EVENT LOG FOR SITE MC2 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/26/2012 13:08 Troy These sites PC2 machines were upgraded from M4 1.4.8.0 to M4 1.5.0.0 12/14/2012 07:35 alan@bay 0D:TestTagFailure: No apparent reason for this one-time alarm. PTAGIS Field Operations will continue to monitor. 12/10/2012 14:03 Troy IPWorks temp license was added to the M4 Ver 1.4.8 machines. MC1,MC2 and ICH PC2 and MCJ's M4 platform. 12/08/2012 09:10 Troy These sites are not loading due to a trial license issue with the new technology integrated into 1.4.8. I have a support request to request the trial license. No need to downgrade or patch at this point. -----Original Message----- From: Mail_Bot@pittag.org [mailto:Mail_Bot@pittag.org] Sent: Friday, December 07, 2012 2:43 PM To: pitevent@ptagis.org Cc: John Tenney Subject: ICH,MCJ,MC1,MC2 Troy Sites M4 machines were upgraded to version 1.4.8. PSMFC will monitor and update the rest of the system early next week. 12/07/2012 14:42 Troy Sites M4 machines were upgraded to version 1.4.8. PSMFC will monitor and update the rest of the system early next week. 12/06/2012 07:02 Scott_Li Appears that the wireless link is down. Called EOT and placed trouble ticket. Tech to call Scott ASAP 12/05/2012 11:22 Roger Contacted the assistant site bio regarding the turbulance on antenna 01. He will check into whether the picketed leads need cleaning or the flow adjusted. 12/05/2012 10:07 Roger Performed site GMC on 12/5/2012. All transceivers were checked for tune and adjusted as needed. Viewing window transceiver 01 has periods of high noise levels. The water level at antenna 01 is high and is causing a washing machine effect. Also, the antenna hold down shims were shifted slightly up causing the antenna to shift back and forth. The shims were readjusted. However, the noise levels are still high. Will check to see if the picketed leads can be cleaned. PC1 and PC2 are within 1 second of atomic time and each other. There are no other problems to report. 11/28/2012 08:15 Troy@bay 0D:TestTagFailure: This will be addressed on the next site visit. 11/13/2012 08:10 alan@bay 0D:TestTagFailure: Noted, will monitor for future occurances. 11/08/2012 14:46 Troy These site's M4 PCs were upgraded from M4 1.4.4x64 to M4 1.4.6x64. 11/02/2012 12:12 Roger Performed site GMC on 11/2/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 re within 1 second of atomic time and each other. There are no problems to report. 11/01/2012 09:01 Troy The PC2 machine was upgraded from version M4 version 1.4.3 to 1.4.4. 10/22/2012 12:27 Scott_Li Went to the site to investigate the noise issue with antenna 01. After inspecting the connector and various possible noise sources, nothing was discovered that explains the noise event. For future reference, the video cameras are always on and not shut off by the fish counters. Still a mystery will monitor and try to be on-site when the noise is present. Current noise levels are at 0 to 3 percent and stable. 10/22/2012 06:27 Scott_Li Transceiver 01 is at 100 percent noise. Seems to have started around 1800 hrs on Friday, will investigate. 10/17/2012 06:32 Rclark@b 0D:TestTagFailure: Unknown cause for this one time alarm. Will continue to monitor. 10/14/2012 07:02 Darren There was a noise incident that caused the detection system 01 to go to 100% noise for a period of about 24 hrs, from 21:00on 10-12 to 21:00 10-13 it has since gone away but did cause the efficiencies to drop. No obvious reasons for this, current and phase did not change. we will investigate this during the next site visit unless it happens again. 10/11/2012 06:45 darren@b 0D:TestTagFailure: no direct cause for this alarm. will monitor for future alarms. 10/10/2012 11:40 Roger Performed site GMC on 10/10/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. Locker was restocked. There are no problems to report. 10/09/2012 06:20 darren@b 0D:TestTagFailure: No direct cause for this failure. will investigate during the next site visit. 10/08/2012 06:28 darren@b 0D:TestTagFailure: no direct cause for this failure. will continue to monitor for future alarms of this nature and address as necessary. 10/05/2012 06:25 Rclark@b 0D:TestTagFailure: This will be addressed during the next site visit. 09/27/2012 06:14 darren@b 01:LowExcCurrent: These alarms were generated by PSMFC personnel while performing a maintenance check. 09/26/2012 12:41 Darren A site GMC was performed today (9-26-12). All transceivers were checked and adjusted for tuning, noise, and detectability. There are no problems with the detection systems down below, PSMFC will be investigating the connector on antenna 01 due to an increase in noise during certain periods of time. This occured on antenna 03 earlier in the season and it was corrected by reseating hte cable onto the connector. The findings will be posted after this investigation. The PC clocks are within 1 second of atomic time and each other. 