EVENT LOG FOR SITE MC2 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/31/2009 09:10 Troy@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/30/2009 07:34 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/29/2009 07:31 Alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/29/2009 07:16 Troy Manually pushed the delinquent file. 12/27/2009 08:53 darren@b 07:TestTagFailure: This alarm will be addressed during the next site visit. 12/26/2009 09:04 darren@b 07:TestTagFailure: This alarm is on a known problematic system. 12/25/2009 08:13 darren@b 07:TestTagFailure: This alarm is on a known problematic system. 12/24/2009 08:19 troy@bay 07:TestTagFailure: Noted 12/21/2009 07:23 Scott_Li Per Brad Eby, the ladder went back into service on Dec. 17th 09 at 1430 hrs 12/19/2009 08:51 Troy@bay 07:TestTagFailure,0B:LowExcCurrent,0D:TestTagFailure,0E:TestTagFailure,13: LowExcCurrent: 07 is a known problematic system, the rest of the alarms are most likely due to the site watering back up. 12/17/2009 07:52 troy@bay 07:TestTagFailure,0B:LowExcCurrent,0C:LowExcCurrent,0D:TestTagFailure,0E:T estTagFailure,13:LowExcCurrent: These alarms occured while the ladder was de-watered. PSMFC personnel are in the process of confirming that the ladder is back in service. 12/10/2009 13:06 Darren PSMFC confirmed today that the ladder was de-watered yesterday around 14:40. The site status page has been updated. The ladder will only be out of service until early next week. 12/10/2009 07:23 darren@b 05:LowExcCurrent,07:TestTagFailure,0A:Overrun,0B:LowExcCurrent,0C:LowExcCu rrent,0D:TestTagFailure,0F:LowExcCurrent,10:LowExcCurrent,13:LowExcCurrent : This ladder was scheduled to be de-watered yesterday for winter maintenance. It appears that this has happened. PSMFC will get the confirmation from the site Biologist Brad Eby and post the time to the event log. 12/09/2009 07:43 darren@b 07:TestTagFailure: Alarm on known problematic system. 12/08/2009 08:11 darren@b 07:TestTagFailure: This alarm is on known problematic system. 12/07/2009 16:27 Darren The ladder was taken to orifice flow yesterday (12-6-09) in the early afternoon. I confirmed with Brad Eby that it will remain in this operational state until tomorrow afternoon at which time it will be de-watered for winter maintenance. 12/07/2009 08:22 darren@b 07:TestTagFailure: Failures on known problematic system. 12/06/2009 07:38 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/05/2009 07:07 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/04/2009 07:34 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/03/2009 07:38 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 12/02/2009 08:50 alan@bay 05:TestTagFailure,07:TestTagFailure: Clearing TASS on known problematic 07, no apparent reason for the 2 TT alarms on 05. PTAGIS Field Operations will continue to monitor. 11/24/2009 07:02 scottl@b 05:TestTagFailure,07:TestTagFailure: Noted 11/23/2009 13:28 scottl Performed site GMC, all transceivers were re tuned and calibrated as necessary, no problems to report. FYI that the elevator has been repaired! 11/23/2009 10:18 Don_Warf DLW email test _____________________________________________ From: Don Warf Sent: Monday, November 23, 2009 9:26 AM To: 'pitevent@psmfc.org'; 'pitevent@ptagis.org' Subject: gra,grj,goj,rpj,lmj,ich,mcj,mc1,mc2,jdj,pro,esj,jcj,cfj,bcc,bo1,bo2,bo3,b2 j,rzf Email test 11/23/2009 09:39 Troy_Hum Email Test from Troy 11/22/2009 07:16 alan@bay 05:TestTagFailure,07:TestTagFailure: Noted 11/21/2009 07:20 alan@bay 05:TestTagFailure,07:TestTagFailure: These alarms will be investigated during the next site visit. 11/19/2009 08:01 alan@bay 05:TestTagFailure,07:TestTagFailure: 07 is a known problematic system. 05 will be addressed on the next site visit. 11/17/2009 07:27 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 11/16/2009 08:01 alan@bay 07:TestTagFailure: 07:TestTagFailure: Clearing TASS on a known problematic system. 11/16/2009 08:01 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 11/15/2009 09:21 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 11/14/2009 07:54 troy@bay 05:TestTagFailure,07:TestTagFailure: 07 is a known problematic system. 05 will be addressed on the next site visit. 11/13/2009 07:26 troy@bay 05:TestTagFailure,07:TestTagFailure: These alarms will be addressed on the next site visit. 