/30/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/30 05:48:53
09/30/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/30 05:48:53
09/29/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/29 06:00:59
09/29/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/29 06:00:59
09/29/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/29
06:00:59
09/29/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/29
06:00:59
09/29/2005 07:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/29
05:53:00
09/29/2005 07:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/29 05:53:00
09/29/2005 07:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/29
05:53:00
09/29/2005 07:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/29 05:52:59
09/20/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/20 06:05:48
09/20/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/20 06:05:48
09/20/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/20
06:05:48
09/20/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/20
06:05:48
09/20/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/20
05:52:00
09/20/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/20
05:52:00
09/20/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/20 05:52:00
09/20/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/20 05:52:00
09/19/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/19 06:00:46
09/19/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/19 06:00:46
09/19/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/19
06:00:46
09/19/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/19
06:00:46
09/19/2005 08:34 Alan_Bro
Manually pushed LMJ05262.102 to PTAGIS via PCA. PTTP Uploader reported:
Error transmitting PTTP package:Operation interrupted.
Examination of the hold directory shows that the file did indeed transfer.
PTAGIS Field Operations will continue to monitor.
09/19/2005 08:24 Alan_Bro
I'm working on getting the file to PTAGIS.
-----Original Message-----
From: pittag@psmfc.org [mailto:pittag@psmfc.org]
Sent: Monday, September 19, 2005 7:15 AM
To: sitemaint@psmfc.org
Subject: Problems with remote data sites...
The following problems with remote sites were detected;
lmj: Last data submission was received on Mon Sep 19 3:04:13 PST 2005
Please check this out.
09/19/2005 08:23 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/19
05:55:26
09/19/2005 08:23 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/19
05:55:26
09/19/2005 08:23 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/19 05:55:26
09/19/2005 08:23 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/19 05:55:26
09/18/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/18 06:03:55
09/18/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/18 06:03:55
09/18/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/18
06:03:55
09/18/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/18
06:03:55
09/18/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/18
05:52:01
09/18/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/18 05:52:01
09/18/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/18
05:52:01
09/18/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/18 05:52:01
09/17/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/17 05:59:50
09/17/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/17 05:59:50
09/17/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/17
05:59:50
09/17/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/17
05:59:50
09/17/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/17
05:53:31
09/17/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/17
05:53:31
09/17/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/17 05:53:31
09/17/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/17 05:53:30
09/16/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/16 06:08:13
09/16/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/16 06:08:13
09/16/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/16
06:08:13
09/16/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/16
06:08:13
09/16/2005 07:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/16
05:53:22
09/16/2005 07:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/16
05:53:22
09/16/2005 07:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/16 05:53:22
09/16/2005 07:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/16 05:53:22
09/15/2005 10:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/09/15 06:00:39
09/15/2005 10:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/09/15 06:00:39
09/15/2005 10:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/09/15
06:00:39
09/15/2005 10:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/09/15
06:00:39
09/15/2005 07:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/09/15
05:55:33
09/15/2005 07:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/09/15
05:55:33
09/15/2005 07:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/09/15 05:55:33
09/15/2005 07:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/09/15 05:55:33
09/01/2005 15:43 Alan_Bro
A GMC was performed 9/1/2005. All transceivers were tuned. The air
pressure is currently 99psi on both separator gates.
The A and B separator gates were tested with 15 sticks each (all sticks
diverted properly), results following:
A1 15/15
A2 15/15
A3 15/15
A4 15/15
B1 15/15
B2 15/15
B3 15/15
B4 15/15
31 15/15
32 15/15
33 15/15
41 15/15
42 15/15
43 15/15
Multimon is running full screen on both PCs. No problems found.
08/15/2005 08:23 Scott_Li
Correction LoMo was not effect by the outage, only MCJ and Granite. The T-
1
has been down since 8/13, 3:14. Pete will call when status is provided as
to
when the system will be back online. Will call on-site personnel to help
verify data collection.
08/15/2005 08:13 Scott_Li
Per Pete Peterson in WW district office, a T-1 line is down that services
the data link for the listed site. It appears, the line has been down
since
3:14 am last night, Unclear as to when the situation will be corrected. ,
more info to follow..
08/11/2005 10:50 Alan_Bro
With the help of on site personnel, the platform was rebooted to
re-establish PCA connectivity. Files LMJ05223.205 and LMJ05223.206 were
submitted from PC2 to fill the gap during PC1's downtime. The clocks on
both
PCs were adjusted to within one second of atomic time.
08/10/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/10 06:02:04
08/10/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/10 06:02:04
08/10/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/10
06:02:04
08/10/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/10
06:02:04
08/10/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/10
05:56:26
08/10/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/10
05:56:26
08/10/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/10 05:56:26
08/10/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/10 05:56:26
08/09/2005 10:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/09 06:04:05
08/09/2005 10:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/09 06:04:05
08/09/2005 10:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/09
06:04:05
08/09/2005 10:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/09
06:04:05
08/09/2005 07:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/09
05:52:04
08/09/2005 07:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/09
05:52:04
08/09/2005 07:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/09 05:52:04
08/09/2005 07:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/09 05:52:04
08/08/2005 10:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/08 06:01:10
08/08/2005 10:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/08 06:01:10
08/08/2005 10:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/08
06:01:10
08/08/2005 10:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/08
06:01:10
08/08/2005 07:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/08
05:55:11
08/08/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/08
05:55:11
08/08/2005 07:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/08 05:55:11
08/08/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/08 05:55:11
08/07/2005 10:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/07 06:05:04
08/07/2005 10:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/07 06:05:04
08/07/2005 10:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/07
06:05:04
08/07/2005 10:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/07
06:05:04
08/07/2005 07:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/07
05:53:08
08/07/2005 07:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/07 05:53:08
08/07/2005 07:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/07
05:53:08
08/07/2005 07:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/07 05:53:08
08/06/2005 10:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/06 06:01:01
08/06/2005 10:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/06 06:01:01
08/06/2005 10:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/06
06:01:01
08/06/2005 10:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/06
06:01:01
08/06/2005 07:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/06
05:54:29
08/06/2005 07:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/06
05:54:29
08/06/2005 07:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/06 05:54:29
08/06/2005 07:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/06 05:54:29
08/05/2005 07:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/08/05 05:48:56
08/05/2005 07:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/08/05 05:48:56
08/05/2005 07:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/08/05
05:48:56
08/05/2005 07:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/08/05
05:48:56
08/05/2005 07:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/08/05
05:36:48
08/05/2005 07:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/08/05
05:36:48
08/05/2005 07:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/08/05 05:36:48
08/05/2005 07:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/08/05 05:36:48
08/02/2005 15:05 Alan_Bro
A GMC was performed 8/2/2005. All transceivers were tuned. The air
pressure is currently 99psi on both separator gates.
The A and B separator gates were tested with 15 sticks each (all sticks
diverted properly), results following:
A1 15/15
A2 15/15
A3 15/15
A4 15/15
B1 15/15
B2 15/15
B3 15/15
B4 15/15
31 15/15
32 15/15
33 15/15
41 15/15
42 15/15
43 15/15
PC1 was 00:00:54 ahead and PC2 was 00:02:42 behind. Both clocks were
adjusted and are now within one second of atomic time. LMJ05214.208 was
manually submitted from PC2 to fill the gap during PC1's downtime.
Multimon is running full screen on both PCs. No other problems found.
08/01/2005 16:28 Troy
Manually pushed lmj05213.104-105
07/29/2005 08:56 darren@r
51:ReaderReset,52:InputSyncDetect,52:InputSyncLost: Alarms were generated
by a random reader reset.
07/25/2005 16:01 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/25 14:04:17
07/25/2005 16:01 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/25 14:04:17
07/22/2005 16:01 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/07/22 14:11:59
07/22/2005 16:01 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/07/22 14:11:58
07/22/2005 13:32 Dave
The original version of my LMJ05201.907 patch file did not contain the
proper header line to establish when the file was activated. I added this
line:
Opened C:\MULTIMON\PC1DATA\LMJ05201.907 at 05/07/20 19:15:01
to the file, and modified the CLOSE tag to better synchronize with the
OPEN tag in the subsequent LMJ05201.108 file, and then resubmitted the
modified patch file. The edited patch file was reprocessed by PTAGIS at
10:21 on July 22. No new detection or operational data were added.
