EVENT LOG FOR SITE LTP The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 06/07/2012 11:17 Kraig Interrogation event log for the Twisp Pond Acclimation Site (LTP)-2012 release Installation of the PIT tag interrogation system (Upstream Antenna, 01) for the Lower Twisp Ponds began on April 9, 2012 at 07:00 hrs. This detection system was located approximately 3 meters downstream from the outlet of the pond. A total of 5 files were downloaded. This detection system was pulled from the channel on June 7, 2012 at 07:25 hrs, after 3 days of zero tag detections and a snorkel survey to confirm site as void of juvenile coho. Detection system (Middle Antenna, 02) was placed in the channel and started interrogation on May 4, 2012 at 09:49 hrs. This system was located 3 meters downstream from the uppermost antenna (01). A total of 4 files were downloaded. This detection system was pulled from the channel on June 7, 2012 at 07:25 hrs, after 3 days of zero tag detections and a snorkel survey to confirm site as void of juvenile coho. Detection system (Downstream Antenna, 03) was placed in the channel and started interrogation on May 8, 2012 at 16:02 hrs. A total of 3 files were downloaded. Detection system (03) was taken out on June 7, 2012 at 07:25 hrs., after 3 days of zero tag detections and a snorkel survey to confirm site as void of juvenile coho. 01/01/2012 00:00 PTOC_Bot Annual log file initiation for LTP #### End of Event Log for LTP ###