EVENT LOG FOR SITE NMC Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 12/28/2011 09:50 Hathaway 21 December 2011 11:18:53 System downloaded and shut down to replace backup battery and address noise issues. Restarted and collecting data at 12:00:00. 11/14/2011 10:42 Hathaway Site was constructed in 2008 but official data wasn't collected until 12 February 2011 11:09:46. Video box install 14-15 March 2011. Increased noise issues. New camera 12 May 2011. Pull camera and LED lights 18 May 2011. Video box removal 6 July 2011. All other video equipment removed 17-20 July 2011. Unplug thermostat from grid power 28 October 2011. Extreme noise levels have been occurring since 14 March 2011. Noise issues continue to occur and have not yet been identified. These high noise issues have caused reduced test tag detections and buffering and are represented by time gaps in the data. 08/11/2011 12:07 Nicole Initial entry for new interrogation site NMC - Ninemile Creek. Darin Hathaway (darin.hathaway@colvilletribes.com) is the data steward and technical point of contact. ####End of Event Log for NMC###