07/22/2005 09:25 scottl@r
01:ReaderReset,02:InputSyncDetect,02:ReaderReset,11:ReaderReset,12:InputSy
ncDetect,12:ReaderReset,13:InputSyncDetect,13:ReaderReset,21:ReaderReset,2
2:InputSyncDetect,22:ReaderReset,23:InputSyncDetect,23:ReaderReset,31:Read
erReset,32:InputSyncDetect,32:ReaderReset,33:InputSyncDetect,33:ReaderRese
t,41:ReaderReset,42:InputSyncDetect,42:ReaderReset,43:InputSyncDetect,43:R
eaderReset,51:ReaderReset,52:InputSyncDetect,52:ReaderReset,81:ReaderReset
,82:InputSyncDetect,82:ReaderReset,91:ReaderReset,92:InputSyncDetect,92:Re
aderReset,93:ReaderReset,A1:ReaderReset,A2:InputSyncDetect,A2:ReaderReset,
A3:InputSyncDetect,A3:ReaderReset,A4:InputSyncDetect,A4:ReaderReset,B1:Rea
derReset,B2:InputSyncDetect,B2:ReaderReset,B3:InputSyncDetect,B3:ReaderRes
et,B4:InputSyncDetect,B4:ReaderReset: Errors generated after power outage.
See Dave's posting for details.
07/21/2005 17:04 Dave
An extended power outage, beginning at ~18:57 (PST)on July 20, resulted in
the truncation of LMJ05201.107 some time after 19:15, and a 28-minute gap
in data collection on LMJ-PC1. Fortunately, the UPS on LMJ-PC2 outlasted
the power outage, and I was able to retrieve the LMJ05201.207 file and
extract and data for the missing interval on LMJ-PC1. I programmatically
closed LMJ05201.107, and uploaded the LMJ05201.907 patch file. Because of
a minor framing shift in the files, there is a 3-minute gap between my
patch file and the subsequent LMJ05201.108 file. There was no fish or PLC
data reported during this remaining 3-minute gap.
07/21/2005 00:01 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/20 19:43:15
07/21/2005 00:01 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/07/20
19:43:15
07/21/2005 00:00 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/20 19:43:15
07/21/2005 00:00 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/07/20
19:43:15
07/21/2005 00:00 DGE_Robo
AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2005/07/20 19:43:14
07/21/2005 00:00 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/07/20 18:57:16
07/21/2005 00:00 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/07/20
18:57:16
07/21/2005 00:00 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/07/20 18:57:16
07/21/2005 00:00 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/07/20
18:57:16
07/21/2005 00:00 DGE_Robo
AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2005/07/20 18:57:15
07/20/2005 16:08 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/20 14:07:59
07/20/2005 16:08 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/20 14:07:59
07/20/2005 09:51 scottl@r
B4:InputSyncDetect,B4:InputSyncLost: Will monitor for re-occurring
events. This could mean that the sync output on 03 is failing.
07/19/2005 14:20 Alan_Bro
A GMC was performed 7/19/2005. All transceivers were tuned. The air
pressure is currently 99psi on both separator gates.
The A and B separator gates were tested with 15 sticks each, results
following:
A1 15/15
A2 14/15
A3 15/15
A4 15/15
B1 15/15
B2 15/15
B3 15/15
B4 14/15
31 15/15
32 15/15
33 15/15
41 15/15
42 15/15
43 15/15
All sticks diverted properly. Multimon is running full screen on both PCs.
No problems found.
07/17/2005 08:05 darren@r
B1:ReaderReset,B2:InputSyncDetect,B2:InputSyncLost: Alarm was generated
by a random reader reset.
07/15/2005 16:09 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/07/15 14:00:18
07/15/2005 16:09 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/07/15 14:00:18
07/14/2005 08:10 darren@r
B4:InputSyncDetect,B4:InputSyncLost: No direct cause for this alarm. It
will be investigated on the next site visit.
07/08/2005 16:08 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/08 14:01:06
07/08/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/07/08
14:01:06
07/08/2005 16:08 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/08 14:01:05
07/08/2005 16:08 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/07/08
14:01:05
07/08/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/07/08
13:55:52
07/08/2005 16:08 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/07/08 13:55:52
07/08/2005 16:08 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/07/08
13:55:48
07/08/2005 16:08 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/07/08 13:55:48
07/07/2005 16:09 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/07 14:00:39
07/07/2005 16:09 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/07 14:00:39
07/07/2005 16:09 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/07/07
14:00:39
07/07/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/07/07
14:00:39
07/07/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/07/07
13:55:38
07/07/2005 16:08 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/07/07 13:55:37
07/07/2005 16:08 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/07/07
13:55:36
07/07/2005 16:08 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/07/07 13:55:36
07/07/2005 08:19 troy@ruf
B4:InputSyncDetect,B4:InputSyncLost: Noted
07/06/2005 08:03 scottl@r
B2:InputSyncDetect,B2:ReaderReset,B3:InputSyncLost,B4:InputSyncDetect,B4:I
nputSyncLost: On-going known problem, common no action required
07/05/2005 15:23 Alan_Bro
A GMC was performed 7/5/2005. All transceivers were tuned. The air
pressure is currently 90psi on both separator gates.
The A and B separator gates were tested with 15 sticks each, results
following:
A1 15/15
A2 15/15
A3 15/15
A4 15/15
B1 15/15
B2 15/15
B3 15/15
B4 15/15
31 15/15
32 15/15
33 15/15
41 15/15
42 15/15
43 15/15
All sticks diverted properly. Multimon is running full screen on both PCs.
No problems found.
07/04/2005 22:14 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/07/04 17:54:15
07/04/2005 22:14 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/07/04
17:54:15
07/04/2005 22:14 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/07/04 17:54:14
07/04/2005 22:14 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/07/04
17:54:14
07/04/2005 22:14 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/07/04
17:54:03
07/04/2005 22:14 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/07/04
17:54:02
06/28/2005 16:15 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/28 14:14:46
06/28/2005 16:15 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/28 14:14:45
06/28/2005 16:15 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/28 13:59:55
06/28/2005 16:15 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/28
13:59:55
06/28/2005 16:15 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/28 13:59:54
06/28/2005 16:15 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/06/28
13:59:54
06/28/2005 16:15 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/28
13:54:55
06/28/2005 16:15 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/28 13:54:55
06/28/2005 16:15 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/06/28
13:54:54
06/28/2005 16:14 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/28 13:54:54
06/27/2005 16:13 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/27 14:01:26
06/27/2005 16:13 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/27
14:01:26
06/27/2005 16:13 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/27 14:01:24
06/27/2005 16:12 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/06/27
14:01:24
06/27/2005 16:12 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/06/27
13:56:31
06/27/2005 16:12 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/27 13:56:31
06/27/2005 16:12 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/27
13:56:30
06/27/2005 16:12 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/27 13:56:29
06/27/2005 11:28 Darren
After the GMC both PC's have Multimon running in a full screen upon
departure.
06/27/2005 11:27 Darren
A site GMC was performed today (6-27-05). All the transceivers were
checked for tuning and noise. No problems were found. 15 diversion test
sticks were passed on both the "A" and "B" separator monitors with 100%
detection and diversion.
06/26/2005 16:14 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/26 14:02:20
06/26/2005 16:14 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/26 14:02:16
06/26/2005 16:14 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/26
14:02:15
06/26/2005 16:14 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/26
14:02:12
06/25/2005 23:17 Darren
It appears that the WW district sites have loaded. I never received any
contact from the district on a time frame for completion of the server
replacement. I will verify efficiencies tomorrow morning during my check
of the river system.
06/25/2005 19:41 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/06/24
18:43:41
06/25/2005 19:41 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/06/24
18:43:33
06/25/2005 19:40 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/06/24
18:42:43
06/25/2005 19:40 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/06/24
18:42:10
06/25/2005 19:40 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/24 18:42:10
06/25/2005 19:40 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/24 18:42:06
06/25/2005 15:04 Darren
I have not heard from anyone at WW district to confirm the completion time
for the server replacement. I will post more when I have a confirmation.
06/25/2005 12:34 Darren
All Walla Walla district sites have not loaded. I contacted site
personnel at LMJ and confirmed there was no outside connection. They
stated that the district is changing out the server. I am trying to
contact Dave Desmaris to get a time frame for the replacement to be
completed.
06/25/2005 08:54 Darren
I have tried to PCA into the sites but I am unable to get through. I
suspect there is a problem in the district network and will wait to see
if the sites load this afternoon, if not I will try to verify the
problem with Pete Peterson.
