EVENT LOG FOR SITE RIA The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/28/2011 07:21 Brett O&M visit on 10/26. Tuned and tested XCVR's and did windows updates on data computers. 10/05/2011 14:24 bturley@ 08:TestTagFailure: Test tag failure acknowledged 09/29/2011 06:32 bturley@ 05:TestTagFailure: Test tag failure acknowledged. 09/29/2011 06:31 bturley@ 08:TestTagFailure: Test tag failures acknowledged. 09/20/2011 11:55 Brett Anthony Carson of Biomark along with CCPUD electricians determined that the lightning strike on 5/31/11 damaged filter capacitors on two power supplies near Rock Island's left bank attraction water adjustable weir gates. The damaged capacitors created noise levels on the left ladder PIT tag system up to 100%. Both power supplies were replaced on 6/29/11 and the left ladder noise levels returned to pre-lightning strike levels. Also, CCPUD installed additional ground rods for the left ladder transceivers. With the exception of one tag being detected on XCVR 04 on 6/15, the high noise levels prevented any tag detection on the left ladder from approximately 14:30 PST on5/31/11 to 09:20 PST on 6/29/11. 09/08/2011 09:42 bturley@ 09:HighTemp: High temp alarms acknowledged. 09/06/2011 11:35 bturley@ 09:HighTemp: High temp alarms acknowledged 09/01/2011 11:20 Brett O&M visit on 8/30 and 8/31. Tuned antennas and updated the data computers. 09/01/2011 11:18 bturley@ 05:TestTagFailure,09:HighTemp,0A:HighTemp,0B:HighTemp,0C:HighTemp: Test tag failure and high temp alarms acknowledged 08/22/2011 06:29 bturley@ 05:TestTagFailure,09:HighTemp,0A:HighTemp: High temp alarms on 09 and 0A, and test tag failure on 06 acknowledged 08/15/2011 09:13 bturley@ 05:TestTagFailure: Test tag failure acknowledged 08/15/2011 09:12 bturley@ 09:HighTemp: High temp alarms acknowledged 08/11/2011 12:53 bturley@ 05:TestTagFailure: Test tag failure acknowledged 08/11/2011 12:53 bturley@ 0C:HighTemp: High temp alarms acknowledged 08/11/2011 12:52 bturley@ 0A:HighTemp: High temp alarms acknowledged 08/11/2011 12:51 bturley@ 09:HighTemp: High temp alarms acknowledged 08/02/2011 07:34 bturley@ 09:HighTemp,0A:HighTemp,0B:HighTemp,0C:HighTemp: High temp alarms on 09 0A 0B and 0C acknowledged 07/29/2011 08:16 bturley@ 09:HighTemp,0A:HighTemp: High temp alarms on 09 and 0A acknowldeged 07/25/2011 12:20 bturley@ 09:HighTemp,0A:HighTemp: High temp alarms acknowledged 07/19/2011 12:07 bturley@ 08:LowExcCurrent: Not sure what caused the drop in current below the alarm threshold. The subsequent DRS showed current level at its historical level. Will continue to monitor. 07/11/2011 06:00 bturley@ 02:BadOscFreq: Bad oscillator frequency alarm acknowledged 07/11/2011 05:59 bturley@ 05:TestTagFailure: Test tag failure acknowledged 07/11/2011 05:58 bturley@ 0A:HighTemp: High temp alarms acknowledged 07/11/2011 05:57 bturley@ 09:HighTemp: High temp alarms acknowledged 06/28/2011 09:02 bturley@ 09:HighTemp: High temp alarms acknowledged 06/09/2011 06:16 bturley@ 08:TestTagFailure: Test tag failure acknowledged 06/09/2011 06:15 bturley@ 03:BadExcFreq,03:BadOscFreq,03:LowExcCurrent: Alarms caused while testing transceivers on left ladder 06/09/2011 06:14 bturley@ 04:BadOscFreq,04:LowExcCurrent: BadOscFreq and LowExcCurrent alarms occurred while testing transceiver. 06/09/2011 06:11 Brett There was a lightning strike at RIA on 5/31 that apparently damaged the power to transceivers 01, 02, 03 and 04 on the left ladder. After the strike, noise from all four coils is 100%. We are working with Chelan PUD electricians to troubleshoot the problem. 06/06/2011 13:57 bturley@ 09:HighTemp: High temp alarms acknowledged 05/27/2011 08:23 PTOC_Bot On 5/26, I tuned and tested all 12 transceivers on the fish ladders and did some windows updates on the data computers. 05/12/2011 08:47 bturley@ 08:TestTagFailure: test tag failure acknowledged 03/25/2011 09:23 Brett I reinstalled the backup PC. However, network issues prevented me from connecting it to the network and internet. I tuned and tested all transceivers. 03/15/2011 08:09 bturley@ 01:TestTagFailure,02:TestTagFailure,05:TestTagFailure: Test tag failures acknowledged. 03/07/2011 08:49 Brett The right ladder was watered up on 3/4. The transceivers were activated at 1400 hours on 3/4. All ladders are now watered up at RIA. 03/02/2011 10:47 Brett The middle fishway was watered up and interrogation began on 3/1 at 0935. The right fishway is still dewatered. 02/24/2011 14:11 Brett The backup data PC at Rock Island died. It was off when I arrived and I could not turn it on. It is probably a bad power supply. I brought it back with me to the shop in Boise to repair. 02/17/2011 08:47 bturley@ 01:TestTagFailure,02:TestTagFailure: Test tag filures on coils 01 and 02 acknowledged. 02/10/2011 14:34 Nicole Updated obs_site_dates. 02/10/2011 09:23 Brett The right ladder was dewatered on Monday Feb. 7 at about 09:30 PST. The middle ladder remains dewatered at this time as well. 01/31/2011 07:56 bturley@ 08:LowExcCurrent: Low exciter current alarms caused when the ladder was de-watered for winter maintenance. Transceivers are now in standby. 01/26/2011 15:06 Brett The left fishway was watered up on Thursday 1/20. The transceivers were activated on 1/26 at 14:11. We weren't informed that the fishway was watered up, hence the delay in getting the transceivers turned back on. 01/21/2011 10:51 Brett The middle fishway was dewatered on 1/21/11 at about 08:00 PST. The left fishway remains dewatered as well. 01/20/2011 08:33 PTOC_Bot Left fishway was de-watered on 1/14/11. The middle ladder and right ladder are still in operation. 01/01/2011 00:00 PTOC_Bot Annual log file initiation for RIA #### End of Event Log for RIA ###