EVENT LOG FOR SITE PRA Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What -------- ----- -------- ----------------------------------------------- 12/11/2002 11:53 Darren_C PTOC setup the interrogation platform. There were no periphrials ready for connection. We were able to power up the data collection platform and verify each computer but no connectivity will be established until the wiremold, High Speed Interface Panel, Patch panel, and fiber optics are placed inside the trailer. The computers were covered with a tarp so that they could be moved out of the way when the insertion of the above components happens. I spoke with Chris Carlson and I said that we would keep in contact with Anthony Carson from Biomark on the status of the installation. The locker that was placed by Biomark was unboxed and I placed all extra components inside. 12/06/2002 12:55 Carter_S Site configurations added for BO3, RIA, PRA and IHA. ####End of Event Log for PRA###