06/24/2005 16:13 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/24
13:59:56
06/24/2005 16:13 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/24
13:54:47
06/24/2005 16:12 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/24 13:54:47
06/23/2005 16:11 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/06/23
14:01:11
06/23/2005 16:11 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/23 14:01:06
06/23/2005 16:11 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/23
14:01:05
06/23/2005 16:11 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/06/23
13:56:27
06/23/2005 16:11 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/23 13:56:27
06/23/2005 16:11 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/23
13:56:22
06/23/2005 16:11 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/23 13:56:22
06/22/2005 19:07 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
17:43:28
06/22/2005 19:07 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
17:43:03
06/22/2005 19:07 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/06/22
17:42:44
06/22/2005 19:07 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
17:42:32
06/22/2005 16:05 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/06/22
14:43:53
06/22/2005 16:05 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/06/22
14:43:53
06/22/2005 16:05 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/22 14:43:36
06/22/2005 16:05 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/22 14:43:36
06/22/2005 16:05 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
14:37:42
06/22/2005 16:05 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
14:37:41
06/22/2005 16:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/06/22
14:35:18
06/22/2005 16:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/06/22
14:35:17
06/22/2005 16:05 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/06/22
14:35:03
06/22/2005 16:05 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/06/22
14:35:03
06/22/2005 16:05 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/06/22
14:10:54
06/22/2005 16:05 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/06/22
14:10:53
06/22/2005 16:04 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
12:50:13
06/22/2005 16:04 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/06/22
12:50:12
06/22/2005 14:04 Dave
Updated database to LMJ05173.DB. PC clocks are within 2 seconds of each
other and 24 seconds of atomic time. This is the last daily CSS update of
the LMJ database for the 2005 migration season.
06/21/2005 16:22 Dave
Updated database to LMJ05172.DB. PC clocks are within 1 second of each
other and 20 seconds of atomic time.
06/20/2005 12:03 Dave
Updated database to LMJ05171.DB. PC clocks are within 1 second of each
other and 17 seconds of atomic time.
06/19/2005 10:43 Dave
Updated database to LMJ05170.DB. PC clocks are within 1 second of each
other and 13 seconds of atomic time. I failed to clear the "buffered" tag
reported on PC2 during the database switchover. Since there was no new
detection activity during the few seconds I had PC1 off-line, I chose not
to upload the PC2 patch file that included the redundant (and delayed)
detection on PC2.
06/18/2005 12:47 Dave
Updated database to LMJ05169.DB. PC clocks are within 1 second of each
other and 11 seconds of atomic time.
06/17/2005 09:44 Dave
Updated database to LMJ05168.DB. PC clocks are within 1 second of each
other and 5 seconds of atomic time.
06/16/2005 17:10 Dave
We did not receive data files from any of the COE Walla Walla sites at
4:00 PM this afternoon. I could not pcA into any of these sites at 4:20
PM. However, I was able to pcA in 4:55 PM, and manually pushed the single
outstanding data file at each site to the PTAGIS file server. All appears
to be OK now.
06/16/2005 11:07 Dave
Updated database to LMJ05167.DB. PC clocks are within 1 second of each
other and 3 seconds of atomic time.
06/16/2005 08:11 darren@r
SLC500:CommsFailure: The SLC Comms alarm was generated from PC2 while PC1
was being detected. The diversion was not missed.
06/15/2005 12:43 Dave
Updated database to LMJ05166.DB. Reset PC clocks to within 1 second of
each other and atomic time. I lost pcA contact with PC2 while PC1 was out
of data collection mode; then I lost contact PC1. I was able to restore
contact to PC2, but could no re-connect to PC1. I called Monty Price
(WDFW-SMP) and had him reboot PC1. I was then able to pcA into PC1, and
transfer MultiMon control back to PC1 from PC2, and upload the 'active'
data files to PTAGIS. I noticed at least two 'SLC Comm' errors that
occurred outside any intervals when both PCs were simultaneously vying for
gate control. All appears to be well now.
06/14/2005 16:17 Dave
Updated database to LMOJ05165.DB. PC clocks are within 4 seconds of each
other and 67 seconds of atomic time.
06/13/2005 13:26 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/06/13
09:50:43
06/13/2005 13:26 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/06/13
09:50:43
06/13/2005 13:26 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/06/13
09:50:42
06/13/2005 13:26 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/06/13
09:50:42
06/13/2005 11:43 Troy
Loaded a modified PLC program with the blessing of the site Bio.No new or
different functionality was added. The message instruction was moved to
the end of the program. PSMFC will monitor the sample settings to see if
any more erroneous sample rates are recorded by multimon. Loaded modified
PV300 and PV600 programs as well. Site personell were informed that the
sample is still the same but is 2 min 20 sec's behind what they are
normally used to. They will take care of resetting it to their liking.
Verifed communications between the PLC and multimon and that everything is
working as it should. All looks well.
06/13/2005 09:44 Dave
Updated database to LMGOJ05164.DB. PC clocks are within 4 seconds of each
other and 60 seconds of atomic time.
06/11/2005 11:03 Don_Warf
LMJ file lmj05162.101 is being held in the hold directory. This will be
resolved on Monday.
06/11/2005 10:55 Dave
File LMJ05162.101 was not automatically uploaded this morning, although we
subsequently received LMJ05162.102 LMJ05162.103. I pcA'd into LMJ-PC1 and
manually uploaded the file. The file transfer failed during the first
PTTP transmission attempt, due to an unknown communication fault, but the
second attempt was successful. All is well.
06/10/2005 14:48 Dave
Updated database to LMJ05161.DB. PC clocks are within 4 seconds of each
other and 55 seconds of atomic time.
06/09/2005 13:41 Dave
Updated database to LMOJ05160.DB. PC clocks are within 3 seconds of each
other and 50 seconds of atomic time.
06/08/2005 10:49 Dave
Updated database to LMJ05159.DB. PC clocks are within 2 seconds of each
other and 47 seconds of atomic time.
06/07/2005 14:17 Dave
Updated database to LMJ05158.DB. PC clocks are within 2 seconds of each
other and 44 seconds of atomic time.
06/07/2005 08:37 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/06/06 20:41:30
06/07/2005 08:36 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/06/06 20:41:20
06/06/2005 11:05 Dave
Updated database to LMJ05157.DB. PC clocks are within 2 seconds of each
other and 40 seconds of atomic time.
06/04/2005 10:18 Dave
Updated database to LMJ05155.DB. PC clocks are within 2 seconds of each
other and 34 seconds of atomic time.
06/03/2005 13:14 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/06/03 09:48:07
06/03/2005 13:14 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/06/03 09:48:02
06/03/2005 09:59 Dave
Updated database to LMJ05154.DB. PC clocks are within 1 second of each
other and 30 seconds of atomic time.
06/02/2005 10:31 Dave
Updated database to LMJ05153.DB. PC clocks are within 1 second of each
other and 26 seconds of atomic time.
06/01/2005 15:07 Dave
Updated database to LMJ05152.DB. PC clocks are within 1 second of each
other and 24 seconds of atomic time.
05/31/2005 13:30 Darren
This entry is in addition to the previous entry. Both PC's have Multimon
running in a full screen upon departure.
05/31/2005 13:25 Darren
A site GMC was performed today (5-31-05). All transceivers were checked
for tuning and noise. 20 test sticks were passed through both the "A" and
"B" separator monitors. The stick test showed that the "B" separator was
not opening soon enough so the "delay before operate" time was adjusted
from 50 to 35. After the adjustment 15 sticks were passed through the
monitor. All sticks were detected and diverted. the current PLC settings
are as follows:
A B
Delay before operate 45 35
Travel open 33 30
Time open 130 130
Travel close 30 26
The air pressure for both gates was at 95 psi.
05/31/2005 10:15 Dave
Updated database to LMJ05151.DB. PC clocks are within 1 second of each
other and 20 seconds of atomic time.
05/30/2005 18:39 Dave
Ken Fone, USACE, provides the following information regarding his
maintenance activities at Lower Monumental.
"The times for the LoMo PIT-tag diversion system outages for cleaning
vegetation and juvenile lamprey from the underside of the water supply
perforated plates are listed below."
1235- Ken tagged out A-side PIT system so Rick can clean screens -
cut off counters
1345- A-side PIT system back in service - Ken removed tags
1355- Ken tagged out B-side PIT system so Rick can clean screens -
cut off counters
1525- B-side PIT system back in service - Ken removed tags
05/30/2005 16:07 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/05/30
13:56:11
05/30/2005 09:34 Dave
Updated database to LMJ05150.DB. PC clocks are within 1 second of each
other and 17 seconds of atomic time.
05/29/2005 11:02 Dave
Updated database to LMJ05149.DB. PC clocks are within 1 second of each
other.
05/28/2005 16:37 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/05/28
14:21:43
05/28/2005 09:47 Dave
Updated database to LMJ05148.DB. PC clocks are within 1 second of each
other and 10 seconds of atomic time.