11/12/2009 08:25 troy@bay 05:TestTagFailure,07:TestTagFailure: 05 will be addressed on the next site visit. 07 is a known problematic system. 11/11/2009 09:10 troy@bay 05:TestTagFailure,07:TestTagFailure,08:TestTagFailure: 07 is a known problematic system. The VTT was turned back on to 08. 05's tune my be drifting due to temperature. PSMFC will continue to monitor. 11/10/2009 14:07 Troy The VTT on 08 was found to be in the OFF position. Returned to the ON position. Voltage to Neutral to Ground .074VAC. The 'Building Wiring Fault' light on the back of the UPS's is NOT on. 11/10/2009 07:19 troy@bay 08:TestTagFailure: The transceiver looks to be in good health from the viewing the exciter report. The VTT may be off or bad. PSMFC will investigate on the next site visit. 11/09/2009 08:04 troy@bay 05:TestTagFailure,07:TestTagFailure,08:TestTagFailure: 07 is a known probematic system. 05 and 08 will be investigated on the next site visit. 11/01/2009 07:48 darren@b 05:TestTagFailure,07:TestTagFailure,08:TestTagFailure: The alarms on the 05 and 08 systems will be addressed during the next site visit. The alarm on 07 is on a known problematic system. 10/31/2009 08:57 darren@b 07:TestTagFailure: Alarm on a known problematic system. 10/31/2009 08:56 darren@b 05:TestTagFailure: There is no direct cause for this failure. It will be addressed during the next site visit. 10/31/2009 08:52 darren@b 08:TestTagFailure: This system may have the timer tag accidentally turned off. This will be verified and corrected at a later date. The system is detecting PIT-tags. 10/30/2009 08:31 alan@bay 05:TestTagFailure,07:TestTagFailure,08:TestTagFailure: These alarms were caused by issues previously documented. 10/27/2009 08:11 alan@bay 07:TestTagFailure,08:TestTagFailure: 07 is a known issue, 08 will be addressed during the next site visit. 10/26/2009 08:20 Alan Transceiver 08 appears to be in tune and is reading PIT tags well. Most likely the TT switch is in the off position, but there could be an issue with the VTT board. This will be remedied during the next site visit. 10/26/2009 07:58 darren@b 08:TestTagFailure: There is no direct cause for this failure. The detection system has been slightly degraded over time but has been reading the timer tag and PITtags with good efficiencies. PSMFC will investigate this during the next site visit. 10/26/2009 07:54 darren@b 07:TestTagFailure: Alarm on known problematic system. 10/26/2009 07:52 darren@b 05:TestTagFailure: There is no direct cause for this alarm. The detection system does not show signs of degredation. PSMFC will investigated during the next site visit. 10/22/2009 07:16 scottl@b 08:LowExcCurrent,08:TestTagFailure: A GMC was performed yesterday, clearing TASS. 10/21/2009 11:19 Alan A GMC was performed 10-21-2009. All transceivers were checked and tuned as necessary. Outstanding files on PC2 were archived. The clocks on both PCs are within one second of atomic time, no problems found. 10/21/2009 07:46 troy@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 10/20/2009 07:46 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 10/18/2009 08:19 alan@bay 07:TestTagFailure: Noted. 10/17/2009 09:33 alan@bay 07:TestTagFailure: Noted 10/16/2009 08:11 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 10/15/2009 13:50 Alan Eastern Oregon Telecom reports a problem with their equipment. The resultant connectivity issue is causing file uploads to fail. PTAGIS Field Operations will continue to monitor. 10/15/2009 08:07 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 10/14/2009 13:47 alan@bay 07:TestTagFailure: Noted. 10/11/2009 09:24 darren@b 07:TestTagFailure: Alarm on known problematic system. 10/10/2009 08:43 darren@b 07:Overrun,07:TestTagFailure: Alarm on known problematic system. 10/10/2009 08:40 darren@b 05:TestTagFailure: No direct cause fro these alarms. They will be investigated during the next site visit. 10/08/2009 08:01 alan@bay 05:TestTagFailure,07:TestTagFailure: No apparent reason for the 2 alarms on 05. PTAGIS Field Operations will continue to monitor. Clearing TASS on the known problematic system 07. 10/07/2009 07:25 darren@b 07:TestTagFailure: Alarm on known problematic system. 10/06/2009 07:55 darren@b 07:TestTagFailure: Alarm on known problematic system. 