EVENT LOG FOR SITE NAU The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/21/2011 15:49 Ben An error with remote downloading resulted in a loss of data from 6/27 at 02:18 to 6/28 at 05:17 Ben Truscott Fish and Wildlife Biologist WA Dept. of Fish and Wildlife ben.truscott@dfw.wa.gov Office - 509.664.3148 ext. 14 Fax - 509.662.6606 12/01/2011 16:06 Ben The thermoelectric generator shut off resulting in power loss to the MUX from 11/22/11 at 13:25:58 to 11/28/11 at 14:28:33 Ben Truscott 09/13/2011 09:40 Todd Log event for Upper Nason- NAU. The Thermoelectric generator was off resulting in a power loss to the mux from 09-05-2011 11:06:18 to 09-07-2011 19:47:26. Todd Miller Fish and Wildlife Biologist Washington Department of Fish and Wildlife 3515 Chelan HWY. Wenatchee, WA 98801 Voice(509)664-3148 X24 Cell(509)630-3797 Fax(509)662-6606 Todd.Miller@dfw.wa.gov 02/28/2011 14:06 Dave Responsibility for operations at the upper and lower Nason Creek interrogation sites (NAU and NAL) has transferred from the Yakama Nation to WDFW. Todd Miller (Todd.Miller@dfw.wa.gov) is now the site steward at both locations, and Ben Truscott (Benjamin.Truscott@dfw.wa.gov) is the technical POC. 02/03/2011 11:59 Matt Antennas 2, 3, 5, 6 were damaged by debris on 01/16/11 and were repaired on 01/31/11. No data was collected from these antennas between 01/16/11 22:23:22 and 1/31/11 14:23:21. Antennas 1, 4 remained undamaged. 02/03/2011 08:52 Matt 1/31/2011 TEG was not operating upon inspection. TEG was restarted and all antennae are operating. 01/01/2011 00:00 PTOC_Bot Annual log file initiation for NAU #### End of Event Log for NAU ###