05/27/2005 19:19 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/05/27 15:43:35
05/27/2005 19:19 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/05/27 15:43:35
05/27/2005 19:19 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/05/27
15:43:35
05/27/2005 19:19 DGE_Robo
AC_Power (AC_Power) changed from 'OFF' to 'ON' at 2005/05/27 15:43:35
05/27/2005 19:19 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/05/27 15:43:25
05/27/2005 19:18 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/05/27 15:43:25
05/27/2005 19:18 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/05/27
15:43:25
05/27/2005 19:18 DGE_Robo
AC_Power (AC_Power) changed from 'ON' to 'OFF' at 2005/05/27 15:43:25
05/27/2005 09:42 Dave
Updated database to LMJ05147.DB. PC clocks are within 2 seconds of each
other and 8 seconds of atomic time.
05/26/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/05/26
14:24:18
05/26/2005 16:08 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/05/26
14:24:18
05/26/2005 16:08 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/05/26
13:57:04
05/26/2005 16:08 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/05/26
13:57:03
05/26/2005 15:45 Alan_Bro
FW: PIT system outage and work times
-----Original Message-----
From: Spurgeon, William F NWW
[mailto:William.F.Spurgeon@nww01.usace.army.mil]
Sent: Thursday, May 26, 2005 3:13 PM
To: Alan Brower (E-mail)
Cc: Fone, Kenneth R NWW
Subject: FW: PIT system outage and work times
"B" side PIT outage at LoMo 1220-1320 5/26/05 "A" side PIT outage at
lomo
1321-1435 5/26/05
counter tank supply inadequacy. opened and cleaned perf plates.
Bill
-----Original Message-----
From: Brooks, Francis C NWW
Sent: Thursday, May 26, 2005 2:43 PM
To: Spurgeon, William F NWW
Subject: PIT system outage and work times
1220- bled air from B-side PIT system & cut off counters 3&4 to prepare
for
Rick to remove PCT supply perf plates for cleaning - A-side will be next
1235- Bill placed Switching permit on B-side PIT system air supply
1305- A-side PCT dried up while Rick was working on B-side? - supply was
at
100% - bled air from A-side PIT system & cut off counters 1&2 - they had
already registered thousands.
1320- B-side PIT system placed back in service - perf plates clogged with
mostly debris & some juvenile lamprey, Bill removed Switching permit
1321- Bill placed Switching permit on A-side PIT system air supply
1435- A-side PIT system placed back in service, Bill removed Switching
permit
05/26/2005 13:08 Alan_Bro
A site visit was made 5/26/2005. It was noticed that the A separator gate
diversion efficiency had dropped to 92%. It was also noticed that the B
separator gate diversion efficiency had dropped to 75%.
The gates were checked mechanically. The A gate snubber was adjusted for a
smoother soft close. The B gate Travel Close time was lowered from 30 to
26 and it's snubber was adjusted to improve the close cycle for that gate.
The water level in the B flume had dropped in the last week. According to
site personel, they normally keep the water at ~2" in front of the
monitor. It had dropped to ~1/2". This allowed fish to more easily swim
back upstream, avoiding diversion. During testing, site personnel lowered
the water back to about 1/2" and the fish could be observed doing just
that. The water level was restored to it's normal ~2" level and the gate
was stick tested. All 40 sticks diverted properly.
The A gate was also stick tested and it was noticed that the gate opened
well before the stick arrived. The Delay Before Operation was increased
from 0 to 45. 40 sticks were thrown, all diverted properly.
A discussion was had with site personnel about maintaining proper flow
levels.
The air pressure is currently 95psi on both A and B gate. Current gate
time settings are:
Gate A
Delay Op 45
Travel Open 33
Time Open 130
Travel close 30
Gate B
Delay Op 50
Travel Open 30
Time Open 130
Travel close 26
Multimon is running full screen on both PCs. PTAGIS Field Operations will
continue to monitor.
05/26/2005 10:55 Dave
Updated database to LMJ05146.DB. PC clocks are within 2 seconds of each
other and 5 seconds of atomic time.
05/25/2005 11:15 scottl
DGE inciated that the diversion efficiency for the B-slide gate was at 67
percent. Stick test indicated that the delay before operate setting was
too short. Adjusted the B-Slide gate, Delay Before Operate timer from 15
to 50. All 20 sticks were successfully diverted. Results below.
B-Separator Gate
B1 19/20
B2 20/20
B3 20/20
B4 19/20
B-Diversion
41 20/20
42 20/20
43 20/20
PLC time values for B-Gate as follows:
Gate B
Delay Op 50
Travel Open 30
Time Open 130
Travel close 30
Gate A
Delay Op 0
Travel Open 33
Time Open 130
Travel close 30
Air Pressure on both Gates set at ~ 98 psi.
Per site personell, No significant changes were made to the water velocity
thru the B-flume. The water velocity in the A flume is significantly
faster than that of the B-flume, Hence the drastic differences in Delay
Before Op on A vs B.
Verified the Multimon App. on both computers are running in a DOS full
screen mode.
05/25/2005 09:55 Dave
Updated database to LMJ05145.DB. PC clocks were reset to within 1 second
of each other and atomic time.
05/24/2005 09:28 Dave
Updated database to LMJ05144.DB. PC clocks are within 9 seconds of each
other and 111 seconds of atomic time.
05/23/2005 14:12 Alan_Bro
A GMC was performed 5/23/2005. All transceivers were tuned.
In an effort to increase the A separator gate diversion efficiency, Delay
Op was lowered from 4 to 0 and Time Open was increased from 120 to 130.
During this process Travel Open was increased from 28 to 33 to improve
gate operation.
The air pressure is currently 95psi on both A and B gate. Current gate
time settings are:
Gate A
Delay Op 0
Travel Open 33
Time Open 130
Travel close 30
Gate B
Delay Op 15
Travel Open 30
Time Open 130
Travel close 30
The A and B separator gates were stick tested, results following:
A1 30/30
A2 30/30
A3 30/30
A4 30/30
B1 23/23
B2 23/23
B3 23/23
B4 23/23
31 28/29 One stick was thrown during sample
32 29/29
33 29/29
41 21/21 Two sticks were thrown during sample
42 21/21
43 21/21
All sticks diverted properly.
The A and B raceways were sticktested, results following:
11 20/20
12 20/20
13 20/20
21 20/20
22 20/20
23 19/20
Multimon is running full screen on both PCs. No other problems found.
05/23/2005 08:48 Davet
Updated database to LMJ05143.DB. PC clocks are within 9 seconds of each
other and 108 seconds of atomic time.
05/22/2005 22:29 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/05/22
18:20:53
05/22/2005 22:29 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/05/22
18:20:53
05/22/2005 22:29 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/05/22
18:20:43
05/22/2005 22:29 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/05/22
18:20:43
05/22/2005 10:09 alan@ruf
SLC500:CommsFailure: These alarms could possibly have occurred
during a database update. One PIT Tag diversion was missed during this
time frame. PTAGIS Field Operations is working on a solution to this
problem.
05/22/2005 07:49 Dave
Updated database to LMJ05142.DB. PC clocks are within 8 seconds of each
other and 103 seconds of atomic time.
05/21/2005 10:16 Dave
Updated database to LMJ05141.DB. PC clocks are within 8seconds of each
other and 101 seconds of atomic time.
05/20/2005 11:00 Dave
Updated database to LMJ05140.DB. PC clocks are within 8 seconds of each
other. I'm unable to obtain current atomic time.
05/19/2005 12:27 Dave
Updated database to LMJ05139.DB. PC clocks are within 8 seconds of each
other and 93 seconds of atomic time.
05/19/2005 08:11 troy@ruf
SLC500:CommsFailure: Noted
05/18/2005 13:41 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/05/18
11:53:49
05/18/2005 13:41 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/05/18 11:53:49
05/18/2005 13:41 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/05/18 11:53:39
05/18/2005 13:41 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/05/18
11:53:39
05/18/2005 11:14 Dave
Updated database and map files to LMJ05138.DB and LMJ05138.MAP.
respectively. In addition to the normal CSS updates, the database
contains 99k new tag codes for AC-91, a new group for the Snake River
subyearling Chinook Transportation Evaluation study. The new map file
defeats diversion for this group, and routes them to the raceways for
transportation. The PC clocks are within 8 seconds of each other and 91
seconds of atomic time.
05/17/2005 12:13 Dave
Updated database to LMJ05137.DB. PC clocks are within 7 seconds of each
other and 87 seconds of atomic time.
05/16/2005 16:03 Dave
Sharon Lind provides the following information regarding Lower Monumental
JFF operations. Fish were bypassed back to the river at Lower Monumental
for extended periods between May 9 and May 15. On Monday, May 9, the
raceways were drained back to the river starting at 1400h (1pm PST) and
all fish crossing the separator (or returned from the sample room) after
that time were also routed to the river (secondary bypass). The drained
raceways contained fish that had been collected and held since between
1500h and 2000h on Sunday, May 8. There are no PIT tag monitors on the
routes between the raceways and the river exit, and so the final
disposition for tagged fish returned to the river most likely refers to
"A-Raceway" or "B-Raceway". The facility remained in secondary bypass
until 1200h on Friday, May 13. (During this period, PIT-tagged fish were
supposedly "diverted" to or from the raceways, but all fish were
ultimately returned to the river through a route interrogated by a PIT tag
monitor.) Collection for transportation resumed as 1235h on May 13.