10/05/2009 08:19 darren@b 05:TestTagFailure,07:TestTagFailure: The alarms on 07 are on a known problematic system. The alarms on 05 will be investigated during the next site visit. 10/04/2009 09:38 troy@bay 07:Overrun,07:TestTagFailure: Known problematic system, clearing TASS. 10/02/2009 07:55 darren@b 07:TestTagFailure: Alarm on known problematic system. 10/01/2009 08:07 darren@b 07:TestTagFailure: Alarm noted on problematic system. 09/30/2009 07:44 alan@bay 05:TestTagFailure,07:Overrun,07:TestTagFailure: These alarms will be investigated during the next site visit. 09/27/2009 07:58 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 09/26/2009 07:49 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 09/25/2009 23:28 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 09/23/2009 09:01 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 09/22/2009 07:54 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 09/21/2009 07:59 alan@bay 07:Overrun,07:TestTagFailure: Clearing TASS on a known problematic system. 09/09/2009 07:48 darren@b 07:TestTagFailure: Alarm on known problematic system. 09/07/2009 08:59 darren@b 07:TestTagFailure: Alarm on a known problematic system. 09/06/2009 08:18 darren@b 07:TestTagFailure: alarm on known problematic system. 09/05/2009 08:16 darren@b 07:TestTagFailure: Alarm on known problematic system. 09/04/2009 07:25 darren@b 07:Overrun,07:TestTagFailure: Alarms on a known problematic system. 09/03/2009 10:20 Don_Warf Manually pushed late file. 09/02/2009 15:43 scottl Performed site GMC, all transceivers were retuned and calibrated as necessary, no problems to report. 09/02/2009 14:31 scottl All PTAGIS data collection computers and utility pc's were reconfigured and put on the new wireless network that separates PTAGIS PC's from the USACE network. All equipment e.g., switches, converters etc.. that were used on the USACE network were left in place in the event that we needed to revert back to COE network for whatever reason. PCA sessions were tested at each site , in particular MCJ SBC PC's and seemed to perform well. More thorough testing will be done in the next few weeks. 09/02/2009 07:17 darren@b 07:TestTagFailure: Alarm on problematic system. 09/01/2009 07:09 darren@b 07:TestTagFailure: Alarm on problematic system. 08/31/2009 07:57 darren@b 07:TestTagFailure: Alarm on problematic system. 08/25/2009 07:56 troy@bay 07:TestTagFailure: Clearing TASS on known problematic system. 08/24/2009 08:44 troy@bay 07:TestTagFailure: Clearing TASS on known problematic system 08/23/2009 08:28 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/22/2009 07:48 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/21/2009 07:50 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/20/2009 12:15 Darren A site GMC was performed today 8-20-09. All transceivers were checked and adjusted for tuning, noise, and detectability. No problems were discovered during this visit. 08/20/2009 07:59 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/19/2009 07:56 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/18/2009 07:38 alan@bay 07:Overrun,07:TestTagFailure: Clearing TASS on a known problematic system. 08/17/2009 11:05 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/16/2009 10:50 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/15/2009 10:16 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/13/2009 07:45 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/12/2009 07:56 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/11/2009 07:45 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/10/2009 07:46 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 08/09/2009 09:07 darren@b 05:TestTagFailure,07:TestTagFailure: The alarms on antenna 07 are on a known problematic system. The failure on 05 will be investigated during the next site visit. 08/08/2009 08:52 darren@b 07:TestTagFailure: This alarm is on a known problematic system. 08/06/2009 13:30 scottl Performed site GMC, all transceivers were retuned and calibrated as necessary, no problems to report. 08/04/2009 07:26 darren@b 07:TestTagFailure: Alarm on problematic system. 08/03/2009 08:12 alan@bay 07:Overrun,07:TestTagFailure: Clearing TASS on a known problematic system. 