09/09/2012 06:36 darren@b 01:LowExcCurrent: This alarm will be investigated during the next site GMC. 09/05/2012 11:55 scottl Upgraded both PC1 and 2 to Minimon Ver. 1.70. Retreived all log files from both PC1 and 2. 09/04/2012 11:09 Roger Performed site GMC on 9/4/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 08/24/2012 07:58 Alan EOT is exepriencing an outage. They are working on restoring connectivity. More information to come. 08/21/2012 07:19 darren@b 01:LowExcCurrent: There appears to be a noise source that is pretty consistent in time. PSMFC will begin an investigation into this matter. 08/07/2012 10:22 Roger Performed site GMC on 8/7/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 07/30/2012 12:21 Roger Performed site GMC on 7/30/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 07/28/2012 06:39 darren@b 03:LowExcCurrent,03:TestTagFailure: These alarms were addressed by PSMFC personnel yesterday while on site to investigate the noise issues. 07/24/2012 12:38 Roger Performed site GMC on 7/24/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 07/22/2012 08:24 alan@bay 03:LowExcCurrent: This will be investigated during the next site visit. 07/18/2012 10:09 alan@bay 03:LowExcCurrent: This will be addressed during the next site visit. 07/17/2012 08:04 alan@bay 08:LowExcCurrent: Alarm caused by PTAGIS Field Operations personnel during a site visit. 07/16/2012 13:00 Alan In an effort to eliminate intermittent noise issues, transceiver 03 was replaced. Antenna 0A has an issue below the waterline. Transceiver 0A is only able to push ~1.5A, same thing with transceiver 08. Both transceivers can drive antenna 08. PTAGIS Field Operations will continue to monitor. 07/11/2012 06:45 Troy@bay 0A:LowExcCurrent: This will be addressed on the next site visit. 07/10/2012 13:44 Alan A GMC was performed 7-10-2012. All transceivers were checked and tuned as necessary. The clocks on both PCs are within one second of atomic time. Outstanding files on PC2 were archived. The DNS settings were updated on the utility PC. No problems to report. 07/10/2012 07:55 Troy@bay 04:LowExcCurrent: Noted 07/05/2012 14:46 scottl Changed DNS entries on all data collection computers including the utility pc's in prep for the network change over and as requested by Todd and Chris. Neither of these utility PC's could be accessed. Will look into why tomorrow. 07/03/2012 07:38 Don_Warf Antenna 03 at the counting window went into 100% noise for a portion of the day yesterday then returned to normal. Will continue to monitor. 06/28/2012 12:06 Roger Performed site GMC on 6/28/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 06/22/2012 08:05 Troy@bay 04:LowExcCurrent: Noted 06/21/2012 12:11 Roger Performed site GMC on 6/21/2012. All transceivers were checked for tune and adjusted as needed. Transceiver 04 is currently spiking noise up to 100%. This is probably due to the antenna failing. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no other problems to report. 06/13/2012 14:07 Rclark@b 0D:TestTagFailure: 0D:TestTagFailure: Transceiver was retuned on 6/13/2012. 06/13/2012 14:06 Rclark@b 0D:TestTagFailure: Transceiver was retuned on 6/13/2012. 06/13/2012 11:37 Roger Performed site GMC on 6/13/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 06/13/2012 06:24 darren@b 0D:TestTagFailure: Alarm will be investigated during the next site visit. 06/10/2012 06:27 rclark@b 0D:TestTagFailure: This will be checked during the next site visit. 06/09/2012 07:27 rclark@b 0D:TestTagFailure: Transceiver may be slightly out of tune. This will be addressed during the next site visit. 06/07/2012 14:17 scottl Performed site GMC, All Tranceivers were tuned and calibrated as necessary, no problems to report. 05/31/2012 08:05 Roger Performed site GMC on 5/31/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 05/23/2012 11:57 Roger Performed site GMC on 5/23/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 05/17/2012 06:38 Troy@bay 04:TestTagFailure: Noted 05/16/2012 13:46 Roger Performed site GMC on 5/16/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each otherFiles on PC2 were archived. The locker was inventoried. There are no problems to report. 05/09/2012 11:30 Roger Performed site GMC on 5/9/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 05/04/2012 07:59 alan@bay 04:LowExcCurrent: Noted 05/03/2012 07:15 alan@bay 04:LowExcCurrent: PSMFC will investigate on the next site visit. 05/01/2012 09:22 Roger Performed site GMC on 5/1/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 04/28/2012 08:35 alan@bay 04:LowExcCurrent: PSMFC will investigate on the next site visit. 04/26/2012 07:08 Troy@bay 04:LowExcCurrent: PSMFC will investigate on the next site visit. 04/18/2012 08:26 Roger Performed site GMC on 4/18/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. Files on PC2 were archived. There are no problems to report. 