However, on Saturday, May 14, fish were diverted back to the river from the
switch gate upstream of the separator (primary bypass) from 0210 - 1235h,
and again on Sunday, May 15 between 0800h and 1300h. No fish enter the JFF
during primary bypass; consequently, there are no PIT tag detections of any
fish during these periods. Outside of the primary bypass episodes during
these two days, all fish, including PIT-tagged fish, were routed over the
separator and collected for transportation or diverted back to the river
per "normal" operations.
05/16/2005 12:27 Darren
A site GMC was performed today (5-16-05) all transceivers were checked for
noise and tuning, the diversion gates were checked for operation but no
test sticks were passed through the monitors because of the volume of fish
. I spoke with Ken Phone and Bill Spurgeon about any incidances that may
have occured on Sunday afternoon, During a check this morning of the
reports it was noticed that the Primary Bypass indicator had changed
states from "open" to "close" at 11:58 yesterday and at 12:00 we received
another "close" state but there was no "open", This can happen if the PLC
loses power for a short period. to the knowledge of the staff there was no
power loss. PSMFC will chek into this and post more when it is available.
there are no problems with diversion at this time.
05/16/2005 08:57 Dave
Updated database to LMJ05136.DB. PC clocks are within 7 seconds of each
other and 83 seconds of atomic time.
05/15/2005 16:34 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/05/15 12:00:01
05/15/2005 13:43 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/05/15 11:58:43
05/15/2005 11:06 Dave
Updated database to LMJ06135.DB. PC clocks are within 6 seconds of each
other and 82 seconds of atomic time.
05/15/2005 10:47 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/05/15 07:02:49
05/14/2005 13:50 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/05/14 11:36:56
05/14/2005 10:59 Dave
Updated database to LMJ05134.DB. PC clocks are within 6 seconds of each
other and 76 seconds of atomic time.
05/14/2005 04:40 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/05/14 01:15:49
05/13/2005 14:40 Alan_Bro
A GMC was performed 5/13/2005. All transceivers were tuned. No sticks were
thrown at the separator due to the high numbers of fish at the facility.
The A and B separator gates were observed diverting fish and all is well.
The air pressure on the A gate is currently 105psi. The air pressure on
the B gate is currently 93psi.
The A and B river exits (antennas 81, 82 and 01, 02 respectively) have
been used lately. The facility has been in and out of secondary bypass due
to not enough barge capacity. The CEA report has shown poor efficiency for
transceiver 01. 20 sticks were thrown in that monitor with both
transceivers reading 20/20 sticks. PTAGIS Field Operations will continue
to monitor.
Both computers are running Multimon in full screen mode. No problems
found.
05/13/2005 10:02 Dave
Updated database to LMJ05133.DB.The PC clocks are within 6 seconds of each
other and 74 seconds of atomic time.
05/12/2005 09:50 Carter_S
-------- Original Message -------- Subject: LoMO
pit gate outages Date: Wed, 11 May 2005 14:29:29 -
0700 From: Spurgeon, William F NWW
To:
Darren Chase , Don Warf , PIT Tag
Operations Center , Scott Livingston
Tuesday 5/10 side "A" 1620 - 1715 hours. Out of service to reattach
cylinder shaft to gate yolk. Used lock tite to assure that the
attachement didn't work its way off again. Wed 5/11 side "B" 1130-1155
hours. Out of service to "lock Tite" shaft to yolk so that "A" side
problem wouldn't occur on the "B" side. If you have questions call me,
PS: please give this info to Troy. He called this mornin to see what had
happened. Spurgeon, LoMo 509 282-7211 begin:vcard fn:Carter Stein
n:Stein;Carter org:Pacific States Marine Fisheries Commission;PTAGIS and
Columbia Basin Projects adr:Ste. 100;;205 SE Spokane
St.;Portland;OR;97202-6413;USA email;internet:carters@psmfc.org
title:Program Manager tel;work:503.595.3116 tel;fax:503.595.3232
tel;cell:503.709.6174 x-mozilla-html:TRUE
url:http://test.ptagis.org/ptagis/ version:2.1 end:vcard
05/12/2005 07:58 Darren_C
This message was received from Bill Spurgeon the Site Biologist.
Tuesday 5/10 side "A" 1620 - 1715 hours. Out of service to reattach
cylinder shaft to gate yolk. Used lock tite to assure that the attachment
didn't work its way off again.
Wed 5/11 side "B" 1130-1155 hours. Out of service to "lock Tite" shaft to
yolk so that "A" side problem wouldn't occur on the "B" side.
Darren R. Chase
PSMFC
Systems Engineer
(509) 735-2773 ext.3
05/12/2005 06:19 Dave
Updated database to LMJ05132.DB. PC clocks are within 6 seconds of each
other and 70 seconds of atomic time.
05/11/2005 16:04 Troy
Tuesday 5/10 side "A" 1620 - 1715 hours. Out of service to reattach
cylinder shaft to gate yolk. Used lock tite to assure that the
attachement didn't work its way off again.
Wed 5/11 side "B" 1130-1155 hours. Out of service to "lock Tite" shaft
to yolk so that "A" side problem wouldn't occur on the "B" side.
If you have questions call me, PS: please give this info to Troy. He
called this mornin to see what had happened.
Spurgeon, LoMo
509 282-7211
05/11/2005 15:15 Don_Warf
_____
From: Spurgeon, William F NWW
[mailto:William.F.Spurgeon@nww01.usace.army.mil]
Sent: Wednesday, May 11, 2005 1:29 PM
To: Darren Chase; Don Warf; PIT Tag Operations Center; Scott Livingston
Subject: LoMO pit gate outages
Tuesday 5/10 side "A" 1620 - 1715 hours. Out of service to reattach
cylinder shaft to gate yolk. Used lock tite to assure that the
attachement
didn't work its way off again.
Wed 5/11 side "B" 1130-1155 hours. Out of service to "lock Tite" shaft to
yolk so that "A" side problem wouldn't occur on the "B" side.
If you have questions call me, PS: please give this info to Troy. He
called
this mornin to see what had happened.
Spurgeon, LoMo
509 282-7211
05/11/2005 08:24 Troy
Spoke with Bill Spurgeon this morning and he reported that the shaft of
A Gate had come loose from it's trunion. It was discovered around 16:20
and fixed by 17:15. Looking at the DGE report it appears that the gate
malfunctioned sometime in the 13:00 hour.
B gate is expected to be taken down today and locktite put on it so it
does not experience the same failure.
05/11/2005 08:09 troy@ruf
SLC500:CommsFailure: Noted
05/11/2005 07:11 Dave
Updated database to LMJ05131.DB. PC clocks are within 5 seconds of each
other.
05/10/2005 11:32 Dave
Updated database and map files to LMJ05130.DB and LMJ05130.MAP,
respectively. New map file monitors, but does not divert AC48 (Asotin
Creek steelhead). New database includes 2500 AC48 tag codes. PC clocks
are within 5 seconds of each other and 64 seconds of atomic time.
05/10/2005 08:18 darren@r
11:RocketPortNoEOT,13:RocketPortNoEOT,21:RocketPortNoEOT,22:RocketPortNoEO
T,23:RocketPortNoEOT,31:RocketPortNoEOT,32:RocketPortNoEOT,SLC500:CommsFai
lure: PSMFC Will investigate this problem. It appears that there may some
communication issues that will need to be addressed. It may be caused by
the volume of fish that are passing through the system.
05/09/2005 12:20 Dave
Updated database to LMJ05129.DB. PC clocks are within 5 seconds of each
other and 61 seconds of atomic time.
05/08/2005 08:23 Dave
Updated database to LMJ05127.DB. PC clocks are within 4 seconds of each
other and 56 seconds of atomic time.
05/07/2005 09:00 scottl@r
43:InputSyncDetect,43:InputSyncLost,93:BadOscFreq,B1:TestTagFailure,B2:Inp
utSyncDetect,B2:InputSyncLost,B2:ReaderReset,B2:TestTagFailure,B3:InputSyn
cDetect,B3:InputSyncLost,B4:InputSyncDetect,B4:InputSyncLost,B4:TestTagFai
lure: This problem has been corrected, will monitor for re-occurring
events
05/07/2005 08:09 Dave
Updated database to LMJ05127.DB. PC clocks are within 4 seconds of each
other and 56 seconds of atomic time. SLC500 Comms errors were generated
during the database update while both computers competed for gate control.