07/26/2009 09:15 darren@b 07:TestTagFailure: Alarm is on a problematic system 07/25/2009 09:32 darren@b 07:TestTagFailure: Alarm on known problematic system. 07/23/2009 14:18 Alan A GMC was performed 7/23/2009. All transceivers were checked and tuned as necessary. The files on PC2 were archived. The clocks on both PCs were set to within one second of atomic time. No undocumented problems found. 07/23/2009 10:21 darren@b 07:TestTagFailure: Failures are on a known problematic system. 07/16/2009 09:07 darren@b 07:TestTagFailure: Alarm on known problematic system. 07/15/2009 11:56 scottl Performed site GMC, all transceivers were retuned and calibrated as necessary, no problems to report. 07/10/2009 13:38 Troy A site GMC was performed 07/10/09. All transceivers were checked for tune and adjustments made where needed. Both PC's were set to within one second of atomic time and each other. The 'temp' directory was empty on PC1 and 1 file was removed from PC2's. No problems to report. 07/10/2009 09:06 darren@b 07:TestTagFailure: Alarm on known problematic system. 07/09/2009 09:15 darren@b 07:TestTagFailure: Alarm is on a known problematic system. 07/08/2009 08:15 darren@b 07:TestTagFailure: Alarm on problematic system. 07/07/2009 08:22 darren@b 07:TestTagFailure: Alarm on known problematic system. 07/07/2009 08:22 troy@bay 07:TestTagFailure: Clearing TASS on known problematic system. 07/06/2009 10:12 alan@bay 0E:LowExcCurrent: This transceiver is reading PIT tags well and appears in tune. The current was at 2.7A and threshold was set to 2700mA. The threshold was remotely lowered to 2400mA. This will be investigated during the next site visit. 07/06/2009 10:06 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 07/04/2009 09:10 troy@bay 0E:LowExcCurrent: The low exciter current will be monitored and adjusted if needed 07/02/2009 09:00 Alan Manually pushed MC209183.B1 to PTAGIS via PCA. 07/02/2009 08:57 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 07/01/2009 11:22 Darren A site GMC was performed today 7-1-09. All transceivers were checked for tuning, noise, and detectability and any necessary adjustments were made. No problems were discovered during this visit. 06/28/2009 08:29 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/27/2009 08:08 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/26/2009 08:37 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/25/2009 08:48 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/24/2009 11:38 Darren A site GMC was performed today 6-24-09. All transceivers were checked for tuning, noise, and detectability. No problems were discovered during this visit. 06/22/2009 09:10 alan@bay 07:Overrun: Clearing TASS on a known problematic system. 06/21/2009 08:46 darren@b 07:TestTagFailure: alarm is on a known problematic system. 06/20/2009 09:07 darren@b 07:TestTagFailure: Alarm on problematic system. 06/18/2009 12:50 Alan A GMC was performed 6/18/2009. All transceivers were checked and tuned as necessary. The files on PC2 were archived. The clocks on both PCs were set to within one second of atomic time. No undocumented problems found. 06/18/2009 08:11 darren@b 07:Overrun: Alarm on problematic system. 06/16/2009 07:59 darren@b 07:Overrun: Alarm occurred on a known problematic system. 06/15/2009 10:02 darren@b 07:TestTagFailure: Alarms are on a known problematic system. 06/09/2009 15:14 Alan A GMC was performed 6/9/2009. All transceivers were checked and tuned as necessary. The files on PC2 were archived. The clocks on both PCs were set to within one second of atomic time. No undocumented problems found. 06/08/2009 08:15 darren@b 07:TestTagFailure: These alarms are on a known problematic system. 06/07/2009 10:26 troy@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/06/2009 09:51 troy@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 06/06/2009 09:10 Troy Manually pushed the delinquent file. 06/02/2009 12:29 Darren A site GMC was performed today 6-2-09. All transceivers were checked fro tuning, noise and detectability. No problems were found. The corp fiber to the network cabinet is all terminated and the spares are the blu/org and red/blk. 06/02/2009 08:33 troy@bay 07:TestTagFailure: Noted 05/31/2009 09:41 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/30/2009 11:09 alan@bay 04:TestTagFailure,07:TestTagFailure: 07 has a documented issue. 