EVENT LOG FOR SITE RIA Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What -------- ----- -------- ----------------------------------------------- 12/11/2002 09:45 Scott_Li PTOC installed the interrogation platform and all peripherals associated. This included mounting the HSIP and installing the backpanel. No network connection was available at the time so was unable to test the FTP file submissions to PTAGIS. The Pittag room is under construction and was unable to determine when it would be completed. I talked with the network administrator Randy Pauli ( Chelan Co. PUD.) about the network connectivity and how data is transferred to PTAGIS. He indicated that PcAnywhere remote access will absolutely not be permitted either dial-up or I/P. Anthony Carson will coordinate all efforts with the PUD and call PTOC if needed to establish the connection and automated file transfer to PTAGIS. 12/06/2002 12:55 Carter_S Site configurations added for BO3, RIA, PRA and IHA. ####End of Event Log for RIA###