05/06/2005 12:58 Troy
B gate was being worked on from approximately 11:30 to 12:45. A 'snubber'
was added to the 'squealer'. Gate times were checked with 30 sticks. One
stick was missed due to sample. B2 was replaced.
B's gate times are
Delay op 15 (was 5)
Travel open 30
Time open 130 (was 115)
Travel close 30
No changes were made to A
05/06/2005 09:59 Dave
Updated database to LMJ05126.DB. PC clocks are within 4 seconds of each
other and 51 seconds of atomic time.
05/04/2005 16:28 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/05/04
14:43:31
05/04/2005 16:27 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/05/04
13:32:10
05/04/2005 16:24 Darren
PSMFC recevied a message from Bill Spurgeon that the "A" side separator
gate was our of service yesterday from 12:12 to 12:52 hrs for some
service. It was also out of service today (5-4-05) from 14:15 to 15:45
for repairs.
05/04/2005 11:14 Dave
Updated database to LMJ05124.DB. PC clocks are within 4 seconds of each
other and 44 seconds of atomic time.
05/03/2005 09:54 Dave
Updated database to LMJ05123.DB. PC clocks are within 3 seconds of each
other and 40 seconds of atomic time.
05/03/2005 09:53 Dave
Updated database to LMJ05123.DB. PC clocks are within 3 seconds of each
other and 40 seconds of atomic time.
05/03/2005 08:17 troy@ree
B2:TestTagFailure,B3:ReaderReset,B4:InputSyncDetect,B4:InputSyncLost:
These alarms were caused by PSMFC personnel during a site GMC.
05/02/2005 15:40 Troy
A site GMC was performed today. All transceivers were checked for tune.
There is a problem between B2 and B3. This will have to be fixed on the
next site visit as the sync in or sync out of one or the other is
malfunctioning. They are both still reading tags.
Made several attempts to improve A Gate. The piston does not pivot freely
and I was unable to determine why. I decreased the delay op of both A and
B gates as fish were being missed. The gate times and stick test results
are as follows.
A B
PSI 105 95
Delay Op 20 15
Trvl Open 28 34
Time Open 115 110
Trvl Close 30 31
A1 31 of 31
A2 31 of 31
A3 31 of 31
A4 31 of 31 (thought I missed counted, I was wrong)
31 30 of 31
32 31 of 31`
33 31 of 31
B1 30 of 30
B2 30 of 30
B3 29 of 30
B4 30 of 30
41 30 of 30
42 30 of 30
43 30 of 30
05/02/2005 09:28 Dave
Updated database to LMJ05122.DB. PC clocks are within 3 seconds of each
other and 37 seconds of atomic time.
05/01/2005 09:29 troy@ree
51:ReaderReset,52:InputSyncDetect,52:InputSyncLost: Random reader reset.
05/01/2005 07:55 Dave
Updated database to LMJ05121.DB. PC clocks are within 3 seconds of each
other and 34 seconds of atomic time.
04/30/2005 09:19 Dave
Updated database to LMJ05120.DB. PC clocks are within 2 seconds of each
other and 29 seconds of atomic time.
04/29/2005 09:31 Dave
Updated database to LMJ05119.DB. PC clocks are within 2 seconds of each
other and 27 seconds of atomic time.
04/28/2005 13:48 Darren
A message from Bill Spurgeon was received this morning about the "B" side
diversion slide gate slamming shut. When I arrived the gate sounded and
operated normally. I made a few adjustments to the air relief snubbers and
tested the gate with 20 sticks. It may have been the case that there was
debris lodged into the gate track and that it fallen out. I also performed
a site GMC and tested the "A" side diversion gate with 20 sticks. All the
timing and diversions were correct. I also validated the site for the SGL
firmware update.
04/28/2005 10:07 Dave
Updated database to LMJ05118.DB. PC clocks are within 2 seconds of each
other and 24 seconds of atomic time.
04/26/2005 09:21 Dave
Updated database to LMJ05116.DB. PC clocks are within 1 second of each
other and 16 seconds of atomic time.
04/25/2005 10:50 Dave
Updated database to LMJ05115.DB. PC clocks are within 1 second of each
other and 14 seconds of atomic time.
04/24/2005 08:15 Dave
Updated database to LMJ05114.DB. PC clocks are within 1 second of each
other and 9 seconds of atomic time.
04/23/2005 08:45 Dave
Yesterday I updated the database to LMJ05112.DB. Today I updated the
database to LMJ05113.DB. The PC clocks are within 1 second of each other
and 7 seconds of atomic time.
04/21/2005 16:03 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/04/21 14:44:41
04/21/2005 16:03 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/04/21 14:40:17
04/21/2005 16:03 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/04/21 14:31:52
04/21/2005 16:03 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/04/21 14:29:44
04/21/2005 10:35 Dave
I managed to lock up trusty ol' WinCmd (4.5) today, while FTP'ing the
current database to LMJ-PC2. First time I can recall that this has ever
happened on any machine, local or remote. John showed me how to access
'taskman' from a command prompt, and I was able to kill one of the two
WinCmd processes that were running, but I couldn't terminate the parent
app. Fortunately, I had complete access to MultiMon, which was running
just fine. I closed the current data file and exited normally from
MultiMon, and then remotely rebooted the machine. When the machine came
back up, I was able to invoke WinCmd without any problems, deleted the
partial download, completed a new FTP session and transferred the new DB
file without incident. Everything worked out OK. No data were lost.
LMJ-PC1 had complete control of the gates during this snafu. There was
some clock drift when I rebooted, so I took this opportunity to synch both
LMJ clocks to atomic time.
04/21/2005 10:25 Dave
Updated database to LMJ05111.DB. Reset PC clocks to within 1 second of
each other and atomic time.
04/20/2005 09:54 Dave
Updated database to LMJ05110.DB. PC clocks are within 2 seconds of each
other and 11 seconds of atomic time.
04/19/2005 12:01 Dave
Updated database to LMJ05109.DB. PC clocks are within 1 second of each
other and 10 seconds of atomic time.
04/19/2005 10:41 alan@ruf
11:RocketPortNoEOT,13:RocketPortNoEOT,21:RocketPortNoEOT,22:RocketPortNoEO
T,23:RocketPortNoEOT,31:RocketPortNoEOT,32:RocketPortNoEOT,33:RocketPortNo
EOT,81:RocketPortNoEOT,82:RocketPortNoEOT: No apparent reason for
these alarms, possibly a glitch in the power. PTAGIS Field Operations will
continue to monitor.
04/18/2005 11:02 Dave
Updated database to LMJ05108.DB. PC clocks are within 1 second of each
other and 6 seconds of atomic time.
04/17/2005 12:21 Dave
Updated database to LMJ05107.DB. PC clocks are within 1 second of each
other and 3 seconds of atomic time.
04/16/2005 10:31 Dave
Updated database to LMJ05106.DB. Reset PC clocks to within 1 second of
each other and atomic time.
04/15/2005 10:27 Dave
Updated database to LMJ05105.DB. This version automatically includes the
new 200 SGL tag codes assigned equally to AC-254 and AC-255. Also updated
LMJ-GEN.DB on both machines and WATCH.TAG on PC2. PC clocks are within 3
seconds of each other and 27 seconds of atomic time.
04/14/2005 09:11 Dave
Updated database to LMJ05104.DB. PC clocks are within 3 seconds of each
other and 24 seconds of atomic time.
04/13/2005 11:24 Dave
Updated database to LMJ05103.DB. PC clocks are within 3 seconds of each
other and 21 seconds of atomic time.
04/13/2005 08:09 darren@r
43:InputSyncDetect,A1:RocketPortNoEOT,A2:RocketPortNoEOT,B2:InputSyncDetec
t,B2:ReaderReset,B3:InputSyncDetect,B3:InputSyncLost,B3:ReaderReset,B4:Bad
OscFreq,B4:InputSyncDetect,B4:InputSyncLost,B4:LowExcCurrent: The alarms
on the "B" Separator Gate antennas were generated by PSMFC personnel while
performing site maintenance. PSMFC will keep an eye on the No "E.O.T."
alarms as this indicates a possible communications error.
04/12/2005 14:13 Dave
Updated database to LMJ05102.DB. PC clocks are within 3 seconds of each
other and 18 seconds of atomic time.
04/12/2005 11:06 Troy
A site GMC was performed 04/12/05.
All transceivers were checked for tune. B2 and B3 had lost their sync,
turning off the trasceivers did not re-sync them. The sync cable between
B3 and B2 was exchanged with the sync cable between B3 and B4. All 4 are
now synced.
The loose flex that was disconnect last week was taped to the adjacent
flex. This monitor is still taking on water and most likely will until the
joint is fixed. The drain holes are clear and doing their job.