04 was experiencing noise at the time of the timer tag firing, but is reading PIT tags well. 05/29/2009 08:47 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/28/2009 09:10 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/26/2009 13:20 Alan A GMC was performed 5/26/2009. All transceivers were checked and tuned as necessary. The files on PC2 were archived. The clocks on both PCs were set to within one second of atomic time. No undocumented problems found. 05/26/2009 09:37 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/22/2009 08:44 darren@b 04:TestTagFailure,07:TestTagFailure: Alarm on antenna system 07 are on a known problematic system. The alarm on antenna 04 will be investigated during the next site GMC. 05/20/2009 08:16 scottl@b 07:TestTagFailure: Noted 05/19/2009 11:32 scottl The dimmer switch in the counting room has been replaced with a straight on/off switch. As requested by the COE, the flouresent ballasting bulbs were put back into the sockets and no visible effects were observed on the transceivers therefore these bulbs will remain in place. Transceiver 01 is slightly noisy due to trash racks, 02 and 03 noise levels are quiet. All other transceivers were retuned and calibrated as necessary, no problems to report. 05/18/2009 09:50 darren@b 07:TestTagFailure: Alarm on problematic system. 05/17/2009 08:45 darren@b 07:TestTagFailure: Alarm on problematic system. 05/16/2009 08:07 darren@b 07:TestTagFailure: Alarms on a known problematic system. 05/15/2009 10:39 Don_Warf Manually pushed the last file. 05/15/2009 08:26 troy@bay 07:TestTagFailure: Clearing TASS on known problematic system. 05/14/2009 12:07 scott It was found that the power connector for the fiber to copper converter in the level 5 phone room had come loose. The connection was restored and the delenquent files were submitted. 05/12/2009 08:33 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/11/2009 08:49 darren@b 07:TestTagFailure: Alarm on problematic system. 05/10/2009 08:53 troy@bay 07:TestTagFailure: Known problem, clearing TASS. 05/09/2009 09:42 troy@bay 07:TestTagFailure: Known issue on problematic system, clearing TASS. 05/08/2009 09:14 troy@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/07/2009 09:54 alan@bay 01:LowExcCurrent: No apparent reason for this alarm. PTAGIS Field Operations will continue to monitor. 05/07/2009 09:52 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 05/06/2009 12:48 Darren A site GMC was performed today 5-6-09. All trnasceivers were checked fro tuning, noise, and detectability. No problems were discovered during this visit. 05/06/2009 08:44 darren@b 07:TestTagFailure: Alarm on problematic system. 05/04/2009 10:18 troy@bay 07:TestTagFailure: Noted 05/03/2009 08:25 darren@b 07:TestTagFailure: Alarm on problematic system. 05/02/2009 08:44 darren@b 07:TestTagFailure: Alarm on problematic system. 04/30/2009 07:44 darren@b 04:TestTagFailure,07:TestTagFailure: Alarm on problematic system. 04/29/2009 08:07 darren@b 07:TestTagFailure: Alarm on problematic system. 04/28/2009 08:24 darren@b 07:TestTagFailure: Alarms on known problematic system. 04/27/2009 16:17 Alan The site bio reports that the USACE network is having issues. The platforms have been verified to be collecting data. No ETA was mentioned for communications resolution. 04/27/2009 12:01 scottl Performed site GMC, all transcievers were retuned and calibrated as necessary, no unknown problems to report. 04/27/2009 09:47 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/26/2009 10:53 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/25/2009 11:10 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/24/2009 08:18 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/23/2009 10:47 darren@b 05:TestTagFailure,07:TestTagFailure: Alarms on problematic system. 04/23/2009 08:43 Darren Manually pushed the 09113.B1 files to PTAGIS. 04/22/2009 13:41 Alan A GMC was performed 4/22/2009. All transceivers were checked and tuned as necessary. Th counting window transceivers are noisy (01 15-20%, 02 30-40%, 03 20-30%) due to accumulations in the picketed leads. Site personnel have been notified. The files on PC2 were archived. The clocks on both PCs were set to within one second of atomic time. No undocumented problems found. 