04/10/2012 13:16 Darren A site GMC was performed today (4-10-12). All transceivers were checked for tuning, noise, and detectability. The transceiver on antenna 04 was replaced as a test to see if the problem truly is at the antenna. The displayed current is 1.6A and the timer tag hit rate is a maximum of 92% when turned on. I will watch this system over the next two days and if needed I will return the original transceiver if the problem appears to be at the antenna. No other problems were discovered during this visit. 04/06/2012 06:49 alan@bay 06:LowExcCurrent: Noted 03/29/2012 07:54 scottl MC2 watered up for the season at 1200 2-16-2012 03/29/2012 07:27 scottl MC2 watered up for the season at 1200 2-16-2012 03/28/2012 07:16 alan@bay 04:LowExcCurrent,06:LowExcCurrent,06:TestTagFailure: Noted 03/27/2012 12:30 Darren A site GMC was performed today (3-27-12)All transceivers were checked for tuning, noise and detectability. The noise on antenna 04 was investigated and believed to be coming from the antenna. The cables were swapped with the next transceiver and the noise did drop for a short period and then began to bounce and rise. The cables were returned to the proper transceivers and within a short period the noise was at 90%. I was able to drop the power to 1.6A (minimum on the PS) and watched for about 10 minutes and it seemed stable however it may rise again over time. PSMFC will watch this system tonight and make any other attempts tomorrow if necessary. No other problems were discovered during this visit. 03/08/2012 08:51 Alan MC2 watered up for the season at 1200 2-16-2012. 03/06/2012 15:23 Alan No data exist on either PC to fill the gap, created by a power outage, from 2-27-2012 to 3-1-2012. 03/02/2012 07:56 rclark@b 06:TestTagFailure: There was a reader reset immediately prior to the test tag failure. There is no other apparent cause for the failure. 02/28/2012 07:31 Scott_Li Site is not submitting files and cannot access either PC1 or PC2. Will address and correct. 02/27/2012 16:00 Roger This is a further update on the AC power status at MC2. I contacted Carl Dugger and was informed that the electrical work is an upgrade for the new crane installation. He also stated that the power should be completely restored by March 1st as opposed to the end of the business day that was previously stated by COE personnel 02/27/2012 11:21 Roger According to Corp personnel, the power on the Washington shore ladder is currently down due to maintenance work on the main AC feed line. The power is scheduled to be restored by the end of the work day today (2/27/2012). 02/21/2012 07:20 Troy@bay 04:Overrun: Noted. 02/18/2012 08:24 darren@b 04:Overrun,04:TestTagFailure,06:TestTagFailure,0B:LowExcCurrent,0D:TestTag Failure,12:TestTagFailure,13:LowExcCurrent: Site down. Clearing TASS. 02/13/2012 07:33 darren@b 04:Overrun,04:TestTagFailure,06:TestTagFailure,0B:LowExcCurrent,0D:TestTag Failure,12:TestTagFailure,13:LowExcCurrent: Site Down. Clearing TASS. 02/06/2012 08:21 Alan MC2 was dewatered for maintenance at ~1000 2/1/2012. Estimated return to service is 2/22/2012. 01/26/2012 15:31 Roger There is a file gap of 1 hr 27 minutes on 1/25/212 between 15:00 and 16:27. This is due to a breaker being replaced. There is no recoverable data for this period. 01/25/2012 15:39 Roger The MC2 PIT tag room is currently down due to an electrical breaker being replaced. It should be back up with an hour. 01/25/2012 13:40 Roger Performed site GMC on 1/25/2012. All transceivers were checked for tune and adjusted as needed. PC1 and PC2 are within 1 second of atomic time and each other. No problems to report. 01/25/2012 07:52 Roger Received a phone call from the site Bio indicating that the transformer replacement ran into some unexpected delays. The power should be back up no later than noon today. 01/24/2012 14:26 Roger Went on-site to investigate communications issue with site. Found that power to the MC1 PIT tag room and all Oregon shore transceivers has been cut due to a transformer replacement. The estimated time of completion for the repair is end of the business day today (according to Robert Liedman). 01/21/2012 10:33 Troy@bay 04:TestTagFailure,0D:TestTagFailure: These alarms will be addressed on the next site visit. 01/21/2012 09:44 Troy PCA'ed into PC1 and rebooted the machine. Tried to push the files first but there was too much screen clutter to tell what was going on. Checked the files received but not loaded site and the files are there. 01/20/2012 09:34 Troy Another call was put in to EOT as the site keeps bouncing. PSMFC will monitor and push files if necessary. MC2 was verified to be up and collecting data but didn't have a good enough connection to push files. 01/20/2012 09:22 Troy The sonic wall has gone yellow. PSMFC will monitor to see if it recovers and files load automatically. 01/20/2012 07:39 Troy A call has been placed with EOT and awaiting a call back. 01/19/2012 07:08 Troy@bay 04:TestTagFailure: Noted 01/18/2012 08:15 Troy Manually pushed the delinquent file. 01/18/2012 08:06 Troy@bay 04:TestTagFailure: Noted 01/01/2012 00:00 PTOC_Bot Annual log file initiation for MC2 #### End of Event Log for MC2 ###