A and B gates were tested with 30 sticks. All sticks were diverted
correctly. The results of the stick test along with the new times are
posted below:
A1 30 of 30
A2 30 of 30
A3 30 of 30
A4 30 of 30
B1 30 of 30
B2 30 of 30
B3 30 of 30
B4 30 of 30
31 30 of 30
32 29 of 30
33 30 of 30
41 30 of 30
42 30 of 30
43 30 of 30
A B
PSI 95 95
Delay op 30 30
Trvl Open 29 34
Time Open 115 110
Trvl Close 31 33
No other problems were found. PC1 and PC2 are within 3 seconds of each
other.
04/11/2005 09:24 Alan_Bro
The following is quoted from my pitevent of 4/8/2005:
"With the help of site personnel, breakers 5, 8, and 9 at panel JR6 (PIT
Tag
room) were opened to disconnect the live circuits involved from 14:08 to
14:16. Collaterally, transceivers 11, 12, 13, 21, 22, 23, 31, 32, 33, 81
and
82 were without power during that time."
An examination of the raw file shows that no fish were detected across the
separators (which were still active) and thus no fish data was lost during
the repair effort.
04/11/2005 08:51 Dave
Updated database to LMJ05101.DB. PC clocks are within 2 seconds of each
other and 14 seconds of atomic time.
04/09/2005 08:55 scottl@r
01:ReaderReset,02:InputSyncDetect,02:ReaderReset,11:ReaderReset,12:InputSy
ncDetect,12:ReaderReset,13:InputSyncDetect,13:InputSyncLost,13:ReaderReset
,21:ReaderReset,22:InputSyncDetect,22:ReaderReset,23:InputSyncDetect,23:In
putSyncLost,23:ReaderReset,31:ReaderReset,32:InputSyncDetect,32:ReaderRese
t,33:InputSyncDetect,33:InputSyncLost,33:ReaderReset,41:ReaderReset,42:Inp
utSyncDetect,42:ReaderReset,43:InputSyncDetect,43:InputSyncLost,43:ReaderR
eset,51:ReaderReset,52:InputSyncDetect,52:ReaderReset,81:ReaderReset,82:In
putSyncDetect,82:ReaderReset,91:ReaderReset,92:InputSyncDetect,92:ReaderRe
set,93:InputSyncDetect,93:InputSyncLost,93:ReaderReset,A1:ReaderReset,A2:I
nputSyncDetect,A2:ReaderReset,A3:InputSyncDetect,A3:InputSyncLost,A3:Reade
rReset,A4:InputSyncDetect,A4:InputSyncLost,A4:ReaderReset,B1:ReaderReset,B
2:InputSyncDetect,B2:ReaderReset,B3:InputSyncDetect,B3:InputSyncLost,B3:Re
aderReset,B4:InputSyncDetect,B4:InputSyncLost,B4:ReaderReset: These alarms
are believed to caused by !
PSMFC while trying to isolate which breaker controls power to the raceway
river exit monitor. Repairs were being made to a leaky monitor.
04/08/2005 16:45 Alan_Bro
The abandoned monitor just downstream from the A river exit (81 and 82)
has a leak where the monitor and the raceway meet at the downstream end.
The silicon caulking worked it's way into the path of fish and was removed
by site personnel, thus causing the leak. The abandoned monitor took on
water which ran down the flexible conduit into the abandoned 30x30. The
water from the 30x30 filled the rigid conduits that carry power from a
pull box, also putting water into that pull box. The water then filled two
other power conduits.
The flexible conduit was disconnected at the abandoned monitor, removing
the water source. With the help of site personnel, breakers 5, 8, and 9 at
panel JR6 (PIT Tag room) were opened to disconnect the live circuits
involved from 14:08 to 14:16. Collaterally, transceivers 11, 12, 13, 21,
22, 23, 31, 32, 33, 81 and 82 were without power during that time. The
rigid conduits were vacuumed dry and all other water was removed.
We will contact the site bio next week about the disposition of the still
leaking waterway. PIT Tag equipment is currently out of harm's way.
A GMC was performed. All transceivers were tuned.
The air pressure is currently 98psi.
The A and B separators as well as the A and B racewayswere tested with 23
sticks each, results following:
A1 23/23
A2 23/23
A3 23/23
A4 23/23
B1 23/23
B2 23/23
B3 23/23
B4 23/23
31 23/23
32 22/23
33 23/23
41 23/23
42 23/23
43 23/23
11 23/23
12 23/23
13 22/23
21 23/23
22 22/23
23 23/23
All sticks diverted properly.
The v5.0 transceiver firmware was verified on all transceivers.
No other problems found.
04/08/2005 14:32 Dave
Updated database to LMJ05098.DB. Revised FTP link within WinCmd to
reflect the new directory structure on our FTP server. PC clocks are
within 1 second of each other and 4 seconds of atomic time.
04/07/2005 12:45 Dave
Had not been able to connect to LMJ-PC2 since Monday. I contacted Monty
Price, who rebooted LMJ-PC2. This re-established pcA connectivity. I
updated the database to LMJ05097.DB on both machines. I reset the PC
clocks to within 1 second of each other and atomic time.
04/05/2005 08:56 Dave
Updated database to LMJ05095.DB on PC1 only. I could not establish a
remote connection to PC2. The PC1 clock is within 12 seconds of atomic
time.
04/04/2005 12:02 Dave
I submitted a mortality event in tag file DPM05091.LMN to "account" for a
single PIT tag detected during initial water-up of the LMN JFF.
04/04/2005 11:49 Carter_S
-------- Original Message -------- Subject: Start
up at Lower Monumental Dam Date: Mon, 04 Apr 2005
11:01:19 -0700 From: SharonL@direcway.com
To: dave.f.hurson@nww01.usace.army.mil,
john.c.bailey@usace.army.mil, rex.d.baxter@usace.army.mil,
hfranzoni@fpc.org, carters@psmfc.org, Dave.Marvin@ptagis.org,
cfwdfw@aol.com, lort@critfc.org, Christine.Mallette@dfw.state.or.us,
paul.wagner@noaa.gov, rudd.a.turner@usace.army.mil, pkeniry@eou.edu,
tberggren@fpc.org, jmccann@fpc.org, dwood@fpc.org, smp@fpc.org,
woodirmw@dfw.wa.gov, eastejae@dfw.wa.gov, Bartlhrb@dfw.wa.gov,
tudorrl@direcway.com, mark.f.plummer@usace.army.mil, lgrsmp@direcway.com,
lgrtask@direcway.com, lgrsmolt@direcway.com, hoffaph@bossig.com,
kafodrea@bpa.gov, SharonL@direcway.com
The Lower Monumental Dam Juvenile Fish Facility JFF started fish
collection for the 2005 season at 0700 on Friday April 1. The first
sample was taken at 0700 on Saturday April 2, and the first truck left on
Sunday April 3. Because there was no data taken during last week's
report period, the first weekly report will be going out next week. Have
a good year ! Sharon Lind begin:vcard fn:Carter Stein
n:Stein;Carter org:Pacific States Marine Fisheries Commission;PTAGIS and
Columbia Basin Projects adr:Ste. 100;;205 SE Spokane
St.;Portland;OR;97202-6413;USA email;internet:carters@psmfc.org
title:Program Manager tel;work:503.595.3116 tel;fax:503.595.3232
tel;cell:503.709.6174 x-mozilla-html:TRUE
url:http://test.ptagis.org/ptagis/ version:2.1 end:vcard
04/04/2005 09:58 Dave
Updated database to LMJ05094.DB. PC clocks are within 3 seconds of each
other and 12 seconds of atomic time.
04/04/2005 08:40 darren@r
82:RocketPortNoEOT: This alarm may have been caused the high volume of
through put that was taking place during the timer tag on antenna 82
firing. The tag code was received but the message to fire the timer tag
did not appear. The "raw" file indicates several activities happening at
one time. PSMFC has been cloely monitroing the communications for
rocketport failures but this does not appear to a fialure from the
electronics. We (PSMFC) will monitor for future failures of this nature.
04/03/2005 11:10 Dave
I pcA'd in and stopped, and then immediately restarted, MultiMon, to
adjust the file creation times on both PCs. These had been shifted
forward an hour due to Daylight Savings Time. Stopping and restarting
data collection will reset the creation times to 03:00, 06:00, 09:00, and
12:00. This is a documented phenomenon with the MultiMon software. I
pushed the outstanding file from PC1 to the PTAGIS server. I did not
adjust the PC clocks.
04/02/2005 08:46 Dave
Sharon Lind confirmed that the Lower Monumental Juvenile Collection
Facility began collecting fish at 7:00 AM on April 1, 2005.
04/01/2005 11:25 Darren
A preseason GMC was performed 4/1/2005. All transceivers were tuned.