04/17/2009 08:23 scottl@b 03:LowExcCurrent,04:BadExcFreq,04:BadOscFreq,04:LowExcCurrent,04:TestTagFa ilure,05:TestTagFailure,06:LowExcCurrent,07:TestTagFailure: Problems will be addressed on the next site visit., 04/12/2009 08:04 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/11/2009 10:05 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/10/2009 11:37 Troy A site GMC was performed 04/10/2009. All transceivers were checked for tune and adjustments made where needed. Some pictures were taken of the enclosure with the most guana on it. Mold is starting to grow in the enclosure as a result of this. I will mention this to the site bio if I he is on site today. 04/10/2009 09:12 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/09/2009 08:38 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/08/2009 12:01 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/07/2009 08:31 alan@bay 05:TestTagFailure,07:TestTagFailure: Clearing TASS on known problematic systems. 04/06/2009 08:40 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 04/05/2009 10:25 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 04/04/2009 10:10 troy@bay 07:TestTagFailure: Known problematic system, clearing tass 04/02/2009 13:39 troy@bay 05:TestTagFailure,07:TestTagFailure: 07 is a known problematic system PSMFC will monitor 05 for future problems. 03/31/2009 08:24 troy@bay 07:TestTagFailure: Noted. 03/31/2009 08:24 troy@bay 05:TestTagFailure: The VTT may have issues. PSMFC will investigate on the next site visit. 03/30/2009 08:36 troy@bay 05:TestTagFailure,07:TestTagFailure: Noted 03/29/2009 09:43 darren@b 07:TestTagFailure: Alarm on problematic system 03/28/2009 08:02 darren@b 07:TestTagFailure: Alarm on Problematic system. 03/27/2009 23:35 darren@b 07:TestTagFailure: Alarm noted on problematic system. 03/26/2009 10:46 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 03/24/2009 09:14 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 03/19/2009 08:31 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 03/15/2009 09:06 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 03/15/2009 09:05 troy@bay 05:TestTagFailure: This will be looked into on the next site visit. 03/14/2009 08:28 troy@bay 07:TestTagFailure: Known problematic system, clearing TASS. 03/12/2009 08:30 troy@bay 07:TestTagFailure: Known problem, clearing TASS. 03/10/2009 08:12 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 03/09/2009 08:38 troy@bay 07:TestTagFailure: Noted, known problematic system. 03/08/2009 08:18 alan@bay 07:TestTagFailure: Clearing TASS on known problem antenna. 03/07/2009 06:47 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 03/06/2009 11:28 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic antenna. 03/05/2009 11:58 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 03/04/2009 15:18 scottl Performed GMC, all working transceivers were tuned and calibrated as necessary, no problems to report. 03/04/2009 08:36 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 03/03/2009 08:30 darren@b 07:TestTagFailure: This alarm is on a problematic detection system. 03/01/2009 08:19 darren@b 07:TestTagFailure,0C:LowExcCurrent,0D:TestTagFailure: The alarms on 0Cand 0D were generated during a brief period of time that the ladder was dewatered for debris removal. The ladder was watered-up shortly after work was completed. 02/26/2009 07:58 darren@b 07:TestTagFailure: Alarm on problematic system. 02/25/2009 14:50 scottl@b 05:TestTagFailure: Noted 02/25/2009 07:24 Darren I spoke with Brad Eby late yesterday and he informed us that the ladder is now back to normal flow, but the ladder will be coming down completely for a short period (less than a day) either Friday or Saturday for debris removal. He said he would send us an e-mail or phone call when the time was set so we could, if time allows, get down there to get our eyes on antennas 05 and 07. We may be able to inspect the conduit from above, but there may not be any access into the ladder. 02/19/2009 13:32 Darren Brad Eby (site biologist) responded to a message from PSMFC today indicating that on 2-18-09 at 09:00 the ladder was lowered to an orifice flow rate. They have discovered some debris which is causing some concern and the ladder may be completely de-watered to remove the debris. He will inform our office if/when the ladder is de-watered. 