1995 Event Log MCJ -- McNary Juvenile ================================================== Fri Mar 8 1:38:29 PST 1996 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system 12/19/95 Stopped polling today. -- jen 12/12/95 De-watered facility. -- jen Wed Nov 22 1:22:17 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system 11/9/95 replaced backplane in controller #67. tested good. -Livingston- 11/9/95 Replaced fan in controller 71. Replaced clock card in controller 72. Controller 67 needs a new backplane and will be replaced 11/10/95. -Warf- 11/7/95 Reseated cards in controller 67. was locked up. also repaired sample room exciter.general maint, check found no other problems. -Livingston- Mon Oct 9 0:30:17 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system 09-14-95 The timer tag problems on coils 20,22 have been corrected. General maint. check found no problems. -Livingston- 08-05-95 Timer tags on diversion 20,22 are not firing. Fish was seen on these coils and efficiency was good. will correct problem A.S.A.P. -Livingston- 08-02-95 Brad Eby (corps biologist) called and said A-seperator slide gate was slamming on closure. Found that air pressure was at 80 psi. adjusted to 95 psi and tested good. -Livingston- 07-31-95 repaired controller for B-raceway coil 1A. Also Relaced cracked connector on A-seperator return signal. sticks ran 1000n gates -Livingston- 07-27-95 Repaired bad connections at a-seperator. stick tests ran at better than 98replaced exciter at b-raceway. -Livingston- 07-15-95 Timer tags have experienced recent problems although there associated coils are alive. the problems will be corrected A.S.A.P -Livingston 07-10-95 Replaced exciter on B-Seperator for poor Efficiency. stick tested at 100 Overall check found no problems. -Livingston- Sat Jul 8 0:56:54 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system 06-22-95 General maint check on site found no significant problems. Checked tune on a few select tunnels. -Livingston- 06-20-95 visited for general main. check. Ran sticks on both A and B seperators. 100 0.000000e+00fficiency with sticks. The piping system for the river release tunnels have been repaired. The power supplies for these have been turned back on. They are collecting fish starting 6/20 @ 0700. Per Brad. -Livingston- 06-14-95 Visited site for Maint check, found no problems. -Livingston- 06-11-95 Tuned B-sep, corrected problem with A-diversion timer tags. increase amperage on A-sep. The A-river and B-river tunnels have been shut down by the COE while maint. is being done on the piping system. No word on when this will be finished per Brad Eby. Could be awhile. -Livingston- 06-05-95 Corrected timer tag problems on b-diversion and b-river. Replaced fittings on a-sep solenoid. -Livingston- 06-04-95 A and B raceways are now on line and operating. Timer tag problems have been corrected. Also repaired exciter on A-sep to improve efficiency. -Livingston- 06-03-95 Replaced exciter on b-seperator to improve efficiency. According to the site biologist,they could start holding fish for transport in the raceways as early 6-5. found bad exciter on A and B raceways. -livingston- 05-30-95 Replaced solenoid for the A side slide gate. (per Livingston) -Warf- 05-26-95 Site personel report the site was down for maintenance from 7:30pm to 11:30pm on 05-25-95. -Warf- 05-21-95 Visited for maint. Everything checks ok. Worked on timer tags that are not firing. (per Livingston) -Warf- Thu May 25 1:33:16 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system downloaded: 8:20 am started load: 8:25 am load ended: 8:30 am --jen 05-19-95 A River tunnel will remain down until pipe is reworked. Fish will exit using the barge loading line to the river. -Warf- Fri May 19 2:27:37 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system started load: 2:05 pm load ended: 2:25 pm --jen 05-16-95 A River tunnel has been shut down due to a blockage in the pipe. -Warf- Tue May 16 3:34:33 PST 1995 A file(s) was missed while polling this site. When someone is here during PSMFC office hours it will be downloaded and processed. --automated message system started loading: 12:00 --jen loaded: 12:15 --jen Mon May 15 8:47 mcj95132.b was uploaded and processed this morning. -- jen 05-11-95 Mcj95130.a was not downloaded by mlink last night. it was manually downloaded this morning and will be pro- cessed. --jen loaded may 11 @ 12:30pm --jen 05-11-95 Timer tags on all separator tunnels have been removed until the NMFS slide gate study is over. -Warf- 05-10-95 Timer Tags on A/B Raceway and A/B Diversion monitors not working, but monitors are reading fish. -Stein- 05-08-95 Visited for maint. Retuned several coils and stick tested. (per Livingston) -Warf- 05-03-95 All exciters have been modified by Destron to better read the new tags. Both slide gates have been changed to trigger from all four coils. Tuned coil 4A. -Warf- 04-20-95 Coil 46 was down. Problem was traced to a cold solder joint in the signal filter. -Warf- 04-12-95 Coils 08 and 0A were down due to a power supply problem and is now operating. Coil 54 had low efficiency and was improved when the reader card was changed to another slot. -Warf- 04-13-95 Per Warf's note from 4/11/95, we have 3 bad mother boards on controllers. Spares have been ordered and have a 4 week lead time. In the mean time, Destron is looking into options to get us some good controllers. These controllers are, perhaps the oldest on the river (8 or 9 years old). -Stein- 04-07-95 Coils on both subsample tunnels are down due to controller problems. Corrected by switching slots in the controllers. Coils 50 and 52 were down due to the same problem. Corrected in the same way. Coils 50 and 52 also had an exciter with momentary losses of power. Replaced exciter with one from B raceway. B raceway will not be needed until mid June. At this time we have no good spare controllers or exciters. -Warf- 03-26-95 System watered up for the season. Site is tuned and ready. -Warf- ===============------ EOF MCJ ---===================