Multimon was exited and restarted to re-enable PCA. File LMJ05091.205 was
submitted from PC2 to fill the gap created durin PC1's downtime.
The air pressure is currently 99psi on both A and B gate. Current gate
time settings are:
Gate A
Delay Op 30
Travel Open 18
Time Open 115
Travel close 31
Gate B
Delay Op 30
Travel Open 34
Time Open 110
Travel close 31
The A separator was tested with 40 sticks and the B separator was tested
with 40 sticks. The A and B raceways were sticktested with 40 sticks each,
results following:
A1 40/40
A2 40/40
A3 40/40
A4 40/40
B1 40/40
B2 40/40
B3 40/40
B4 39/40
31 40/40
32 40/40
33 40/40
41 40/40
42 40/40
43 40/40
11 40/40
12 39/40
13 39/40
21 40/40
22 39/40
23 39/40
81 40/40
82 40/40
01 40/40
02 40/40
All sticks diverted properly. No problems found.
04/01/2005 10:03 Dave
I installed the season's first SbyC production map (LMJ05090.MAP) and
database (LMJ05091.DB) files. I reset both PC clocks to within two
seconds of atomic time. This site is configured for the following SbyC
activity:
CSS: Two-thirds of first detections (AC11-16) to be routed to the raceways
for transport; all fish previously-detected upstream (AC21-26) to be
returned to the river.
NPT stocks, Stanley Basin sockeye, Grande Ronde Basin steelhead, and
Touchet and Tucannon river steelhead - All of the fish in these groups
(AC42-45, AC46, AC49, and AC47, respectively) will be routed to the
raceways for transport.
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/04/01 07:07:07
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/04/01 07:06:14
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/04/01 07:06:12
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/04/01 07:04:18
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/04/01 07:04:16
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'CLOSED' to 'OPEN' at
2005/04/01 07:03:48
04/01/2005 09:05 DGE_Robo
PrimaryBypass (PrimaryBypass) changed from 'OPEN' to 'CLOSED' at
2005/04/01 07:03:25
04/01/2005 09:02 Dave
I updated etc/sites and modified the alert notification to include
Portland as well as Kennewick PTAGIS staff.
03/31/2005 18:06 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/03/31
17:28:05
03/31/2005 18:06 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/03/31
17:28:04
03/31/2005 12:03 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/03/31
09:05:43
03/31/2005 12:03 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/03/31
09:05:42
03/31/2005 12:03 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/03/31
09:05:42
03/31/2005 12:03 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/03/31
09:05:41
03/31/2005 08:45 Scott_Li
An In/Pre-Season site visit was conducted by Dave and Scott in order to
ensure that the interrogation platforms were set to their base
configuration
prior to the peak out-migration period. Most sites had already been reset
but were revisited anyway in order to go over some the SByC activities and
mild changes to the base configuration files.
03/31/2005 08:32 Scott_Li
Pre-season site visit by Dave and Scott.. Archived previous year's data
files. Downloaded
current generic db files from PTAGIS FTP server. Reset map and db files
to generic defaults. Reset counters. Synchronized both PC clocks to
within 1 second of atomic time. The gap in the data set for 3/29/05 was
due
to to this event. No fish in the system at this time.
03/28/2005 18:11 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/03/28
17:52:24
03/28/2005 18:11 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/03/28
17:52:24
03/28/2005 18:10 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/03/28
16:29:49
03/28/2005 18:10 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/03/28
16:29:48
03/28/2005 18:10 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/03/28
16:29:25
03/28/2005 18:10 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/03/28
16:29:25
03/28/2005 18:10 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/03/28
16:28:50
03/28/2005 18:10 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/03/28
16:28:49
03/28/2005 12:06 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/03/28
10:07:21
03/28/2005 12:06 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/03/28
10:07:21
03/28/2005 12:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/03/28
10:06:59
03/28/2005 12:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/03/28
10:06:59
03/28/2005 12:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/03/28 10:06:59
03/28/2005 12:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/03/28 10:06:59
03/22/2005 18:07 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'OFF' to 'ON' at 2005/03/22
15:35:57
03/22/2005 18:06 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'OFF' to 'ON' at 2005/03/22
15:35:57
03/22/2005 18:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/03/22 15:34:20
03/22/2005 18:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/03/22 15:34:19
03/22/2005 18:06 DGE_Robo
B_DivertDuringSample (B_DDSample) changed from 'ON' to 'OFF' at 2005/03/22
15:34:14
03/22/2005 18:06 DGE_Robo
A_DivertDuringSample (A_DDSample) changed from 'ON' to 'OFF' at 2005/03/22
15:34:14
03/22/2005 18:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/03/22 15:34:09
03/22/2005 18:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/03/22 15:34:08
03/22/2005 18:06 DGE_Robo
B_Sample_100% (B_S100) changed from 'OFF' to 'ON' at 2005/03/22 15:33:43
03/22/2005 18:06 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'ON' to 'OFF' at 2005/03/22
15:33:43
03/22/2005 18:06 DGE_Robo
A_Sample_100% (A_S100) changed from 'OFF' to 'ON' at 2005/03/22 15:33:42
03/22/2005 18:06 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'ON' to 'OFF' at 2005/03/22
15:33:42
03/17/2005 15:04 DGE_Robo
A_SampleGateBypass (A_SBypass) changed from 'OFF' to 'ON' at 2005/03/17
12:49:19
03/17/2005 15:04 DGE_Robo
A_Sample_100% (A_S100) changed from 'ON' to 'OFF' at 2005/03/17 12:49:18
03/17/2005 15:04 DGE_Robo
B_SampleGateBypass (B_SBypass) changed from 'OFF' to 'ON' at 2005/03/17
12:49:17
03/17/2005 15:04 DGE_Robo
B_Sample_100% (B_S100) changed from 'ON' to 'OFF' at 2005/03/17 12:49:17
03/08/2005 08:14 Alan_Bro
All transceivers were flashed with version 5.0 firmware 3-7-2005.
03/08/2005 08:06 troy@ree
01:ReaderReset,01:TestTagFailure,02:InputSyncDetect,02:InputSyncLost,02:Re
aderReset,11:ReaderReset,11:TestTagFailure,12:InputSyncDetect,12:InputSync
Lost,12:ReaderReset,12:TestTagFailure,13:InputSyncDetect,13:InputSyncLost,
13:ReaderReset,13:TestTagFailure,21:ReaderReset,22:InputSyncDetect,22:Inpu
tSyncLost,22:ReaderReset,22:TestTagFailure,23:InputSyncDetect,23:InputSync
Lost,23:ReaderReset,31:ReaderReset,31:TestTagFailure,32:InputSyncDetect,32
:InputSyncLost,32:ReaderReset,33:InputSyncDetect,33:InputSyncLost,33:Reade
rReset,33:TestTagFailure,41:ReaderReset,41:TestTagFailure,42:InputSyncDete
ct,42:InputSyncLost,42:ReaderReset,42:TestTagFailure,43:InputSyncDetect,43
:InputSyncLost,43:ReaderReset,43:TestTagFailure,51:ReaderReset,51:TestTagF
ailure,52:InputSyncDetect,52:InputSyncLost,52:ReaderReset,52:TestTagFailur
e,81:ReaderReset,82:InputSyncDetect,82:InputSyncLost,82:ReaderReset,82:Tes
tTagFailure,91:ReaderReset,91:TestTagFailure,92:InputSyncDetect,92:InputSy
ncLost,92:ReaderReset,92:Te!
stTagFailure,93:InputSyncDetect,93:InputSyncLost,93:ReaderReset,93:TestTag
Failure,A1:ReaderReset,A1:TestTagFailure,A2:InputSyncDetect,A2:InputSyncLo
st,A2:ReaderReset,A2:TestTagFailure,A3:InputSyncDetect,A3:InputSyncLost,A3
:ReaderReset,A4:InputSyncDetect,A4:InputSyncLost,A4:ReaderReset,A4:TestTag
Failure,B1:ReaderReset,B1:TestTagFailure,B2:InputSyncDetect,B2:InputSyncLo
st,B2:ReaderReset,B2:TestTagFailure,B3:InputSyncDetect,B3:InputSyncLost,B3
:ReaderReset,B3:TestTagFailure,B4:InputSyncDetect,B4:InputSyncLost,B4:Read
erReset,B4:TestTagFailure: These alarms are during a software version
upgrade.
03/02/2005 09:35 dlwarf@r
41:ReaderReset,42:InputSyncDetect,42:InputSyncLost: Common reader
reset.
01/31/2005 11:12 Dave
The 2004 MultiMon operational configuration files have been archived on the
PTAGIS FTP server: ftp.ptagis.org/multimon/Site_Configurations/2004-Config.
####End of Event Log for LMJ###