02/17/2009 07:17 darren@b 07:TestTagFailure: Clearing alarms on a problematic system. 02/16/2009 08:45 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/15/2009 11:05 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/14/2009 07:57 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/13/2009 07:29 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/12/2009 07:53 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/10/2009 07:42 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/09/2009 07:17 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/08/2009 09:27 troy@bay 07:TestTagFailure: Known probem antenna, clearing TASS. 02/07/2009 08:45 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 02/05/2009 08:26 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 02/04/2009 07:20 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 02/03/2009 15:43 Alan The OS on both PCs has been changed to Vista Business. Files MC209034.K2 and MC209034.L2 were created on PC2 during PC1's downtime. No problems found. 02/03/2009 10:09 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 02/02/2009 08:01 troy@bay 05:TestTagFailure,07:TestTagFailure: Known problem antennas, clearing TASS 01/29/2009 08:17 darren@b 05:TestTagFailure,07:TestTagFailure: 07 is a problematic system. We will investigate the 1 test tag failure on 05 during the next site visit. 01/25/2009 08:39 darren@b 07:TestTagFailure: Alarm on problematic system. 01/24/2009 09:20 darren@b 07:TestTagFailure: alarm on problematic system. 01/23/2009 08:08 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 01/22/2009 07:27 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 01/21/2009 07:53 Alan A GMC was performed 1/20/2009. All transceivers were checked and tuned as necessary. New data collection computers (Dell Optiplex/XP Pro) were deployed. The former PC1 was converted into the new utility PC. Files MC209020.M2, MC209020.N2 and MC209020.O2 were created on PC2 while PC1 was being configured. No undocumented problems found. 01/21/2009 07:30 alan@bay 07:TestTagFailure: Known problematic system, clearing TASS. 01/20/2009 07:51 alan@bay 07:TestTagFailure: Clearing TASS on a known problematic system. 01/19/2009 09:15 troy@bay 07:TestTagFailure: Noted 01/18/2009 08:16 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 01/17/2009 09:38 troy@bay 07:TestTagFailure: Known problem antenna. 01/16/2009 08:28 troy@bay 07:TestTagFailure: Known problem antenna, clearing TASS. 01/14/2009 07:22 troy@bay 05:TestTagFailure,07:TestTagFailure: 07 is a known problem antenna. PSMFC will monitor 05 for future occurances and address as needed. 01/13/2009 08:04 troy@bay 07:TestTagFailure: Known problem antenna. 01/11/2009 07:16 darren@b 07:TestTagFailure: Alarm on problematic system. 01/10/2009 07:31 darren@b 07:TestTagFailure: Alarm on problematic system. 01/09/2009 07:20 darren@b 07:TestTagFailure: Clearing TASS. Alarm on problematic system. 01/07/2009 07:05 darren@b 07:TestTagFailure,0C:LowExcCurrent,0F:LowExcCurrent,11:LowExcCurrent: Alarms generated by PSMFC personnel during a site GMC. 01/06/2009 14:28 Alan A GMC was performed 1/6/2008. All transceivers were checked and tuned as necessary. The clocks on both PCs (~4 min slow) were set to within one second of atomic time. Data files from 2008 were moved from the archive folder to the "Previous Years' Data\2008" folder on both PCs. It appears as through a large icicle fell into the 28x30 (CRW PTTX-2) that contains the antenna grounds for the north side of the ladder. The cabinet has been severely damaged to the point where it is no longer airtight. We will facillitate repairs. No other problems found. 01/06/2009 07:18 darren@b 07:TestTagFailure,11:LowExcCurrent,11:TestTagFailure: These alarms will be investigated during the next site GMC. I will adjust the current alarm threshold via PCA to minimize file size. 01/05/2009 07:36 darren@b 02:TestTagFailure,07:Overrun,07:TestTagFailure,11:TestTagFailure: Alarms on detection system 07 are on a problematic system. The other alarms will be investigated as soon as possible. 01/01/2009 00:00 PTOC_Bot Annual log file initiation for MC2 #### End of Event Log for MC2 ###